Professional Documents
Culture Documents
Bitustick XL 1.6mm
Bitustick XL 1.6mm
6mm
(Cross Laminated Self-Adhesive
Waterproofing Membrane)
Bitustick XL
Cross laminated waterproofing membrane
Polymer modified bituminous self adhesive waterproofing membrane
CERTIFICATE 14/5138
CHARACTERISTICS
► Specially formulated for tropical climate grade
► Provides protection against water and vapor
► Self adhesive. Requires just peeling off the silicone film
and sticking to the surface
► Excellent adhesion to vertical and horizontal surfaces
► Excellent resistance to chlorides, sulphates, alkalis and
acids
TDS_Bitustick XL_GCC_0821
► Good tear and puncture resistance
► Excellent tensile strength
► Does not Contain Asbestos, Chromated copper arsenate
and Lead
puncture
resistance cross laminated waterproofing
1
DESCRIPTION
Bitustick XL is a self adhesive waterproofing membrane Allow the primer to dry prior to the application of the
based on a tropical grade of polymer modified bitumen. membrane. As the viscosity of the primer is low, it easily
The bitumen compound is laminated onto an impervious, penetrates into the concrete pores which promotes the
non-perforated, cross laminated HDPE film. Bitustick XL adhesion between the membrane and the concrete surface.
conforms to the requirements of BS 8102. In addition to that the primer also acts as a binder for the
dust which gets accumulated on the concrete surface even
FIELDS OF APPLICATION after cleaning.
Bitustick XL is used as waterproofing and damp proofing
membrane intended for concrete protection. It may be used
for horizontal and vertical application for tanking below
ground structures, subways and retaining walls. Bitustick R400
APPLICATION INSTRUCTIONS
The application temperature should be between 5°C to 55°C. Cement sand protective screed
61
Alignment HEALTH & SAFETY
Start the installation of all membrane plies from the low point
Bitustick XL contains a tacky bitumen compound and during
or drains, so that the flow of water is over or parallel to the
application can adhere to human skin. Bitumen stains can
plies, but never against the laps. All overlaps at the membrane
be removed by using a cloth dipped in a suitable cleaner.
seams shall be installed so as to have «up» slope laps over
«down» slope laps. Begin membrane application by unrolling TECHNICAL SPECIFICATION
the roll of Bitustick XL membrane and aligning the side laps.
PROPERTIES VALUES TEST
Application STANDARDS
Peel off the release film from the self adhesive side and start
Thickness, [mm] 1.6 / 2.1 DIN EN 1849-1
unrolling the membrane and press it to the surface. Smoothen
the membrane from the center to the edges with a wooden Mass per unit 1.6 / 2.1 DIN EN 1849-1
press in order to remove entrapped air. Furthermore, an iron area, [kg/m2]
roller shall be used for rolling on top of the applied membrane Top surfacing Cross -
to ensure a proper and strong adhesion of the bitumen laminated
compound with the base surface. Side overlaps shall be a HDPE film
minimum of 50mm on the selvedge and end overlaps 100mm. Softening point >105 ASTM D 36
Protection (R&B), [°C]
The membrane shall be protected immediately after Tensile strength, Long 42 ASTM D 882
application from damage, due to ongoing site activities or [Film] [N/mm2] Trans 48
from sharp aggregates during backfilling by a tough, weather, Elongation [Film], Long 230 ASTM D 882
warp and rot proof asphaltic protection board (Bituboard / [%] Trans 180
Bitustick R300/ Bitustick R400)*. Alternatively, on horizontal
Tear strength [Film], Long 340 ASTM D 1004
areas the membrane can also be protected by laying a
[N/mm] Trans 310
cement sand screed (50mm). Bituboard can be fixed with a
TDS_Bitustick XL_GCC_0821
double sided adhesive bitumen tape (Watertite TS 15)*. Adhesion strength, ASTM D 1000
primed substrate [N/mm] 2.0
HANDLING self [N/mm] 2.2
Bitustick XL membranes are packed in loose corrugated boxes to Puncture resistance,[N] >220 ASTM E 154
avoid any damage during transit or during storage at sites. Care Hydrostatic pressure No BS EN 12390
should be taken when storing the membranes at sites and should @7bar (70m) leakage (Part 8)
not be kept within close proximity of any sharp or protruding
edges to avoid puncturing or damaging the membrane. Water absorption, <0.14 AStm D 570
[Film] [%] @24hrs
2 STORAGE & SHELF LIFE Water vapor trans- <0.1 AStm E 96
Bitustick XL membranes must be stored in a shaded area on mission, [g/m2/24hrs]
wooden pallets neatly covered by a thick fabric and tied securely Chemical 2.5 -11.5 AStm D 543
in a manner that will minimize exposure to sunlight & UV. The resistance [pH]
membrane shall be protected from all sources of heat. The shelf
Low temp flexibility, ≤-15°C AStm D 1970
life is 12 months if stored as per recommendations. Excessive
exposure to sunlight, UV and other sources of heat will result in Crack bridging ability, >1.5mm ASTM C 836
considerable deterioration of the product and reduce its shelf life. VOC [g/l] <50 ASTM D3960/
D2369
SUPPLY
All values given are subject to 5-10% variation
Bitustick XL 1.6 mm 1m x 10m wt 16kg#
Apart from the information given here it is also important to observe the relevant
2.1 mm 1m x 10m wt 21kg# guidelines and regulations of various organisations and trade associations as
well as the respective standards. The aforementioned characteristics are based
Polyprime SB 20L pail & 200L drum on practical experience and applied testing. Warranted properties and possible
uses which go beyond those warranted in this information sheet require our
Bituboard 3.2 mm 2m x 1m wt 7.7kg# written confirmation. All data given was obtained at an ambient and material
6.0 mm 2m x 1m wt 14.0kg# temperature of +23°C and 50 % relative air humidity at laboratory conditions
unless specified otherwise. Please note that under other climatic conditions
Bitustick R300 1m x 10m 27kg# hardening can be accelerated or delayed.
The information contained herein, particularly recommendations for the
Bitustick R400 1m x 8m 22kg# handling and use of our products, is based on our professional experience.
