King Fahd Causeway Authority

SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.0 ELECTRICAL INSTALLATIONS

It is to be understood that the work(s) include


manpower, tools, accessories, equipments, services,
necessary to finish the entire work properly and the
equipment has to be complete in every respect,
notwithstanding the fact that every item may not be
specifically mentioned.

9.1 ELECTRIC SERVICE AND DISTRIBUTION


‫توريد وتركيب مفاتيح لوحة التوزيع‬

Supply and installation of the following Switchboards


including all equipment, instruments, devices, fittings
and accessories, fixings, etc.; as shown in drawings
(SA-EL-E3-301) and all as specified.

Main Distribution panel


9.1.1 SMP-G-01 nr 1.00
9.1.2 MCC-01 nr 1.00
‫توريد وتركيب مفاتيح لوحة التوزيع الفرعية‬
‫توريد وتركيب مفاتيح لوحات توزيع الكهرباء‬
9.2 Distribution Boards
9.2.2 DB-GF-L2 nr 1.00
9.2.7 DB-GF-PP-3 nr 1.00
9.2.8 DB-GF-PP-4 nr 1.00
9.2.14 DB-GF-AC2 nr 1.00
‫توريد وتركيب كيبل كهرباء‬

Supply and installation of all power cables including


all cable clamps, terminations, cable glands and
accessories, complete as shown in drawings
(SA-EL-E3-301 and all as specified.

Cables and conduits


9.2.17 MCC-01 nr 1.00

9.2.20 DB-GF-L2 nr 1.00

9.2.25 DB-GF-PP-3 nr 1.00


9.2.26 DB-GF-PP-4 nr 1.00

Volume 3 BOQ Page 1 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.2.32 DB-GF-AC2 nr 1.00

9.2.36 LCP-GF-02 nr 1.00

9.3 Cable Trays and Trunking


‫توريد وتركيب حامل كيبل الكهرباء‬
Modification of existing Cable Trays and Trunking; as
specified and shown in drawings (SA-EL-E10-101,
102, 103).
9.3.1 GF- electrical cable trays and trunking. item 0.25

9.3.2 GF- ELV cable trays and trunking. item 0.25


9.3.5 Roof- electrical cable trays and trunking. item 0.12
9.3.6 Roof- ELV cable trays and trunking. item 0.12

9.4 POWER INSTALLATIONS


‫توريد وتركيب مفاتيح عزل‬

Supply and installation of isolators; complete with


fittings and accessories; as shown in drawings (SA-
EL-E3-101) and all specified.

9.4.5 60A, TPN, Isolator, for ODU-07, FAHU-03, VIP lift nr 3.00

9.4.6 60A, TPN, Isolator, for ODU-07, FAHU-03, VIP lift nr 3.00
9.4.7 60A, TPN, Isolator, for ODU-07, FAHU-03, VIP lift nr 3.00
100A, TPN, Isolator, for (AHU-02-01 existing,) to
9.4.6 nr 1.00
new FAHU.
9.4.7 45A Sp WP isolator for exhaust fan nr 6.00
‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬

Supply and installation of all power cables including


all cable trays, cable clamps termination, cable glands
and accessories, complete as shown in drawings and
all as specified.

9.4.13 To 150A, TPN, Isolator, for ODU-02,03,05 nr 3.00

9.4.14 To 20A, TPN, Isolator, for ODU-08 nr 1.00


To 60A, TPN, Isolator, for ODU-07, FAHU-03, VIP
9.4.15 nr 3.00
lift
9.4.16 250A, TP, WP Isolator, for nr 3.00

9.4.17 150A, TP, WP Isolator, for nr 3.00

Volume 3 BOQ Page 2 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.4.18 100A, TP, WP Isolator, for nr 2.00

9.4.19 60A, TP, WP Isolator, for nr 3.00

9.4.20 45A, SP, WP Isolator, for nr 9.00


To100A, TPN, Isolator, for (AHU-02-01 existing,) to
9.4.21 nr 1.00
new FAHU.
‫توريد وتركيب مفاتيح كهرباء‬

Supply and installation of fittings and accessories, as


9.5 shown in drawings (SA-EL-E3-301)and all as
specified.

9.5.1 13A, single socket outlet nr 1.00


9.5.2 13A, double socket outlet nr 52.00

20A DP switch for Power for motorized curtain (@


9.5.3 nr 5.00
H/L)

9.5.4 32A 3 pin industrial socket outlet nr 3.00

9.5.5 DP switch WH 20A with neon indicator nr 3.00

9.5.6 DP switch HD 20A with neon indicator nr 3.00

9.5.7 IP rated floor box including 13A, double socket outlet. nr 32.00

9.5.8 WH 20A connection unit nr 2.00

9.5.9 HD connector with 20A nr 2.00

9.5.10 DP switch A/C 20A nr 15.00


‫توريد وتركيب كيبل كهرباء للمفاتيح الكهربائية‬

Supply and installation for Final sub-circuit and


auxiliary installation; complete with cables, conduits,
cable trays, trunking, including hangers, supports, etc.,
as shown in drawings and all as specified.

9.5.16 To 13A, single socket outlet nr 1.00

9.5.17 To 13A, double socket outlet nr 52.00


To 20A DP switch for Power for motorized curtain (@
9.5.18 nr 5.00
H/L).
9.5.19 To 32A 3 pin industrial socket outlet nr 3.00

9.5.20 To DP switch WH 20A with neon indicator nr 3.00

Volume 3 BOQ Page 3 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.5.21 To DP switch HD 20A with neon indicator nr 3.00


To IP rated floor box including 13A, double socket
9.5.22 nr 32.00
outlet.
9.5.23 To WH 20A connection unit nr 2.00

9.5.24 To DP switch A/C 20A nr 2.00

9.5.25 To HD connector with 20A nr 15.00


‫توريد وتركيب وحدات االضاءة‬

Supply and Installation of the following light fittings,


fixtures, including connections to permanent wiring
system; complete with all necessary fixings, fittings
9.6
and accessories, hangers, supports, drivers/transformer
as per light fixture schedule etc., as shown in drawings
(SA-EL-E2-101, 102).

