Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

14

L 10

IP
TL a

TM TA

R R

0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+ 0.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3 Hm 4
HECTOMETER STONE
NOMOR PROFIL
SI1 SI2 SI3 SI4 SI5 SI6 SI7 SI8 SI9
S0

PROFILE NUMBER

121.8

171.8

221.8

271.8

321.8

371.8

421.8
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
21.8

71.8
0.0

21.8 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0


ACCUMULATED DISTANCE
12.14 12.14

12.17 12.17

12.04 12.04

12.28 12.28

12.18 12.18

11.75 11.75

12.28 12.28

12.34 12.34

12.04 12.04

12.31 12.31
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
YANG ADA
EXISTING

ELEVASI TANGGUL KANAN


RIGHT BANK LEVEL
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE
10.64

10.67

10.54

10.78

10.68

10.25

10.78

10.84

10.54

10.81
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
12.75

12.75

12.74

12.73

12.72

12.72

12.71

12.70

12.70

12.69
ELEVASI TANGGUL
BANK LEVEL
RENCANA
DESIGN

ELEVASI MUKA AIR RENCANA


DESIGN WATER LEVEL
12.15

12.15

12.14

12.13

12.12

12.12

12.11

12.10

12.09
12.10
ELEVASI DASAR SALURAN
BED LEVEL

You might also like