As materials and conditions may vary with each intended application, and
Watertite TS 15 50mm x10m wt 0.6kg# thus are beyond our sphere of influence, we strongly recommend that in each
case sufficient tests are conducted to check the suitability of our products
for their intended use. Legal liability cannot be accepted on the basis of the
Woodenpress 140mm x 210mm contents of this data sheet or any verbal advice given, unless there is a case
of wilful misconduct or gross negligence on our part. This technical data sheet
Iron Roller Head dia 38mm Wt 1.5kg# supersedes all previous editions relevant to this product.
(recommended Width 100mm
specification) Length 350mm
# Approximate weight
METHOD STATEMENT
BITUSTICK XL
SECTION I: GENERAL INSTRUCTIONS
All materials whether loose or on pallets have to be stored in a covered area and protected from
UV and sunlight. Damage to the membrane may be caused due to improper storage and at high
temperatures.
Application of membranes should be avoided in case of extreme weather conditions like sand
storm or rain.
The ambient temperature during application should be between 5°C and 55°C.
The following Equipment’s are required during application:
Protective clothing:
Gloves, face mask, overalls, and safety goggles
Application equipment’s:
Slow speed drill machine with less than 500 rpm with a suitable spiral mixer
Wooden press & lap rollers
Brush /roller
Steel scrapper
Cotton waste
Solvent cleaner
Measuring tape
Cutting knife, scissors
SECTION II: APPLICATION INSTRUCTIONS
Surface Preparation:
The concrete surface shall be cleaned thoroughly of all contaminants like dust, traces of curing
compound, oil, grease. All surface imperfections and protrusions are to be removed and repaired.
Structurally unsound and friable concrete must be removed and repaired with a suitable concrete
repair mortar. All nail heads and protrusions that are likely to puncture the membranes must be
removed.
Provide a 45-degree cement sand angle fillet on all internal corners and a 20mm chamfer on all
external corners.
Priming:
All concrete surfaces shall be primed by solvent based bitumen primer (POLYPRIME SB) as per
ASTM D 41 /BS 3416. Mix the contents of the pail/drum prior to the application to remove any
sediment. Apply the primer @ 4-6 m²/lt by a brush, roller or an airless spray. Allow the primer to dry
prior to the application of the waterproof membrane.
If membrane application gets delayed for more than 24 hours after the primer has been applied on
the concrete surface, then apply a fresh coat of the primer again.
Application-Flat Horizontal Surfaces:
BITUSTICK XL membranes shall be installed from the low point or drains, so the flow of water is
over or parallel to the plies, but never against the laps. All overlaps at the membrane seams shall
be installed so as to have "up" slope laps over "down" slope laps.
Unroll only the required length of the membrane and cut the pieces to the desired length and
shape.
Place the membrane pieces on the area to be covered and check whether the piece’s match with
the profile of the marked substrate.
MS_Bitustick-XL_GCC_0917_GR0
Re-roll the membrane for about half the length without changing its orientation. Then slowly unroll
the membrane, peel off the release film and carefully place the membrane on the surface.
Smoothen out any entrapped air by pressing from the center to the sides by the wooden press.
Furthermore, an iron roller shall be used for rolling on top of the applied membrane to ensure a
proper and strong adhesion of the bitumen compound with base surface.
The subsequent rolls shall be laid to have a 50mm overlap on the selvedges and end overlaps of
100mm.
A 50mm cement sand protective screed (with 10mm down aggregate size) shall be provided on top
of the applied membrane in order to protect it from damage from reinforcements and sharp
aggregates present in the concrete.
Application-Vertical Surfaces
Reinforcing strips of 200mm width cut out from the BITUSTICK XL membrane shall be applied on
all the corner joints.
Dimension of the area, which needs to be waterproofed, shall be taken and the membrane is
aligned accordingly. The membranes are then re-rolled and then un-rolled slowly and stuck to the
surface by peeling off the silicone release film and exposing the self-adhesive side. Entrapped air
shall be smoothened out from the center to the sides by a wooden press followed by rolling with an
iron roller to ensure a proper and strong adhesion of the bitumen compound with base surface.
The membrane will be finished on the top by tucking into a groove cut in the concrete and sealed
with a suitable mastic sealant.
The applied membranes shall be protected immediately from the ongoing site activities or from
sharp aggregates during backfilling with a tough, weather, warp and rot proof asphaltic protection
board (BITUBOARD) of suitable thickness.
Fixing of Protection Board:
MEMBRANE REPAIR
In case of the BITUSTICK XL membrane getting punctured due to the ongoing site activities, the
following repair procedures shall be followed.
Minor pinhole of diameters less than 0.5mm will not affect the waterproofing properties of the
system, since the highly elastic SBS compound has a self-healing property and will tend to cover
and extend over the puncture and seal it.
Larger damages shall be patched repaired with a piece of the same membrane which extends at
least 100mm from all the sides of the puncture. The area to be repaired shall be primed with the
bitumen primer and allowed to dry before carrying out the patching works.
Safety Data Sheet according to Regulation (EC) No 1907/2006
Page 1 of 9
SDS No. : 567402
BITUSTICK XL V001.0
Revision: 07.11.2017
printing date: 29.11.2017
Replaces version from: -
Utd.Arab.Emir.
psra.imea@henkel.com
HAAD Poison and Drug Information Center UAE, TOLL FREE TEL. NUMBER 800-424
Classification (CLP):
Substances and preparations marketed in a specific form or within specific containers need not to be classified according to
the REACH Regulation Article 3 (3).
Substances and preparations marketed in a specific form or within specific containers need not to be classified according to
the REACH Regulation Article 3 (3).
General information:
In case of adverse health effects seek medical advice.
Inhalation:
Move to fresh air, consult doctor if complaint persists.
Skin contact:
Rinse with running water and soap. Apply replenishing cream. Change all contaminated clothing.
Eye contact:
Rinse immediately with plenty of running water, seek medical advice if necessary.
Ingestion:
Rinse mouth and throat. Drink 1-2 glasses of water. Seek medical advice.
4.2. Most important symptoms and effects, both acute and delayed
No data available.
4.3. Indication of any immediate medical attention and special treatment needed
See section: Description of first aid measures
Hygiene measures:
Wash hands before work breaks and after finishing work.
Do not eat, drink or smoke while working.
Valid for
Utd.Arab.Emir.