Recessed 600 x 1200mm LED Lighting 6500LM


9.6.1 nr 6.00
lumens, 4000K.
Ceiling hung, 90mm width LED luminaire IE 4300
9.6.3 nr 20.00
lumens 4000K (1200mm).
9.6.4 5 Lamp flush mounted on false ceiling, IP -23 nr 26.00

9.6.6 Surface mounted LED ring type, 5000 lumens, 4000K. nr 4.00

Surface mounted LED luminaire, 5000 lumens, 4000K


9.6.7 nr 4.00
(600mm).
Ceiling recessed led light electronic control, 1600
9.6.10 nr 55.00
lumens.
Ceiling recessed led light electronic control (IP-45) for
9.6.11 nr 8.00
toilet.
9.6.12 Lights 15 watts, 600 lumens nr 130.00

9.6.15 4 x led track lights 12 watts, 4 x 600 lumens, 3000K nr 1.00

9.6.17 4.2w/m surface mounted linear led strip light, 3700K

9.6.18 Reflected ceiling item 1.00

9.6.19 Coffee station cabinet item 1.00

9.6.20 Kiosk desk item 1.00


9.6.21 Manager filing cabinet item 1.00

9.6.22 Meeting room item 1.00

Volume 3 BOQ Page 4 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.6.23 Conference room item 1.00

9.6.24 Mehrab area item 1.00

9.6.18 Ceiling ground & first floor m 82.00

9.6.21 7.2w/m surface mounted linear led strip light, 3700K m 20.00
‫توريد وتركيب كيبل لوحدات االضاءة‬

Final sub-circuit and auxiliary installation; complete


with cables, conduits, cable trays, trunking, including
9.7
hangers, supports, etc., as shown in drawings and all as
specified.

9.7.1 lighting points nr 163.00

9.7.2 lighting points (linear light) nr 16.00

9.7.3 lighting points; emergency nr 60.00

‫توريد وتركيب وحدات االنارة للطوارئ‬

Supply and Installation of the following light fittings,


fixtures, including connections to permanent wiring
system; complete with emergency battery backup min.
9.8 3hr rated and all necessary fixings, fittings and
accessories, hangers, supports, drivers/transformer as
per light fixture schedule etc., as shown in drawings
(SA-EL-E01-101) and all as specified.

Ceiling hung, 90mm width LED luminaire IE 300


9.8.3 nr 12.00
lumens 4000K (1200mm).
Ceiling hung, 90mm width LED luminaire IE (4000K
9.8.4 nr 1.00
(600mm).

9.8.5 5 Lamp flush mounted on false ceiling, IP -23 nr 6.00

Ceiling recessed led light electronic control, 600


9.8.8 nr 27.00
lumens.

Ceiling recessed led light electronic control (IP-45) for


9.8.9 nr 2.00
toilet.

9.8.11 Wall mounted/ceiling 'exit' sign with led lamp nr 3.00

9.8.12 Single sided ceiling mounted exit light 'exit' sign nr 2.00

9.8.13 Double sided ceiling mounted exit light 'exit' sign nr 2.00

Volume 3 BOQ Page 5 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

Light control system

Supply, install and maintain in accordance with the


drawings and specification to complete light control
System Installation.

‫توريد وتركيب نظام التحكم باالضاءة‬

Light control system panel including relays, dimmers,


9.8.14 modules, etc., as per drawing and specification for nr 2.00
complete light control strategy.
‫توريد وتركيب لوحة تحكم‬

9.8.15 Control plates minimum 4 scenes + dim up/down nr 45.00

‫توريد وتركيب حساس‬

9.8.16 Presence sensor nr 52.00

‫توريد وتركيب نظام تحكم رئيسي‬

9.8.17 Master control tablet/ touch screen nr 1.00

‫توريد وتركيب كيبل‬

Control wiring between control plates/master control


9.8.18 nr 95.00
and light control system panel.

9.9 Lighting Switches


‫توريد وتركيب مفتايح االنارة‬

Supply and installation of the following switches and


accessories; including fixings, boxes, etc.; as specified
and shown in drawings.

9.9.1 1way, 3gang switch nr 15.00


‫توريد وتركيب كيبل لمفتاح االنارة‬

Supply and installation of final sub-circuit and


auxiliary installation; complete with cables, conduits,
cable trays, trunking, including hangers, supports, etc.;
as shown in drawings and all as specified.

9.9.2 to 1way, 3gang switch nr 15.00


‫أعمال حفرة التأريض‬
9.10.1 Earth Pit, with 20 mm DIA bonded copper rod, LPE nr
9.10.1 Bonding connection item 1.00

‫أعمال تركيب نقاط الربط واالختبار‬

Volume 3 BOQ Page 6 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.10.5 test joint 200 mm (h) x 80 mm (w) x 100 mm (d) nr

9.10.4 Earth Pit, with 20 mm DIA copper rod nr 18.00

FIRE ALARM & VOICE EVACUATION


9.11
SYSTEM INSTALLATION
Supply, install and maintain in accordance with the
drawings and specification to complete Fire Alarm &
Voice Evacuation System.
‫توريد وتركيب وحدة تحكم‬

9.11.2 Fire alarm interface unit nr 9.00


‫توريد وتركيب كاشف دخان‬

9.11.3 Smoke Detector, ref. S nr 22.00

‫توريد وتركيب كاشف دخان مع تحكم‬

9.11.4 Smoke Detector, ref. S* with remote indicator nr 28.00


‫توريد وتركيب جرس انذار الحريق‬
9.11.6 fire alarm bell / sounder nr 1.00
‫توريد وتركيب وميض انذار الحريق‬
9.11.7 fire alarm flasher nr 1.00
‫توريد وتركيب وحدة كسر الزجاج‬
9.11.8 Break Glass unit nr 1.00

Supply and installation Cabling / fire rated cable


(minimum 30 minuts), complete with conduits as
shown on drawings and specifications
‫توريد وتركيب كيبل للوحة تحكم النذار الحريق‬
9.11.9 to Fire Alarm Control Panel, ref. FACP nr 1.00
‫توريد وتركيب كيبل للوحة تحكم تكرار انذار الحريق‬
9.11.10 to Fire Alarm repeater panel nr 1.00
‫توريد وتركيب كيبل لوحدة تحكم‬
9.11.11 to Fire alarm interface unit nr 9.00
‫توريد وتركيب كيبل لكاشف الدخان‬
9.11.12 to Smoke Detector, ref. S nr 28.00
‫توريد وتركيب كيبل لكاشف دخان مع تحكم‬

Volume 3 BOQ Page 7 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.11.13 to Smoke Detector, ref. S* with remote indicator nr 22.00


‫توريد وتركيب كيبل لجرس انذار الحريق‬
9.11.15 to fire alarm bell / sounder nr 1.00

‫توريد وتركيب كيبل لوميض انذار الحريق‬


9.11.16 to fire alarm flasher nr 1.00
‫توريد وتركيب كيبل لوحدة كسر الزجاج‬
9.11.17 to Break Glass unit nr 1.00
TELECOMMUNICATION SYSTEM
INSTALLATION
Supply, install and maintain in accordance with the
drawings and specification to complete
Telecommunication System. (contractor to verify the
exact routing of the F/O cable)

