1 L11
1 L11
L 10
IP
TL a
TM TA
R R
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+ 0.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3 Hm 4
HECTOMETER STONE
NOMOR PROFIL
SI1 SI2 SI3 SI4 SI5 SI6 SI7 SI8 SI9
S0
PROFILE NUMBER
121.8
171.8
221.8
271.8
321.8
371.8
421.8
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
21.8
71.8
0.0
12.17 12.17
12.04 12.04
12.28 12.28
12.18 12.18
11.75 11.75
12.28 12.28
12.34 12.34
12.04 12.04
12.31 12.31
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
YANG ADA
EXISTING
10.67
10.54
10.78
10.68
10.25
10.78
10.84
10.54
10.81
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
12.75
12.75
12.74
12.73
12.72
12.72
12.71
12.70
12.70
12.69
ELEVASI TANGGUL
BANK LEVEL
RENCANA
DESIGN
12.15
12.14
12.13
12.12
12.12
12.11
12.10
12.09
12.10
ELEVASI DASAR SALURAN
BED LEVEL