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 0,5 Time Weighted Average AD TLV
8052-42-4 (TWA):
[ASPHALT (BITUMEN) FUME AS
BENZENE-SOLUBLE AEROSOL,
INHALABLE FRACTION OF THE
AEROSOL]
Asphalt 5 Time Weighted Average GCC TLV
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Asphalt 5 Time Weighted Average UAE OEL
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Asphalt 5 Time Weighted Average DB OEL
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Calcium carbonate 10 Time Weighted Average DB OEL
471-34-1 (TWA):
[CALCIUM CARBONATE, INHALABLE
DUST]
Calcium carbonate 4 Time Weighted Average DB OEL
471-34-1 (TWA):
[MARBLE, RESPIRABLE
LIMESTONE, RESPIRABLE]
Calcium carbonate 4 Time Weighted Average DB OEL
471-34-1 (TWA):
[CALCIUM CARBONATE, RESPIRABLE
DUST]
Calcium carbonate 10 Time Weighted Average DB OEL
471-34-1 (TWA):
[MARBLE, TOTAL INHALABLE
LIMESTONE, TOTAL INHALABLE]
Distillates (petroleum), solvent-refined 0,2 Time Weighted Average AD TLV
heavy paraffinic (TWA):
64741-88-4
[OIL MIST, MINERAL]
Distillates (petroleum), solvent-refined 5 Time Weighted Average AD TLV
heavy paraffinic (TWA):
64741-88-4
[MINERAL OIL, PURE, INHALABLE
FRACTION OF THE AEROSOL
MINERAL OIL, HIGHLY AND
SEVERELY REFINED, INHALABLE
FRACTION OF THE AEROSOL]
MSDS-No.: 567402 BITUSTICK XL Page 5 of 9
V001.0
Valid for
Bharain
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 5 Time Weighted Average BH TLV
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Asphalt 5 Time Weighted Average GCC TLV
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Valid for
Egypt
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 0,5 Time Weighted Average EG OEL
8052-42-4 (TWA):
[ASPHALT (PETROLEUM) FUMES ( AS
BENZENE SOLUBLE AEROSOLS)]
Calcium carbonate 10 Time Weighted Average EG OEL
471-34-1 (TWA):
[CALCIUM CARBONATE (INCLUDING
LIMESTONE AND MARBLE), TOTAL
DUST CONTAINING NO MORE THAN
1% CRYSTALLIZED SILICA AND NO
ASBESTOS]
Distillates (petroleum), solvent-refined 5 Time Weighted Average EG OEL
heavy paraffinic (TWA):
64741-88-4
[MINERAL OIL MIST (EXCEPT
IRRITANT OIL)]
Distillates (petroleum), solvent-refined 10 Short-term Exposure Limit EG OEL
heavy paraffinic (STEL):
64741-88-4
[MINERAL OIL MIST (EXCEPT
IRRITANT OIL)]
Valid for
Jordan
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 5 Time Weighted Average JO TLV
8052-42-4 (TWA):
[ASPHALT]
Valid for
Kuwait
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 5 Time Weighted Average GCC TLV
8052-42-4 (TWA):
[ASPHALT (FUMES)]
Asphalt 5 Short-term Exposure Limit KW OEL
8052-42-4 (STEL):
[ASPHALT (FUME)]
Asphalt Harmful Concentration for Unknown KW OEL
8052-42-4 risk to health and life:
MSDS-No.: 567402 BITUSTICK XL Page 6 of 9
V001.0
[ASPHALT (FUME)]
Calcium carbonate 10 Time Weighted Average KW OEL
471-34-1 (TWA):
[MARBLE (CALCIUM CARBONATE),
TOTAL]
Calcium carbonate 5 Time Weighted Average KW OEL
471-34-1 (TWA):
[MARBLE (CALCIUM CARBONATE),
INHALED]
Calcium carbonate Harmful Concentration for Unknown KW OEL
471-34-1 risk to health and life:
[MARBLE (CALCIUM CARBONATE),
INHALED]
Calcium carbonate Harmful Concentration for Unknown KW OEL
471-34-1 risk to health and life:
[MARBLE (CALCIUM CARBONATE),
TOTAL]
Valid for
Israel
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 0,5 Time Weighted Average IL OEL
8052-42-4 (TWA):
[ASPHALT (BITUMEN) FUME, AS
BENZENE-SOLUBLE AEROSOL,
INHALABLE FRACTION]
Distillates (petroleum), solvent-refined 5 Time Weighted Average IL OEL
heavy paraffinic (TWA):
64741-88-4
[MINERAL OIL, EXCLUDING METAL
WORKING FLUIDS, PURE, HIGHLY
AND SEVERELY REFINED,
INHALABLE FRACTION]
Valid for
Kenya
Ingredient [Regulated substance] ppm mg/m3 Value type Short term exposure limit Regulatory list
category / Remarks
Asphalt 5 Time-weighted average KE OEL-RL
8052-42-4 (TWA) OEL-RL:
[ASPHALT, PETROLEUM FUMES]
Asphalt 10 Short-term OEL-RL: KE OEL-RL
8052-42-4
[ASPHALT, PETROLEUM FUMES]
Calcium carbonate 5 Time-weighted average KE OEL-RL
471-34-1 (TWA) OEL-RL:
[MARBLE RESPIRABLE DUST
CALCIUM CARBONATE RESPIRABLE
DUST
LIMESTONE RESPIRABLE DUST]
Calcium carbonate 10 Time-weighted average KE OEL-RL
471-34-1 (TWA) OEL-RL:
[MARBLE TOTAL INHALABLE DUST
LIMESTONE TOTAL INHALABLE DUST
CALCIUM CARBONATE TOTAL
INHALABLE DUST]
Respiratory protection:
Not needed.
Hand protection:
Not needed.
Eye protection:
Not needed.
12.1. Toxicity
No data available.
No data available.
No data available.
No data available.
No data available.
Waste code
170302
MSDS-No.: 567402 BITUSTICK XL Page 9 of 9
V001.0
14.7. Transport in bulk according to Annex II of Marpol and the IBC Code
not applicable
15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture
VOC content 0%
(VOCV 814.018 VOC regulation
CH)
Further information:
This information is based on our current level of knowledge and relates to the product in the state in which it is delivered. It is
intended to describe our products from the point of view of safety requirements and is not intended to guarantee any
particular properties.