9.12 Data system


‫توريد وتركيب مفاتيح التجميع‬
9.12.4 AGGREGATION SWITCHES nr
‫توريد وتركيب لوحة بيانات‬
9.12.5 FIBRE PATCH PANEL nr
‫توريد وتركيب لوحة بيانات رئيسي‬

9.12.6 FIBRE BACKBONE PATCH PANEL nr


‫ منفذ‬48 ‫توريد وتركيب لوحة بيانات رئيسي‬

9.12.7 48 Port switch nr


‫ منفذ‬48 ‫توريد وتركيب لوحة بيانات افقية‬
HORIZONTAL COPPER PATCH PANEL
9.12.8 nr

‫توريد وتركيب مخارج بيانات‬

9.12.2 2XRJ-45 SOCKETS outlet for data nr 74.00


‫توريد وتركيب واي فاي‬

9.12.4 Wifi point 1XRJ-45 data & 1 X CAT-6A nr 4.00

‫ منفذ‬48 ‫توريد وتركيب لوحة بيانات افقية‬


48 PORTS HORIZONTAL COPPER PATCH
9.12.5 nr 2.00
PANEL

Volume 3 BOQ Page 8 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

Supply and installation Cabling / wires, conduits,;


complete as shown on drawings and specifications.

‫توريد وتركيب كيبل لمخارج البيانات‬


9.12.6 to 2XRJ-45 SOCKETS & 2 X CAT-6A for data outlet nr 74.00
‫توريد وتركيب كيبل واي فاي‬
9.12.8 to WIFI point 1XRJ-45 data & 1 X CAT-6A nr 4.00
‫ منفذ‬12 ‫توريد وتركيب كيبل لللوحة البيانات‬
9.12.10 to cat-6A flexible patch cords nr 80.00
9.13 Telephone system
‫توريد وتركيب مفتاح هاتف‬
9.13.1 Telephone point 1 x RJ-45 nr 36.00

Supply and install cabling / wires, conduits,; complete


as shown on drawings and specifications

‫توريد وتركيب كيبل لكابينة سيرفر‬


‫توريد وتركيب كيبل لمفتاح الهاتف‬

9.13.10 to telephone point 1 x RJ-45 as per length on drawing. nr 36.00

9.14 CCTV SYSTEM INSTALLATION

Supply, install and maintain in accordance with the


drawings and specification to complete CCTV System
Installation.

‫توريد وتركيب كاميرات خارجية‬


PTZ high resolution digital camera - indoor
9.13.4 nr
weatherproof type (ptz=pan-tilt-zoom).
‫توريد وتركيب كاميرات خارجية‬

Fixed high resolution digital camera, outdoor


weatherproof type.
9.13.5 nr
‫توريد وتركيب كاميرات داخلية باالسقف‬
Ceiling mounted dome type fixed high resolution
digital camera - surface / ceiling recessed to suit the
area.

Volume 3 BOQ Page 9 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

9.14.1 Indoor type nr 46.00


‫توريد وتركيب قاعدة‬

9.14.2 Supply and install face plate RJ-45 nr 46.00


‫تركيب سيرفر‬
Contractor to install CCTV system server and storage
9.14.3 nr 1.00
(provided be KFCA).
Supply and install Cabling / wires, conduits,; complete
as shown on drawings and specifications.

‫توريد وتركيب كيبل ألجهزة وشاشة المراقبة والتحكم‬

9.14.4 To 2x24 core fiber optic cable for CCTV Equipments nr 1.00

‫توريد وتركيب كيبل لكابينة أجهزة كاميرات المراقبة‬


To 2x24 core fiber optic cable for 15U CCTV data
9.14.5 nr 5.00
rack
‫توريد وتركيب كيبل لكابينة اجهزة كاميرات المراقبة‬
To 2x24 core fiber optic cable for 42U CCTV data
9.14.6 nr 1.00
rack
‫توريد وتركيب كيبل لكاميرات االسقف‬

To CAT-6A cable to ceiling mounted dome type fixed


9.14.7 high resolution digital camera - surface / ceiling nr 46.00
recessed to suit the area.

‫توصيل كيبل للسيرفر‬

Contractor to install CCTV system server and storage


9.14.9 nr 1.00
(provided be KFCA).

9.15 ACCESS CONTROL SYSTEM

Supply, install and maintain in accordance with the


drawings and specification to complete Access Control
System Installation.

‫توريد وتركيب وحدة تحكم لالبواب‬

9.15.1 Door control unit nr 30.00


‫توريد وتركيب قارئ كروت‬

9.15.2 Card reader nr 33.00

Volume 3 BOQ Page 10 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

‫توريد وتركيب زر‬

9.15.3 Push button, powered by thermal sensor without touch. nr 30.00

‫توريد وتركيب قفل للباب‬

9.15.4 Door lock nr 30.00


‫توريد وتركيب حساس للباب‬

9.15.5 Door position sensor nr 30.00

Supply and install Cabling / wires, conduits, trunking


and trays; complete as shown on drawings and
specifications.

‫توريد وتركيب كيبل لجهاز التحكم الرئيسي‬

9.15.6 To Power Supply with 3 Hrs. battery back up nr 1.00

‫توريد وتركيب كيبل تحكم الدخول‬

9.15.7 to Access control system cabling item 33.00

PA & VA system installation


‫توريد وتركيب مكبر صوت لالسقف‬
9.16.6 Ceiling mount speaker (SP) nr 75.00
‫توريد وتركيب وحدة تحكم بالصوت‬
9.16.7 Volume control (VC) nr 9.00
9.15.9 Battery and charger nr 1.00
Supply and install Cabling / wires, conduits, trunking
and trays; complete as shown on drawings and
specifications.
‫توريد وتركيب كيبل لمكبر صوت لالسقف‬
9.16.12 To ceiling mount speaker (SP) nr 50.00
‫توريد وتركيب كيبل لوحدة التحكم بالصوت‬
9.16.13 To volume control (VC) nr 5.00
‫توريد وتركيب كيبل لوحدة التحكم الرئيسي‬
9.16.14 To Power point for PA system control panel nr 1.00

9.17 TV system

Volume 3 BOQ Page 11 of 66


King Fahd Causeway Authority
SA-01 Building Interior Renovation (Option-1)- KSA

BILL OF QUANTITIES

Item Description Unit Quantity

Supply, install and maintain in accordance with


drawing and specification to complete TV system
installation.

‫توريد وتركيب مخارج لشاشة العرض‬


9.17.3 TV outlet nr 5.00
‫ توريد وتركيب‬face plate
TV outlet face plate match with other wiring
9.17.4 nr 5.00
accessories in the room.
Supply and install Cabling / wires, conduits, trunking
and trays; complete as shown on drawings and
specifications.
‫توريد وتركيب كيبل مخارج لشاشة العرض‬
9.17.10 To TV outlet nr 5.00
‫ توريد وتركيب كيبل‬face plate
To TV outlet face plate match with other wiring
9.17.11 nr 5.00
accessories in the room.
9.18 BMS (BUILDING MANAGEMENT SYSTEM)
‫تصميم وتركيب نظام المراقبة والتحكم‬

Contractor to prepare complete design system for the


building and proposal to be through specialist, bms
agency and submit for consultant's review / approval.

