Professional Documents
Culture Documents
Institutional-Assessment-Tools Css
Institutional-Assessment-Tools Css
Institutional-Assessment-Tools
Evidence Plan
Competency
COMPUTER SYSTEM SERVICING NC II
standard:
Unit of
competency: SET-UP COMPUTER NETWORKS
Portfolio
Written
The evidence must show that the trainee…
Determines and plans the cable route
Identifies and obtains network materials
necessary to complete the work
Obtains the needed tools, equipment and
testing devices
Uses appropriate personal protective
equipment
Performs cable splicing based on standards
Installs network cables and cable raceway
Performs and check installation work
Follows5S and 3Rs
Check network connectivity of terminals
Undertake final inspections
Check computer networks
Prepare complete reports
Carry out communication checking between
Terminals
NOTE: *Critical aspects of competency
TABLE OF SPECIFICATION
# of
Objectives/Content
Knowledge Comprehension Application items/
area/Topics
% of test
Determining and
planning
cable routes in 10-12
3
accordance (1)
with network design
Kinds of network 13 14 15
materials 3
(1) (1) (1)
Types of tools,
equipment and 16-17 18
testing devices in 3
installation work (2) (2)
Written Test
a. RJ-11
b. RJ-30
c. RJ-45
d. RJ-50
a. Thin coaxial
b. Thick coaxial
c. Twisted pair
d. Fiber optic
Answer Key
Multiple Choice:
1. B
2. C
3. A
4. D
5. A
Performance Test
General Instruction:
The steps below are general Ethernet Category 6 (commonly known as Cat
6) cable construction guidelines. For our example, we will be making a
Category 5e patch cable, but the same general method will work for
making any category of network cables.
Specific Instruction:
Unroll the required length of network cable and add a little extra
wire, just in case.
Carefully remove the outer jacket of the cable.
Inspect the newly revealed wires for any cuts or scrapes that
expose the copper wire inside.
Untwist the pairs so they will lay flat between your fingers.
Arrange the wires based on the wiring specifications you are
following.
You can also use the mnemonic 1-2-3-6/3-6-1-2 to remember
which wires are switched.
Press all the wires flat and parallel between your thumb and
forefinger.
Keep the wires flat and in order as you push them into the RJ-45
plug with the flat surface of the plug on top.
Place the wired plug into the crimping tool.
Repeat all of the above steps with the other end of the cable.
Test the cable to ensure that it will function in the field.
QUESTIONING TOOL
Questions to probe the candidate’s underpinning Satisfactor
knowledge y response
Extension/Reflection Questions Yes No
1. Do you know What kind of cable are you going to use if
you want to network two computer units only?
2. What type of network would you recommend if your
client has only few computer units?
3. What type of cable are you going to use to connect two
computers?
4. What term is used to define one or more IP subnets that
are connected by the fast links?
Safety Questions
5. Responded to unplanned events or conditions in
accordance with established procedure?
6. Performed testing, documentation and pre-deployment
procedures?
7. Conducted operation and security check based on end-
user requirements?
8. Followed OHS policies and procedures?
Contingency Questions
9. What is the common type of cabling standards used for
straight thru cable?
10. After checking the cable with LAN tester and the tester
indicates that the output of the two ends swapped: pin
one goes to pin three from the other end, and pin two
goes to pin six on the other end, what does it signify? Is
it good or bad?
11. After configuring the network interface card, how will
you going to test the connectivity of your network?
12. In order for computers to network, what are the things
you are going to set or configure?
Job Role/Environment Questions
13. What would you do if you suspect that the cause of the
trouble in the network is the cable?
14. What would you do if the devices that you are going to
network are far from each other?
15. Checked operation of network services based on
user/system requirements?
16. Installed/updated required modules/add-ons based on
NOS installation procedures?
Rules and Regulations
Date Developed: Document No.
Trainers Methodology March 2023 Issued by:
Level I Date Revised:
Page 7 of
COTABATO STATE 6
Templates Developed by: UNIVERSITY
GUIALI G. ABAG
Revision # 01
Downloaded by Junmar Caldeo (junz6109@gmail.com)
lOMoARcPSD|18172285