The product is intended for industrial use.
Relevant changes in this safety data sheet are indicated by vertical lines at the left margin in the body of this document.
Corresponding text is displayed in a different color on shadowed fields.
PROJECT REFERENCES BITUSTICK XL
R1028/1 - Extension of Tripoli Road & Improvement of Algeria Road (Contract-1) Larsen & Toubro Limited Aurecon Engg. RTA
R1005/1: Improvement of Al Awair Road & International City Accesses, Dubai Afcons Constructions Louis Berger DEWA
Construction of Pump Station in Front of Sheikh Zayed Mosque Phase 1 Contract No. 2016/102, Ajman AHC CDM Smith Govt. of Ajman Municipality
R1029/1 Development of Latifa Bin Hamdan Street (Contract -1) National Contracting CDM Smith RTA
R1068-Hotel Staff Accommodation in Warsan 3 On Plot No. 811-1445, Dubai , UAE - Infrastructure Works KAD Construction LLC Al Wasl Al Jadeed DMF
Night Market & Boardwalk - Plam Deira UNEC AE7 Consultancy Services Nakheel
Deira Islands Development Island B, DMS145103 Roads and Utlities Target & Jima AE7 Consultancy Services Nakheel
R1005/1: Improvement of Al Awair Road & International City Accesses, Dubai Afcons Constructions Louis Berger RTA
R1050 Rasl Al Khor Development Road & Infrastructure Engineering Construction Package on Plot No. 614-
Ghantoot Road Contg. Dewan CDM Smith WASL
0283
Infrastructure Works for Construction and Completion for (500) Houses in Oud Al Muteena, Dubai Ghantoot Trans. & Gen. Co Passons Overseas RTA
Emirates Flight Training Organization Facilities at DWC Building Facilities, Dubai Hassan Salmeen Bldg. Contg. Dar Al Handasah Emirates
Night market & Boardwalk - Palm Deira UNEC AE7 Consultancy Nakheel
0176 Al Khawaneej Community - Road & Infrastructure, Dubai Kier Dubai AECOM MERAAS
Link Road Between Sheikh Khalifa Street (Fujairah) with Khatam Al Munalaha Border Post and Road E99
Fala Road Contracting Idroesse Ministry of Infrastructure
Phase-1)
The Complete Construction of Surface Parking (P1 & P2) for Dubai Parks and Resorts Hill International HSS Dubai Parks & Resorts
KR513 (C135JA) Upgrade of Road 811, Jebel Ali - Phase II, Dubai Khansaheb ATKINS DP World
DPDP 6010 P-1575, Villa Development @ Al Ain Road (Infrastructure Works) NCC Arif & Bintoak MERAAS
R-999/5: DUBAI WATER CANAL PROJECT- PACKAGE 5 COMPLETION OF BUSINESS BAY OUTSTANDING EMIRATES ROADS CONTRACTING PARSONS RTA
WORKS CO
UPGRADING OF SUBSIDIARY SEWAGE PUMPING STATION G1 TO G7 Mabani Delma General Contracting ITAL Consultant Dubai Municipality
R 879/1 JAFZA Flyover near IC 10 on Sheikh Zayed Road Wade Adams Contracting HYDER RTA
Jebel Ali STP Phase-2 Six Construct AECOM Dubai Municipality
TRISTAR ENGINEERING AND PARSONS INTERNATIONAL
60-005 THE VILLAGE SUPPORTING INFRASTRUCTURE EXPO 20/20 Devlopment
CONSTRUCTION LTD.
MUDON P-123, ROADS & INFRASTRUCTURE WORKS, NEIGHBOURHOOD "J" - ARABELLA 2 WADE ADAMS CONTRACTING LLC AECOM MIDDLE EAST DUBAI PROPERTIES
R1009: ROADS IN NAD AL SHIBA FOURTH EMIRATES ROADS CONTRACTING AURECON RTA
CO
DS 158 (Main irrigation lines on Shk Zayed Road) Wade Adams Contg MWH DM
Upgrade Junctions @ Dubai International Airport Road – Package 1 & 2 Al Habtoor Leighton LLC Louis Berger RTA
R902/4B Extension of Academic City Road Wade Adams Contracting CDM SMITH RTA
Jumeirah Park Project No. DMS140563 Arco General Contg. Dar Al Handasah Nakheel
R921/1B : Improvements of Al Wasl Road - Phase 1B Interchange 2.5 China State Construction Parsons Overseas RTA
R1041 Dubai parks Access from Sheikh Zayed Road China State Const. Parsons Overseas RTA
Juwaiza Development - Road and Infrastructure Works Al Marwan Gen. Cont. Co Khatib & Alami Juwaiza Development
Al Furjan - Infrastructure Phase 2 - Packages 8, 9 & 10 Target & Jima Const.Co. LLC Arif & Bintoak Nakheel
Deira Island Development island B Roads and Sewerage Network Al Marwan General Contg. AE7 Consultancy Nakheel
R881-2C: Automatic Irrigation and Landscaping Works for Comprehensive Improvements of Parallel Roads
Hills & Fort Landscape Passons Overseas RTA
(Phase - 2C), Dubai
Cycle Track Underpass @ Meydan Wade Adams Contg Parsons RTA
Access to Bluewater Island Project Al Habtoor Leighton Parsons RTA
Contract No. 700-247 | External Works Al Alam Island - Phase 2 Sharjah General Contracting CompanyWSP Middle East MOPW
MBR Development - Dubai Hills Estate Shallow Services & Internal Road main Road 2 & 3 Package 4 Wade Adams Contracting parsons Emaar
Construction of Roads & Sewerage Networks for Deira Island A Wade Adams Contg AQLEH Engg Consultant Palm Deira LLC
RTA 902/2A Improvement of Mohd Bin Zayed Road - Stage 2 - Phase 2 Wade Adams CDM Smith RTA
R983 Pedestrian Bridges at Various Locations in Dubai Waagner Biro Gulf LLC Louis Berger RTA
RT881/Improvement of parallel Roads 2A1 & 2A2- Business Bay Al Naboodah Contracting Parsons RTA
Dubai Metro, Union Square Baniyas Road, Dubai DURL Conortium SYSTRA RTA
Landscaping Of Interchange No.1 On Sheikh Zayad Road Zaid Al Hussain LLC Parsons RTA
Fifth Industrial Square Upgreading In Sharja Sharja Genaral cont LLC Halcrow Ministry Of Public Works