BMS Equipments, including Control module, Network


switch, BMS Server, BMS Workstation, complete
9.18.1 item 0.00
MEP items including cabling, wiring conduits for
DDC panel.

Volume 3 BOQ Page 12 of 66


Activity ID

CN-GFPDDM-1000

CN-GFPDDM-1010

CN-GFPDDM-1020

CN-GFPDCW-1000
CN-GFPDWP-1000

CN-GFPDWP-1010

CN-GFPDWW-1020
CN-GFPDWW-1000

CN-GFPDWW-1010

CN-GFPDMW-1010

CN-GFPDMW-1030

CN-GFPDMW-1050

CN-GFPDMW-1070

CN-GFPDMW-1080
CN-GFPDFW-1000
CN-GFPDFW-1050

CN-GFPDFW-1030

CN-GFPDFW-1060

CN-GFPDFW-1040

CN-GFPDFW-1010
CN-GFPDME-1030

CN-GFPDME-1040

CN-GFPDME-1100

CN-GFPDME-1190
CN-GFPDME-1050

CN-GFPDME-1160

CN-GFPDME-1060

CN-GFPDME-1070
CN-GFPDME-1080
CN-GFPDME-1090
CN-GFPDME-1110

CN-GFPDME-1120

CN-GFPDME-1130
CN-GFPDME-1140
CN-GFPDME-1150

CN-GFPDME-1170

CN-GFPDME-1180
CN-GFPDEE-1000

CN-GFPDEE-1010

CN-GFPDEE-1020
CN-GFPDEE-1030
CN-GFPDEE-1040
CN-GFPDEE-1050

CN-GFPDEE-1060

CN-GFPDEE-1070
CN-GFPDEE-1080

CN-GFPDEE-1090

CN-GFPDEQ-1000

CN-GFPDEQ-1010

CN-GFPDEQ-1020

CN-GFPDFU-1000
CN-GFPDTC-1000
Planned
Activity Name Planned Total Cost
Duration
Removal of existing Civil works & finishes 2 33260.51

Removal of all existing Electrical Systems 2 5490

Removal of all existing Mechanical Systems 2 6030

Misc Civil Works 2 22259.29


Blockworks 3 16314.95

Waterproofing wet areas 3 1456.46

Joinery Works 9 45213.13


Installation of Kitchen cabinets 6 10206

Installation of Wooden Doors 6 62763.75

Installation of gypsum wall partitions 2 70090.85

Installation of glazed door 2 19638

Installation of windows 2 28395

Installation of roller blinds 2 14419.92

Installation of concealment louvers for hvac equipment 2 5130


Plastering Works 2 7510.84
Ceiling works 2 159476.63

Vanity Counter 2 4422.86

Sinage & graphics 1 8103.38

Wall Finishes 2 114163.19

Floor Finishes 2 96126.03


condensate drain 2 720

Hot & cold water supply installations 2 6865.51

Ductwork and Accessories (for AC) 3 122098.5

Installation of Fire Fighting System 6 132443.33


AC - Refrigerant pipework and Fittings 2 40500

Ductwork and Accessories (for fresh air) 2 13320

Airconditioning Equipment installation 2 33102

AC Unit Installations 2 8370


Outdoor unit installations 3 77040
Thermostates 1 5265
Volume Control Damper 2 3941.1

Air Distribution Devices 2 66852

Fresh Air distribution 2 52830


Fresh air sand trap louver 1 684
Fire Damper (for fresh air) 1 7650

Extract Air Diffusers 1 2727

Non-return Damper 1 10.8


Installation of Cable Trays and Trunking 2 13072.5

Installation of DBs & MDBs 2 45411.75

Supply and installation of isolators; complete with fittings 2 16068.38


Supply and installation of fittings and accessories 2 47358.68
Supply and Installation of the light fittings, fixtures, including connections 2 122113.92
Final sub-circuit and auxiliary installation; complete 2 39195

Lighting Switches 2 1228.5

Installation of Lightning protection system 2 8541


Fire alarm & voice evacuation system installation 2 30024

Installation of Telecommunication System 2 144589.5

Supply and install LED TV 1 11970

Install Free standing double door refrigerator (300 LTS. Min.) 1 7560

Install Normal, hot and cold water dispenser 1 630

Supply & Installation of Necessary Furnitures 2 194280.19


Testing & Commissioning 4 0
‫‪BOQ Refrence‬‬ ‫‪Item Description‬‬ ‫‪Unit‬‬ ‫‪Quantity‬‬

‫‪1.1.1‬‬ ‫أعمال تكسير وهدم الحوائط القائمة بالموقع‬ ‫‪m‬‬ ‫‪123‬‬


‫‪1.1.3‬‬ ‫أعمال إزالة أرضيات المكاتب والممرات‬ ‫‪m2‬‬ ‫‪583‬‬
‫‪1.1.4‬‬ ‫اعمال ازالة االسقف في الغرف والممرات ودورات المياه‬ ‫‪m2‬‬ ‫‪583‬‬
‫‪1.1.5‬‬ ‫أعمال ازالة االبواب‬ ‫‪nr‬‬ ‫‪23‬‬
‫‪1.1.6‬‬ ‫اعمال ازالة الفرش الحالي للطابق االرضي‬ ‫‪item‬‬ ‫‪0.5‬‬
‫‪1.1.8‬‬ ‫أعمال ازالة كبائن المطبخ‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪1.1.11‬‬ ‫أعمال ازالة النوافذ والحوائط الزجاجية‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪1.1.15‬‬ ‫أعمال ازالة بالط الدرج والدرابزين‬ ‫‪m‬‬ ‫‪77‬‬
‫‪1.1.18‬‬ ‫أعمال ازالة تشطيب النافورة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪1.1.20‬‬ ‫أعمال ازالة التشطيب الداخلي للمصعد‪2‬‬ ‫‪m2‬‬ ‫‪15‬‬
‫‪1.1.21‬‬ ‫أعمال ازالة التشطيب الداخلي للمصعد‪3‬‬ ‫‪m2‬‬ ‫‪16‬‬
‫‪1.1.22‬‬ ‫أعمال ازالة التشطيب الداخلي للمصعد‪4‬‬ ‫‪m2‬‬ ‫‪15.5‬‬

‫‪1.1.24‬‬ ‫‪Access control‬‬ ‫‪nr‬‬ ‫‪4‬‬


‫‪1.3.1‬‬ ‫أعمال ازالة االعمال الكهربائية‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪1.3.2‬‬ ‫أعمال ازالة أعمال االتصاالت‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪1.3.3‬‬ ‫اعمال ازالة كابينة داتا‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪1.1.9‬‬ ‫أعمال ازالة المقاعد واالحواض بدورات المياه‬ ‫‪item‬‬ ‫‪0.12‬‬


‫‪1.2.1‬‬ ‫اعمال ازالة نظام التكييف القائم‬ ‫‪item‬‬ ‫‪0.12‬‬

‫‪3.1‬‬ ‫أعمال مباني البلوك‬ ‫‪m2‬‬ ‫‪50‬‬


‫‪3.2‬‬ ‫أعمال مباني البلوك‬ ‫‪m2‬‬ ‫‪300‬‬

‫‪4.1‬‬ ‫أعمال العزل المائي لدورات المياه والمطبخ‬ ‫‪m2‬‬ ‫‪45‬‬


‫‪4.4‬‬ ‫أعمال العزل المائي لدورات المياه والمطبخ‬ ‫‪m2‬‬ ‫‪60‬‬
‫‪4.5‬‬ ‫أعمال العزل المائي لدورات المياه والمطبخ‬ ‫‪m2‬‬ ‫‪20‬‬
‫‪4.6‬‬ ‫أعمال العزل المائي لدورات المياه والمطبخ‬ ‫‪m2‬‬ ‫‪30‬‬
‫‪4.7‬‬ ‫أعمال العزل المائي لدورات المياه والمطبخ‬ ‫‪m2‬‬ ‫‪22‬‬

‫‪5.3.1.5‬‬ ‫‪To stair case-4 4‬‬ ‫‪m2‬‬ ‫‪16‬‬


‫‪5.3.1.6‬‬ ‫‪To lift lobby- 4‬‬ ‫‪m2‬‬ ‫‪6‬‬
‫‪5.3.2.5‬‬ ‫توريد وتركيب مقعد جلوس‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪5.3.4.3‬‬ ‫توريد وتركيب منضدة مع فريم خشب‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪5.3.4.4‬‬ ‫توريد وتركيب منضدة مع فريم خشب‬ ‫‪nr‬‬ ‫‪3‬‬
5.3.5.4 ‫توريد وتركيب واجهة ديكورية للتلفزيون مع خزانة‬ nr 1
5.3.5.5 ‫توريد وتركيب واجهة ديكورية للتلفزيون مع خزانة‬ nr 1
5.3.6.1 ‫توريد وتركيب خزانة ملفات‬ nr 4
5.3.7.1 ‫توريد وتركيب مقعد مع رف احذية‬ nr 2
5.3.7.2 ‫توريد وتركيب مقعد مع رف احذية‬ nr 1
5.3.7.3 ‫توريد وتركيب خزانة مع ارفف‬ nr 2
5.3.7.4 ‫توريد وتركيب خزانة مع ارفف‬ nr 2
5.3.7.5 ‫توريد وتركيب تكسية للمحراب‬ nr 1
5.3.7.6 ‫توريد وتركيب تكسية للمحراب‬ nr 1
5.3.12.3 Toilet (M), 1,550 (W), Ground & First floor nr 1
5.3.13.4 Toilet (M) (4,500 x 2,400 mm), Ground floor nr 1

5.3.3.5 ‫توريد وتركيب كابينة لمنطقة المشروبات الساخنة‬ nr 1


5.3.1.1 To Coffee station-1, 2, 3, 5 (Ground floor) m2 4

5.2.1.3 D06(2,200 x 800/1000), opening size as per floor plans. nr 2


5.2.1.4 D07(2,200 x 800) nr 3
5.2.1.5 D08(2,200 x 1,000) nr 1
5.2.2.4 GL14 (2,150 X 1,500) nr 2

6.2.1 Gypsum wall partition m2 180

6.3.1 D01 (2,200 x 1,000) nr 7


6.3.2 D02 (2,200 x 800), sliding door nr 4

6.6.11 GL06 (1,080 X 1,550) nr 1


6.6.12 GL07(2,110 X 3,000) nr 2
6.6.13 GL08 (2,110 X 2,950) nr 1

6.8.1.8 (3,000x2,400mm) Manager Office-9 (Ground floor). nr 2


6.8.1.9 (3,295x2,400mm) Manager Office-9 (Ground floor). nr 1
6.8.1.10 (2,950x2,400mm) Manager Office-10 (Ground floor). nr 1
6.8.1.11 (3,000x2,400mm) Manager Office-11 (Ground floor). nr 1
6.8.2.6 (1,500x2,400mm) staff office-6 (Ground floor). nr 1
6.8.2.7 (3,000x2,400mm) staff office-6 (Ground floor). nr 3
6.8.2.8 (3,000x2,400mm) customer services (Ground floor). nr 4
6.8.2.9 (3,000x2,400mm) staff office-7 (Ground floor). nr 3

7.1.1 to receive internal wall paints m2 0


7.1.2 To external wall m2 281
‫‪7.7.6.6‬‬ ‫أعمال تشطيب السقف‬ ‫‪m2‬‬ ‫‪5‬‬
‫‪7.9.1‬‬ ‫توريد وتركيب سقف جيبسوم بورد‬ ‫‪m2‬‬ ‫‪325‬‬
‫‪7.9.4‬‬ ‫توريد وتركيب ديكورسقف خشبي‬ ‫‪m2‬‬ ‫‪50‬‬
‫‪7.9.5‬‬ ‫توريد وتركيب سقف ديكوري خشبي‬ ‫‪m2‬‬ ‫‪46‬‬
‫‪7.9.7‬‬ ‫توريد وتركيب ديكور خشبي‬ ‫‪m2‬‬ ‫‪104‬‬
‫‪7.9.8‬‬ ‫توريد وتركيب ديكور معدني طولي‬ ‫‪m2‬‬ ‫‪46‬‬
‫‪7.10.10‬‬ ‫توريد وتركيب ديكور معدني طولي‬ ‫‪nr‬‬ ‫‪40‬‬