Dubai Water Canal Infra. Package - 3 Canal and Coastal Wroks Besix Halcrow Int"l Partnership RTA
Residential Plots At Al Quoz 1v , Dubai Uae Dutco Balfour Beatty Llc Arif & Bintoak Private
Extension of Emirates Road (From Al-Aqran USA to Al Taween Road RAK) Fala Road Contg. Core Alliance Ministry Of Public Works
Dubai Substainable City Project Jeet Contg. Modular Design Diamond Developers
Reem Oasis Development - Phase 2 Reem Binladin Contracting Group LLC CH2MHILL Halcrow Emaar / Reem
Phase Iii Tankfarm Expansion Project Arcadestar Construction Ws Atkins Petrochem Fze, Jafza
Improvement of Al Khail Road, (Yalayis Road) R842/6 ERC Aecom RTA
Arabian Ranches Development main Sewerage Pumping Station and Associated Works Binladin Contg. Group Parsons Int'l Limited Emaar
Construction of Lussaily Reservoir Phases 1 & 2 (120 MIG) @ Dubai Ghantoot Gulf Contracting Co. DEWA DEWA
DS165 (Stage 1) Rising main for Pumping Station "R" Al Naboodah MWH Dubai Municipality
Dubai Metro DURL (Sub-Contractor : NCC) SYSTRA/ PARSONS RTA
Al Zahia Development Phase 2A Al Qabdah Building Contg. Jouzy Majid Al Futtaim
Meydan Geights Villas Project Shapoorji Pallonji Aqleh Consulting Engg. Meydan
DS190/1,
/ G - Pumping
, Station Supporting 1200mm
p Diag Risingp Main p Arabtec Engg. MWH Dubai Municipality
Jumeirah Target & Jima Const. NJS DEWA
Internal Roads in AL Quoz Second - Phase 1 AL Rajhi Const. Hyder RTA
PT-79-Roads & Infrastructure Services - Contacts 3, 4 & 6 Wade Adams Contg. Aecom Tamdeen
Dibba Ring Road & Central Road Darwish Engineering Emirates Halcrow Int"l Partnership Director of Public Work
Dibba Harbour and Beaches - Phase 2 Darwish Engineering Emirates Halcrow Int"l Partnership Director of Public Work
Contract: R824 - Roads in Al Qouz IV Darwish Engineering Emirates Al Turath Engg. RTA
R860 - Roads in Al Quasais Third Community No. 234 ERC Al Turath Engg. RTA
Maintenance & Dualization of Undualized Parts @ Khorfakkan ERC Conser Ministry of Public Works
7W 11/ 2x4 MIG, 1x0.5MIG & 1x0.1 MIG Rcc Water tanks @ Dibba, Fujairah Essa Engg. FEWA FEWA
Peral Jumeira Development Package - 2 Infra. Works Binladin Contracting Group LLC Dar Al-Handasah Nakheel
Construction of Internal Roads in RAK Package 1 ERC Dprsch Gruppe Crown Prince Court
R881/3A: Comprehensive Improvement of The Parallel Road Todini Costruzioni De Leuw Cather RTA
R838 Roads in Al Warqa 1, 2, 3 & 4 ERC Parsons Overseas Limited RTA
Truck & Usedd Spare Parts Roda & Infrastructure Package @ Dubai Binladin Contracting Group LLC General Project Deprt. Dubai Municipality
R881/2A, Comprehensive Improvements of the Parallel Roads ERC Parsons De Leuw Cather RTA
Rehabilitation of Jabel Ali Lihbab Road Interchange No. 8 - Sheikh Zayed Road Binladin Contracting Group LLC Aecom Middle East RTA
Dubai World Central Al Naboodah Contracting Dar Al Handasah DACC
Shah Gas Development @ Abu Dhabi Samsung Engineering Samsung Al Hosn Gas
Inter Refineries Pipelines - II Project Agreement No: 10-5595-E-12 GS Engg. & Const. Co. Tebodin Takreer
Ajman Treatment Plant Process Enhancement Modification Six Construct Halcrow Ajman Sewerage Co.
DS 191, New Pumping Station and Rising Main 800mm Dia. @ Int'l City Dubai Kier Dubai Khatib & Alami Dubai Municipality
Project DS159/1 - Irrigation Main Line for Al Qudra Oasis Binladin Contg. MWH Dubai Municipality
Project No. R/10/2010-Outer By-Pass Link China State Const. Idroesse Infra. Ministry of Public Works
DS165 (Stageb1) Rising Main for Pumping Station 'R' Al Naboodah MWH Dubai Municipality
P613FZ. C100 Jafza South Infrastructure Phase 4 Khansaheb Khatib & Alami JAFZA
132/11 KV Substation at E12, Zayed Sport City, Adnec Capital Centre, Abu Dhabi Consortium Energo Transco
Jahra Road Construction , Completion and Maintenance Contract - RA/166 Arab Contractor L&B / Pace MPW
Ruwais Refinery Expansion Actco General Contg. Tebodin Takreer
Construction Of Al Ghafat Reservoir Phases 1 & 2 (120mig) Pratibha Industries Ltd. Njs Dewa
Construction, Execution, Upgrading And Dualization Of Dibba - Masafi (2) Al Rajhi Const. Conser Government
R881/2a: Comprehesive Improvement Of Parallel Roads Sung Won Corporation Parson RTA
Infrastructure Works For Majan District Erc Khatib & Alami Mizin
Lsc Plant At Jebel Ali Depot Arcade Star Constn. Mott Macdoland Smme
Improvements Of Al Khail Road - Umm Suqaim Road Junction 17 Wade Adams Aecom Middle East RTA
AL QUSAIS CAR PARK & RELATED FACILITIES Dhabi Contg Archgroup Dubai Silicon Oasis
Jebel Ali Village - Infrastructure Works For Package 1 Of Phase 1 Al Naboodah Engg RTA RTA
Hamriyah Free Zone Cloverleat Interchange Darwish Engineering Burt, Hill Nakheel
Najmath Abu Dhabi Bridges Package 1 At Al Reem Island National Project & Const Halcrow Int'l Shj. Government
R855/2a - Nad Al Sheba Raco Course Development Stage 2a Project Afcons Const. Gibb Ltd` Reem Developers
Plam Jebel Ali - Construction Of Crescent E Roads & Infrastructure Wade Adams Contg Africon - Al Burj (J.V) RTA
R818/2 Beautification And Development Of Al Mamzar Area - Al Nadha 2 Emirates Road Contg. HYDER Nakheel
R818/2-Asphal Works For Internal Roads & Parking In Al Nadha Emirates Road Contg. De Leuw Cather RTA