‫‪7.5.4‬‬ ‫توريد وتركيب منضدة لدورات المياه‬ ‫‪nr‬‬ ‫‪2‬‬

‫‪7.10.1‬‬ ‫تزريد وتركيب زخرفة حائطية‬ ‫‪nr‬‬ ‫‪18‬‬


‫‪7.10.2‬‬ ‫تزريد وتركيب اللوحات االرشادية لالقسام‬ ‫‪nr‬‬ ‫‪2‬‬

‫‪7.7.1.1‬‬ ‫‪x500x8mm‬توريد وتركيب بالط بورسلين للحوائط ‪300‬‬ ‫‪m2‬‬ ‫‪52‬‬


‫‪7.7.2.1‬‬ ‫توريد تركيب تكسية للحائط‬ ‫‪m2‬‬ ‫‪10‬‬
‫‪7.7.2.2‬‬ ‫توريد تركيب تكسية للحائط‬ ‫‪m2‬‬ ‫‪6‬‬
‫‪7.7.2.3‬‬ ‫توريد تركيب تكسية لحائط المصعد‬ ‫‪m2‬‬ ‫‪10‬‬
‫‪7.7.5.1‬‬ ‫توريد وتركيب تكسية من الواح الخشب‬ ‫‪m2‬‬ ‫‪27‬‬
‫‪7.7.5.2‬‬ ‫توريد وتركيب تكسية من الواح الخشب‬ ‫‪m2‬‬ ‫‪15‬‬
‫‪7.7.5.3‬‬ ‫توريد وتركيب تكسية من الواح الخشب‬ ‫‪m2‬‬ ‫‪15‬‬
‫‪7.7.5.4‬‬ ‫توريد وتركيب تكسية من الواح الخشب‬ ‫‪m2‬‬ ‫‪27‬‬
‫‪7.7.5.5‬‬ ‫توريد وتركيب تكسية من الواح الخشب‬ ‫‪m2‬‬ ‫‪15‬‬
‫‪7.7.5.13‬‬ ‫توريد وتركيب تكسية لحوائط السلم‬ ‫‪m‬‬ ‫‪11‬‬
‫‪7.7.6.1‬‬ ‫أعمال تشطيب الواجهة االمامية للمصعد‬ ‫‪m2‬‬ ‫‪9‬‬
‫‪7.7.6.2‬‬ ‫أعمال تشطيب الحائط الجانبي‬ ‫‪m2‬‬ ‫‪18‬‬
‫‪7.7.6.3‬‬ ‫أعمال تشطيب الحائط الخلفي‬ ‫‪m2‬‬ ‫‪9‬‬
‫‪7.7.6.4‬‬ ‫أعمال تشطيب الباب‬ ‫‪m2‬‬ ‫‪5.5‬‬
‫‪7.8.1‬‬ ‫‪ code - PT.01‬أعمال دهان الحوائط‬ ‫‪m2‬‬ ‫‪280‬‬

‫‪7.2.1‬‬ ‫)‪To corridor (600 x 600 mm‬‬ ‫‪m2‬‬ ‫‪40‬‬


‫‪7.2.2 To customer services & electrical room (600 x 600 mm). m2‬‬ ‫‪84‬‬
‫‪7.2.3‬‬ ‫)‪To wet area, TL01(600 x 600 mm‬‬ ‫‪m2‬‬ ‫‪52‬‬
‫‪7.2.4‬‬ ‫)‪To wet area TL02(300 x 600 mm‬‬ ‫‪m2‬‬ ‫‪26‬‬
‫‪7.2.7‬‬ ‫)‪ (TL‬توريد وتركيب اطار ارضيات بورسلين‬ ‫‪m2‬‬ ‫‪10‬‬
‫‪7.2.15‬‬ ‫)‪ (AC‬توريد وتركيب ارضية فينيل‬ ‫‪m2‬‬ ‫‪81‬‬
‫‪7.2.16‬‬ ‫)‪ (CP‬توريد وتركيب موكيت‬ ‫‪m2‬‬ ‫‪300‬‬
‫‪7.2.17‬‬ ‫)‪ (WD‬توريد وتركيب ارضية خشب‬ ‫‪m2‬‬ ‫‪15‬‬
‫‪7.2.20‬‬ ‫توريد وتركيب حجر نهري‬ ‫‪m2‬‬ ‫‪4‬‬
‫‪7.2.23‬‬ ‫توريد وتركيب سجادة لالبواب الخارجية‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪7.3.1‬‬ ‫توريد وتركيب بالط‬ ‫‪m2‬‬ ‫‪6‬‬
‫‪7.3.2‬‬ ‫توريد وتركيب بالط للدرج القائم‬ ‫‪m‬‬ ‫‪33‬‬
‫‪7.3.3‬‬ ‫توريد وتركيب بالط للدرج النائم‬ ‫‪m‬‬ ‫‪33‬‬
‫‪7.4.1‬‬ ‫توريد وتركيب وزرة خشب‬ ‫‪m‬‬ ‫‪154‬‬
‫‪7.4.4‬‬ ‫توريد وتركيب وزرة خشب‬ ‫‪m‬‬ ‫‪15‬‬
‫‪7.4.5‬‬ ‫توريد وتركيب فاصل ستانليس ستيل‬ ‫‪m‬‬ ‫‪25‬‬
‫‪7.4.6‬‬ ‫توريد وتركيب عتبة جرانيت‬ ‫‪m‬‬ ‫‪14‬‬

‫‪7.6.2‬‬ ‫توريد وتركيب بالط سايلستون لكاونتر المطبخ‬ ‫‪nr‬‬ ‫‪2‬‬


‫‪7.7.6.5‬‬ ‫أعمال تشطيب االرضية‬ ‫‪m2‬‬ ‫‪5‬‬

‫‪8.4.1‬‬ ‫توريد وتركيب مواسير صرف وحدات التكييف‬ ‫‪item‬‬ ‫‪0.12‬‬

‫‪8.5.1‬‬ ‫توريد وتركيب مواسير الماء البارد‬ ‫‪m‬‬ ‫‪10‬‬


‫‪8.5.2‬‬ ‫توريد وتركيب مواسير الماء البارد‬ ‫‪m‬‬ ‫‪20‬‬
‫‪8.5.3‬‬ ‫توريد وتركيب مواسير الماء البارد‬ ‫‪m‬‬ ‫‪5‬‬
‫‪8.5.5‬‬ ‫توريد وتركيب مواسير الماء البارد‬ ‫‪m‬‬ ‫‪10‬‬
‫‪8.5.8‬‬ ‫توريد وتركيب صمام‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪8.5.9‬‬ ‫توريد وتركيب صمام‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.5.13‬‬ ‫توريد وتركيب محبس‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.5.14‬‬ ‫توريد وتركيب مانع زاوية‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.6.1‬‬ ‫توريد وتركيب مواصير الماء الساخن‬ ‫‪m‬‬ ‫‪20‬‬
‫‪8.6.2‬‬ ‫توريد وتركيب مواصير الماء الساخن‬ ‫‪m‬‬ ‫‪10‬‬
‫‪8.6.3‬‬ ‫توريد وتركيب محابس‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.6.4‬‬ ‫توريد وتركيب محابس‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪8.6.5‬‬ ‫توريد وتركيب محابس زاوية‬ ‫‪item‬‬ ‫‪0.12‬‬

‫‪8.7.6.1‬‬ ‫توريد وتركيب اجهزة تحكم بوحدات التكييف‬ ‫‪nr‬‬ ‫‪15‬‬


‫‪8.7.8.9‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.7.10.1‬‬ ‫توريد وتركيب وحدة الهواء الطبيعي‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.10.2‬‬ ‫توريد وتركيب وحدة الهواء الطبيعي‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.10.5‬‬ ‫توريد وتركيب وحدة الهواء الطبيعي‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.10.6‬‬ ‫توريد وتركيب وحدة الهواء الطبيعي‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.8.1‬‬ ‫‪testing and commissioning.‬‬ ‫‪item‬‬ ‫‪1‬‬
‫‪8.8.2‬‬ ‫‪protective paintings.‬‬ ‫‪item‬‬ ‫‪1‬‬
‫‪8.8.3‬‬ ‫‪Connection to existing services.‬‬ ‫‪item‬‬ ‫‪1‬‬
‫‪8.8.4‬‬ ‫‪protection of all works to this section.‬‬ ‫‪item‬‬ ‫‪1‬‬

‫‪8.9.1.1‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬


‫‪8.9.1.2‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.3‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.4‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.5‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.6‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.7‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.1.8‬‬ ‫توريد وتركيب مواصير مياه الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.2.1‬‬ ‫توريد وتركيب رأس رشاش الحريق‬ ‫‪nr‬‬ ‫‪40‬‬
‫‪8.9.2.3‬‬ ‫توريد وتركيب رأس رشاش الحريق‬ ‫‪nr‬‬ ‫‪40‬‬
‫‪8.9.5.1‬‬ ‫توريد وتركيب مواصير خرطوم الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.6.1‬‬ ‫توريد وتركيب صندوق خرطوم الحريق‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.9.7.1‬‬ ‫توريد وتركيب طفاية الحريق‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.9.7.2‬‬ ‫توريد وتركيب طفاية الحريق‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪8.9.7.3‬‬ ‫توريد وتركيب طفاية الحريق‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.9.8.1‬‬ ‫تصميم وتوريد وتركيب نظام اخماد الحريق‬ ‫‪item‬‬ ‫‪1‬‬
‫‪8.9.9.1‬‬ ‫توريد وتركيب مواصير صرف مياه االطفاء‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪8.9.9.2‬‬ ‫توريد وتركيب مواصير صرف مياه االطفاء‬ ‫‪m‬‬ ‫‪2‬‬
‫‪8.9.9.3‬‬ ‫توريد وتركيب مواصير صرف مياه االطفاء‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪8.7.1.1‬‬ ‫توريد وتركيب مواسير وحدات التكييف الداخلية‬ ‫‪item‬‬ ‫‪0.12‬‬


‫‪8.7.3.10‬‬ ‫توريد وتركيب وحدات التكييف المنفصلة‬ ‫‪nr‬‬ ‫‪0‬‬
‫‪8.7.3.15‬‬ ‫توريد وتركيب وحدات التكييف المنفصلة‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.3.16‬‬ ‫توريد وتركيب وحدات التكييف المنفصلة‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.4.1‬‬ ‫توريد وتركيب وحدات التكييف الجدارية‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.4.2‬‬ ‫توريد وتركيب وحدات التكييف الجدارية‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪8.7.14.1‬‬ ‫توريد وتركيب مجاري شفط الهواء للخارج‬ ‫‪item‬‬ ‫‪0.12‬‬


‫‪8.7.14.2‬‬ ‫توريد وتركيب مجاري شفط الهواء للخارج‬ ‫‪nr‬‬ ‫‪8‬‬
‫‪8.7.14.3‬‬ ‫توريد وتركيب مجاري شفط الهواء للخارج‬ ‫‪nr‬‬ ‫‪6‬‬
‫‪8.7.14.4‬‬ ‫توريد وتركيب مجاري شفط الهواء للخارج‬ ‫‪nr‬‬ ‫‪14‬‬

‫‪8.7.2.22‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪2‬‬


‫‪8.7.2.23‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.24‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.25‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.26‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.27‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.28‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪8.7.2.29‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪8.7.2.30‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.2.31‬‬ ‫توريد وتركيب وحدات التكييف‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪8.7.5.5‬‬ ‫توريد وتركيب وحدات التكييف الخارجية‬ ‫‪nr‬‬ ‫‪1‬‬


‫‪8.7.8.4‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪8.7.8.5‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪8.7.8.6‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪nr‬‬ ‫‪18‬‬
‫‪8.7.8.7‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪nr‬‬ ‫‪14‬‬
‫‪8.7.8.8‬‬ ‫توريد وتركيب وحدة تحكم بالهواء‬ ‫‪nr‬‬ ‫‪2‬‬

‫‪8.7.9.1‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪10‬‬


‫‪8.7.9.2‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪8.7.9.3‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪8.7.9.4‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪20‬‬
‫‪8.7.9.5‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪14‬‬
‫‪8.7.9.6‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪8.7.9.7‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.7.9.8‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪8.7.9.9‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪8.7.9.10‬‬ ‫توريد وتركيب موزع الهواء‬ ‫‪nr‬‬ ‫‪3‬‬

‫‪8.7.13.1‬‬ ‫توريد وتركيب مانع الحريق‬ ‫‪item‬‬ ‫‪0.12‬‬

‫‪8.7.11.4‬‬ ‫توريد وتركيب مراوح شفط‬ ‫‪nr‬‬ ‫‪2‬‬

‫‪9.3.1‬‬ ‫توريد وتركيب حامل كيبل الكهرباء‬ ‫‪item‬‬ ‫‪0.25‬‬


‫‪9.3.2‬‬ ‫توريد وتركيب حامل كيبل الكهرباء‬ ‫‪item‬‬ ‫‪0.25‬‬
‫‪9.3.5‬‬ ‫توريد وتركيب حامل كيبل الكهرباء‬ ‫‪item‬‬ ‫‪0.12‬‬
‫‪9.3.6‬‬ ‫توريد وتركيب حامل كيبل الكهرباء‬ ‫‪item‬‬ ‫‪0.12‬‬

‫‪9.1.1‬‬ ‫‪Main Distribution panel‬‬ ‫‪nr‬‬ ‫‪1‬‬


‫‪9.1.2‬‬ ‫‪Main Distribution panel‬‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.2.2‬‬ ‫‪Distribution Boards‬‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.2.7‬‬ ‫‪Distribution Boards‬‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.2.8‬‬ ‫‪Distribution Boards‬‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.2.14‬‬ ‫‪Distribution Boards‬‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪9.4.5‬‬ ‫توريد وتركيب مفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬


‫‪9.4.6‬‬ ‫توريد وتركيب مفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.7‬‬ ‫توريد وتركيب مفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.6‬‬ ‫توريد وتركيب مفاتيح عزل‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.4.7‬‬ ‫توريد وتركيب مفاتيح عزل‬ ‫‪nr‬‬ ‫‪6‬‬
‫‪9.4.13‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.14‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.4.15‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.16‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.17‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.18‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪9.4.19‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.4.20‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪9‬‬
‫‪9.4.21‬‬ ‫توريد وتركيب كيبل كهرباء لمفاتيح عزل‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪9.6.1‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪6‬‬


‫‪9.6.3‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪20‬‬
‫‪9.6.4‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪26‬‬
‫‪9.6.6‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪9.6.7‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪9.6.10‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪55‬‬
‫‪9.6.11‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪8‬‬
‫‪9.6.12‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪130‬‬
‫‪9.6.15‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.6.18‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.19‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.20‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.21‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.22‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.23‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.24‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪item‬‬ ‫‪1‬‬
‫‪9.6.18‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪m‬‬ ‫‪82‬‬
‫‪9.6.21‬‬ ‫توريد وتركيب وحدات االضاءة‬ ‫‪m‬‬ ‫‪20‬‬
‫‪9.7.1‬‬ ‫توريد وتركيب كيبل لوحدات االضاءة‬ ‫‪nr‬‬ ‫‪163‬‬
‫‪9.7.2‬‬ ‫توريد وتركيب كيبل لوحدات االضاءة‬ ‫‪nr‬‬ ‫‪16‬‬
‫‪9.7.3‬‬ ‫توريد وتركيب كيبل لوحدات االضاءة‬ ‫‪nr‬‬ ‫‪60‬‬
‫‪9.8.3‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪12‬‬
‫‪9.8.4‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.8.5‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪6‬‬
‫‪9.8.8‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪27‬‬
‫‪9.8.9‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪9.8.11‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪9.8.12‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪9.8.13‬‬ ‫توريد وتركيب وحدات االنارة للطوارئ‬ ‫‪nr‬‬ ‫‪2‬‬

‫‪9.9.2‬‬ ‫‪to 1way, 3gang switch‬‬ ‫‪nr‬‬ ‫‪15‬‬

‫‪9.9.1‬‬ ‫‪1way, 3gang switch‬‬ ‫‪nr‬‬ ‫‪15‬‬

‫‪9.11.2‬‬ ‫توريد وتركيب وحدة تحكم‬ ‫‪nr‬‬ ‫‪9‬‬


‫‪9.11.3‬‬ ‫توريد وتركيب كاشف دخان‬ ‫‪nr‬‬ ‫‪22‬‬
‫‪9.11.4‬‬ ‫توريد وتركيب كاشف دخان مع تحكم‬ ‫‪nr‬‬ ‫‪28‬‬
‫‪9.11.6‬‬ ‫توريد وتركيب جرس انذار الحريق‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.11.7‬‬ ‫توريد وتركيب وحدة كسر الزجاج‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪9.12.2‬‬ ‫توريد وتركيب مخارج بيانات‬ ‫‪nr‬‬ ‫‪74‬‬


‫‪9.12.4‬‬ ‫توريد وتركيب واي فاي‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪9.12.5‬‬ ‫توريد وتركيب لوحة بيانات افقية ‪ 48‬منفذ‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪9.12.6‬‬ ‫توريد وتركيب كيبل لمخارج البيانات‬ ‫‪nr‬‬ ‫‪74‬‬
‫‪9.12.8‬‬ ‫توريد وتركيب كيبل واي فاي‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪9.12.10‬‬ ‫توريد وتركيب كيبل لللوحة البيانات ‪ 12‬منفذ‬ ‫‪nr‬‬ ‫‪80‬‬
‫‪9.13.1‬‬ ‫توريد وتركيب مفتاح هاتف‬ ‫‪nr‬‬ ‫‪36‬‬
‫‪9.13.10‬‬ ‫توريد وتركيب كيبل لمفتاح الهاتف‬ ‫‪nr‬‬ ‫‪36‬‬
‫‪9.14.1‬‬ ‫توريد وتركيب كاميرات داخلية باالسقف‬ ‫‪nr‬‬ ‫‪46‬‬
‫‪9.14.2‬‬ ‫توريد وتركيب قاعدة‬ ‫‪nr‬‬ ‫‪46‬‬
‫‪9.14.3‬‬ ‫تركيب سيرفر‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.14.4‬‬ ‫توريد وتركيب كيبل ألجهزة وشاشة المراقبة والتحكم‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.14.5‬‬ ‫توريد وتركيب كيبل لكابينة أجهزة كاميرات المراقبة‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪9.14.6‬‬ ‫توريد وتركيب كيبل لكابينة اجهزة كاميرات المراقبة‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪9.14.7‬‬ ‫توريد وتركيب كيبل لكاميرات االسقف‬ ‫‪nr‬‬ ‫‪46‬‬
‫‪9.14.9‬‬ ‫توصيل كيبل للسيرفر‬ ‫‪nr‬‬ ‫‪1‬‬

‫‪9.17.3‬‬ ‫توريد وتركيب مخارج لشاشة العرض‬ ‫‪nr‬‬ ‫‪5‬‬


‫‪9.17.4‬‬ ‫‪ face plate‬توريد وتركيب‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪9.17.10‬‬ ‫توريد وتركيب كيبل مخارج لشاشة العرض‬ ‫‪nr‬‬ ‫‪5‬‬
‫‪9.17.11‬‬ ‫‪ face plate‬توريد وتركيب كيبل‬ ‫‪nr‬‬ ‫‪5‬‬

‫‪10.3‬‬ ‫توريد وتركيب اجهزة للمطبخ‬ ‫‪nr‬‬ ‫‪4‬‬

‫‪10.4‬‬ ‫‪Normal, hot and cold water dispenser‬‬ ‫‪nr‬‬ ‫‪4‬‬

‫‪11.1.1‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪20‬‬


‫‪11.1.2‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪20‬‬
‫‪11.1.3‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪11.1.4‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪6‬‬
‫‪11.1.5‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪11.2.1‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪12‬‬
‫‪11.2.3‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪11.2.4‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪11.2.7‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪8‬‬
‫‪11.2.8‬‬ ‫توريد وتركيب الفرش لمكاتب الموظفين‬ ‫‪nr‬‬ ‫‪3‬‬
‫‪11.3.1‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪11.3.2‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪8‬‬
‫‪11.3.3‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪11.3.7‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪11.3.10‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪11.3.13‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪2‬‬
‫‪11.3.15‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪1‬‬
‫‪11.3.16‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪10‬‬
‫‪11.3.17‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪11.3.18‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪4‬‬
‫‪11.3.20‬‬ ‫توريد وتركيب الفرش لمكاتب االمدراء‬ ‫‪nr‬‬ ‫‪4‬‬

You might also like