Construction Of Mushrif Reservoir Phases 4, 5 & 6 (180mig) Mammut Group F.Z.Co. NJS DEWA
Dubai Waterfront - Madinat Al Arab District - B & C, Phase 1 Infrastructure Emirates Road Contg. Njs Dewa
R829/4-Access Arrangement To Rashidiya Park & Ride Station Emirates Road Contg. Mouchel Nakheel
Improvement Of Al Khail Road, Al Khail Road- Emirates Road Jn (9) R842/1 Emirates Road Contg. De Leuw Cather RTA
DUBAI WATERFRONT - MADINAT AL ARAB DISTRICT - D, PHASE - 1 Al Rajhi Const Cansult Ltd. RTA
Amphitheatre At Dubai Land Proscape Llc Mouchel Nakheel
R881/3a: Comprehensive Improvement Of The Parallel Road Todini Costruzioni Africon Mizin
CONSTRUCTION OF CRESCENT A ROADS & INFRASTRUCTURE Al-Rajhi Construction Llc De Leuw Cather RTA
Improvement Of Al Khail Road - Emirates Road Jn (9) R842/1 Erc HYDER Nakheel
Al Ramtha Pumping Station No. 7 & Resing Main Eagle Electromechanical Cansult Ltd RTA
R881/3b Comprehensive Improvement Of The Parallel Roads - Contract 3b Al Naboodah Contg Halcrow International Sharjah Municipality
Dubai Waterfront Project Internal Canal Bridges - Phase Iii Dbb De Leuw Cather RTA
R884 - Comprehensive Improvements To All Ittihad Road Besix Mouchel Nakheel
Dubai Waterfront Project Canal Bridges Cb 01, Cb 02, Cb 03, Samsung Cansult Maunsell / Aecon RTA
R881/1 Comprehensive Improvements Of The Parallel Roads China State MOUCHEL Nakheel
R881/1 Comprehensive Improvements Of The Parallel Roads China State Parsons, Deleuw Cather Du
Zone F - Ferrari Experience Belhasa Six Construct Llc Parsons, Deleuw Cather Etisalat
Burj Dubai Development Potable Water Distribution Network Suppy & Instal Transmission Distribution A.C
Pipeline Network EMIRATES ROAD CONTRACTING Whitbybird Aldar
CONSTRUCTION OF WATER STORAGE RESERVOIR 60 MG IN JABEL ALI Unec HYDER Emaar
R884-Comprehensive Improvements To Al Itihad Road-Phase 1 Belhasa Six Construct Llc Njs Dewa
Ras Al Khor Crossing - Contract R800/6 Salini Cansult Maunsell / Aecom RTA
TABREED DCS AD07 AL RAHA GARDENS PHASE -1 DISTRIBUTION PIPING FROM NEW PLANT Overseas Ast Co Llc. Parson Deleuw Cather RTA
R-471b King Abdul Aziz Road (Packag 2) National Contg. & Trens. Co Cansult Maunsell / Aecom RTA
The Plam Jebel Ali Desing & Construction Of Main & Crescent Bridges Samsung Halcrow International Government Of Sharjah
International City Phase 2 & 3 Al-Kharafi & Sons Wll Parsons Deleuw Cather Nakheel
R800/5 Ras Al Khor Crossing - Double Decking Of Doha Road Taisei Corporation Systra/Parsons RTA
Dubai - Fujairah Freeway, Contract No. 2 National Wheel J & P Llc Dorsch Ministry Of Public Works
Dubai Biotechnology & Research Park, UAE ERC De Leuw Cather RTA
Dubai Land Residences Complex - Road & Infrastructure ERC Paerons International Dubai Properties
Ds167 - Extension Of Al Aweer Sewage Treatment Plant Mass Leader Halcrow International Dubai Properties
R762 - Dubai Bypass Phase Iii Al Naboodah Contg Mwh DUBAI MUNICIPALITY
R800/3B RAS AL KHOR CROSSING, UAE National Wheel J&P Llc Wilber Smith Associates RTA
Jumeirah Park - Infrastructure Nurol Deleuw Cather-Parsons RTA
R659/11 Jumeirah Lake Towers Interchange (I/C 51/2) Dbb DAR AL HANDASAH Nakheel
Mina Saqr Port Berth 1-3 China Harbour Engg Deleuw Cather-Parsons RTA
Kgl/Kuwait United
Jumeirah Village South - Iii Dodsal Int'l Engineering Center Development
Culture Village - Phase 1 Road And Infrastructure Belhasa Six Construct Llc DAR AL HANDASAH DCA
La Village Contemporaine Business Bay 1 & 2, Infrastructure Works Package 2 Al Naboodah Engg Halcrow International Dubai Properties
Jumeirah Village South - Iii Triangle Infrastructure Works Ghantoot Trans. & Gen. Co Halcrow International Dubai Properties
The Peral - Qatar , Roads And Infrastructure UDC DAR AL HANDASAH Nakheel
ERC 0638/CIA - CONSTRUCTION OF QATAR PRIMARY ROUTES NORTH ROAD Darwish Engg. Gulf Engg. Ministry Of Justice
DISCOVERY GARDENS Al Naboodah Engg Ashghal Public Works Authority
R471a - King Abdul Aziz Road: Package 1 Sharjah Gen. Cont.Co. Turner Nakheel
Khor Fakkan Port Expansion Athena Sa Halcrow Government Of Sharjah
R757/1b Al Safouh Road Interchange Plam Island Jumeirah Access Road Bin Hafeez Gen. Co DELEUW CATHER Dubai Municipality
R757 - 1a Plam Island Interchange - Plam Island Jumeirah Access Road DUTCO CONSTURCTION DELEUW CATHER Dubai Municipality
The Plam Jumeirah Contract No. Jap006-C89 Crown Infrastructure Al Naboodah Eng. Ace Nakheel
JAP 006-16-1 THE PLAM JUMEIRAH CRESCENT INFRASTRUCTURE ARCHIRODON Ace International Nakheel
R640/2 - Several Car Parks In Dubai - Phase Ii PORT SAEED TRANSPORT AL TURATH ENGG Dubai Municipality
26-12-2022
DEWA-EW-MAT-3109-2022
24.02.2022
1-3-2022
11.04.2022
12.4.2022
12.04.22
11.4.22
D
CONTRAC MATERIAL APPROVAL REQUEST
Location / area of use / Discipline: Muwaileh Sewage Pumping Station (ESPS-1) and Rising Mains to Al Houma STP
Revise & Resubmit - Work May Not Proceed Rejected - Submit Another Alternative
Remarks:
Review and approval is only for general conformance with the design concept of the project and general compliance with the information provided in the contract documents.
Contractor, and his Subcontractor / Supplier, remains responsible for compliance with contract documents, confirmation and correlation of quantities and dimensions, selection
of fabrication process and techniques, coordination of trades, and performance of this work in a safe and satisfactory manner.
Jacobs 0.3 Sample collected from site delivery shall be tested for specification compliance as per clause 4.23.1 SK 14-Jun-21
Jacobs 0.4 Apllication shall be strictly in accordance with manufacture's method statement. SK 14-Jun-21
Jacobs 0.5 Aproval is subject to compliance of all relevant clauses (clause 4.22) of project specification. SK 14-Jun-21
Jacobs 0.6 Risk assesment shall be submitted for review and approval SK 14-Jun-21
DEE 2.10 Material Draft warranty letter & Material comparison sheet added refer to Appendix A & B KA 7-Mar-22
Legend
Location / area of use / Discipline: Muwaileh Sewage Pumping Station (ESPS-1) and Rising Mains to Al Houma STP
Revise & Resubmit - Work May Not Proceed Rejected - Submit Another Alternative
Remarks:
Review and approval is only for general conformance with the design concept of the project and general compliance with the information provided in the contract documents.
Contractor, and his Subcontractor / Supplier, remains responsible for compliance with contract documents, confirmation and correlation of quantities and dimensions, selection
of fabrication process and techniques, coordination of trades, and performance of this work in a safe and satisfactory manner.
Jacobs 0.3 Sample collected from site delivery shall be tested for specification compliance as per clause 4.23.1 SK 14-Jun-21
Jacobs 0.4 Apllication shall be strictly in accordance with manufacture's method statement. SK 14-Jun-21
Jacobs 0.5 Aproval is subject to compliance of all relevant clauses (clause 4.22) of project specification. SK 14-Jun-21
Jacobs 0.6 Risk assesment shall be submitted for review and approval SK 14-Jun-21
NOTE: Review and approval is only for general conformance with the design concept of the project and general compliance with the information
provided in the contract documents. Contractor / Supplier remains responsible for compliance with contract documents, confirmation and correlation
of quantities and dimensions, selection of fabrication process and techniques, coordination of trades, and performance of this work in a safe and
satisfactory manner.
Legend
and end
No. Comments Initials
overlaps
No objection for the source polybit and their bitustick XL1.6 mm based on the manufacturer’s profile
Jacobs 0.1 SM 10-Feb-22
and technical data sheets, previous authority approvals and test results.
Installation work for Bitustick XL 1.6 mm shall be done by a specialist certified by the manufacturer.
Jacobs 0.2 SM 10-Feb-22
Side overlaps shall be a minimum of 50 mm.
All materials shall strictly follow their manufacturers recommendation for application, storage and
Jacobs 0.3 SM 10-Feb-22
handling.
Delivered material should have legible identification and shall be notified and inspected prior to usage.
Jacobs 0.4 SM 10-Feb-22
DEE 0.4 Every packaging will be labelled with product name, batch number and manufacturing date AS 13-Feb-22
NOTE: The review of this document was broad and general; any omissions, errors or discrepancies in the comments by Jacobs / DPW shall not relieve
the Contractor of their whole responsibility of works / design responsibility with respect to the contract requirements/ specifications and applicable codes
& standards
Legend
DEE Response:
Reviewed By: Eng. Ahmed Juaidi Checked By: Eng. Awni Sawan
ADNOC GAS PROCESSING
Doc. Class: 2 Adyard Project No.310A20001 Adyard Doc. No.: ADY-310A20001-PMT-CIV-MT-MT-0037 Rev. No.: 1 Page No.:1 of 141
ADNOC GAS PROCESSING
Revision Revision
Revised Section (s) / Page (s) Revision Description
No. Date
HOLDS:
N/A
Doc. Class: 2 Adyard Project No.310A20001 Adyard Doc. No.: ADY-310A20001-PMT-CIV-MT-MT-0037 Rev. No.: 1 Page No.:2 of 141
PIPELINE SURVEILLANCE SYSTEM &
UPGRADATION OF TELECOM NETWORK (SDH) &
F & G SYSTEM
Project No. 5686 ADYARD Project No.
Agreement No. PX. 19.204 MATERIAL APPROVAL REQUEST (MAR) 310A20001
Attachments:
Material Sample Material Brochure of Manufacturer Test Certificates / Other Documents
Yes No Yes No (As applicable)
1. X 1. X 1 Specification reference
2. 2. 2 Technical Data Sheet / Test report
3. 3. 3 Commercial License, ISO certificates
4 Company Profile
5 Previous Approvals
Notes / Comments:
SUPPLIER/VENDOR/SUBCONTRACTOR:
Name of Supplier: Henkel Polybit Industries Ltd.
Date:
Submitted By: Mohammad Rehan
Signature: ___for 24/05/2021
Designation: Sales Engineer - Infra
COMPANY: AGP
Approved Approved with Comments Not Accepted
Comments:
Designa
Name: tion: Signature: Date:
Designa
Name: tion: Signature: Date:
Senthil Kumar
31/05/2021
2/26/2021 Aconex
Status N/A
(0 selected)
Document Revision
File Revision Title Status
No Date
B-
MAR- MAR FOR WATERPROOFING SYSTEMS-POLYPRIME SB
Approved
600001949- 1 18/02/2021 + BITUSTICK XL + BITUSTICK R 300 BY M/s HENKEL
with
C-0018 POLYBIT INDUSTRIES
Comments
MESSAGE
The attached documents have completed the "ADNOC - Construction - MAR (Civil) - Rev.1&above - Ver.1" workflow with the following
results :
Review
Doc No Step Participant Comments
Outcome
MAR-
ADNOC DC A-
600001949- R Juliano
QA Check Approved
C-0018
https://mea.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1782810720&USERID=1744931368 1/2
2/26/2021 Aconex
Discipline Chulliodantaka Approved the compliance statement sheet (Previous Comment#8) 2. In the
Eng. Review with attached specification Code references are missing for some of
Comments the property allowable limits shown, Consultant to include/clarify
3. Show number of water proofing layer (Bitustick XL), its
thickness and Compressive strength (30Mpa) value of cement
sand protection in the compliance statement sheet 4. Contractor
should Include-BOQ pages, Certificate of origin, latest valid ICV
certificates copy and draft Warranty certificate from Main
contractor as well in the MAR. Mention start date of warranty
(from PAC) 5. Contractor should ensure all the comments (eg.
Nos.10, 12, 13) for which they had replied as “Noted” in previous
CRS are fully complied.
B-
ADNOC CM Approved
S Aburumman
Endorsement with
Comments
B-
ADNOC PM Approved
V Jayaraman
Approval with
Comments
https://mea.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1782810720&USERID=1744931368 2/2
CONTRACT NO. : N-15907
P: PURPOSE CODES
0: For Distribution 1: Issued for Approval 2: Issued for Construction
3: Issued for Information 4: As Built
STATUS CODE:
Parsons International
Page 1 of 4
24/11/2020 24-11-2020 25.11.20 24-11-2020
Contract No. 301-929: Construction of Main Sewage Pump Station at Muwaileh Area
and Rising Main to Al Houma STP
Review Comments/Response Sheet
Document No. DJ587-MAR 011 Rev. 0 Date of Submission 8-Jun-21
DEE 0.2
Jacobs 0.3 Sample collected from site delivery shall be tested for specification compliance as per clause 4.23.1 SK 14-Jun-21
DEE 0.3
Jacobs 0.4 Apllication shall be strictly in accordance with manufacture's method statement. SK 14-Jun-21
DEE 0.4
Jacobs 0.5 Aproval is subject to compliance of all relevant clauses (clause 4.22) of project specification. SK 14-Jun-21
DEE 0.5
Jacobs 0.6 Risk assesment shall be submitted for review and approval SK 14-Jun-21
DEE 0.6
Contractor is advised to add a separate sheet covering 'Specification Reference' and Specification
Jacobs 0.7 AK/SK 14-Jun-21
Comparison Sheet' as required in MAR cover form''
DEE 0.7
Contractor to submit a comprehensive Method Statement for the Installation/Application of
Jacobs 0.8 AK/SK 14-Jun-21
Waterproofing material covering the Risk Assessment related to the application
DEE 0.8
Contractor to provide satisfactory response to above comments at the earliest to obtain "Approved "
Jacobs 0.9 status AK/SK 14-Jun-21
DEE 0.9
NOTE: Review and approval is only for general conformance with the design concept of the project and general compliance with the information
provided in the contract documents. Contractor / Supplier remains responsible for compliance with contract documents, confirmation and correlation of
quantities and dimensions, selection of fabrication process and techniques, coordination of trades, and performance of this work in a safe and
satisfactory manner.
Legend
DEE Response:
By Checked By
24/11/2020 24-11-2020 25.11.20 24-11-2020
HABSHAN-5
DE-BOTTLENECKING FOR ASSOCIATED GAS- EPC WORK
Membrane: Polyprime SB, Bitustick XL 1.6mm, Bituboard 3.5mm & Bitubond N, Bitumastic, Polyprime EP &
Polypoxy CR
Discipline: Civil
Trade Name: NA
Yes No
Project Specification Requirement: Refer to Attachment 3.1
Technical Details:
Is Material as per the ADNOC Gas Process Specification – Yes No Not Available
Reference Documents:
Note:
Signature:
License Details
License Number 107
Address Details
Lease Contract Number TC - 29962
Property Owner Ahmed Mohamed Salim
Almelaihi Al-Ali
Region Umm Thaob 7 7
Street undefined
Telephone 0508919999 Mobile 0508919999
P.O.Box 0000909 Email ahmed@linkrealestate.ae
License Members
0%
Manager Netherlands HARM PETRUS ANTONIUS PETERS
100%
Owner Germany HENKEL AG and CO. KGAA
"http://ded-e.uaq.ae"
Page 1/2 TEL +971 6 7064000 * UMM AL QUAIN, UAE * P.O.BOX 1333 .
Activities
Retail Sale Of Cosmetics -
Caulking Compounds and Similar Manufacturing
Fire Extinguishing Materials Manufacturing
Cements Prepared Additives Manufacturing
Damp proofing and water proofing works Insulation .
Contracting
Wholesale of Cleaners and Detergents Trading -
Beauty and Make-Up Preparations Manufacturing
Wholesale of Cosmetics and Trading -
Retai sale of Buildings Material -
Detergents & Disinfectants Manufacturing
Onshore and Offshore Oil and Gas Fields and Facilities
Services
"http://ded-e.uaq.ae"
Page 2/2 TEL +971 6 7064000 * UMM AL QUAIN, UAE * P.O.BOX 1333 .
HENKEL
COMPANY
PROFILE
Building on a strong legacy of more than 145 years, Henkel is leading the way to reimagine and improve
Adhesive Technologies is the world’s number one producer in the area of adhesives, sealants and functional
coatings. We enable the transformation of entire industries, giving our customers a competitive advantage
and offering consumers a unique experience. With trusted brands and high-impact solutions based on an
unmatched technology portfolio we are creating value for all our stakeholders.
With our pioneering spirit, our knowledge, our
products and technologies, we want to enrich
and improve the lives of billions of people every
day – and shape a viable future for the next
www.henkelpolybit.com