Soil Test Reports of Shiradi Ghat
Soil Test Reports of Shiradi Ghat
A
. EE/NH/QC/BNG/CBR/2013.
43 Office of the
Assistant Executive Engineer
Quality Control Sub
National High-ways, Division
Bangalore
Date 10- 19-13
10
ssistant Executive Engineer
ational Highway Sub Division
SAKALESHPURA.
Sir
Adverting to the above, the representative samples of the sub-grade soil from Km
37.000 to 263.000 Shiradi Ghat of NH-48 arranged and sent to this office are tested in
he laboratory. The evaluated Test Reports on Soil Characteristic including CBR values are
Yours faithfully,
Assistant|Execut+ve Engineer
Sub Division
Quality C8nttbl
National Highways, Bangalore
F r n Km/Ln 431.Uuu Lv eusvuuvumme
Modified Proctor
Date of test: 07-10-2013 to 07-12-2013
CBR
Gradation Test Atterberg Limits
Tpst Soil Classification as (4 days
SI. soaked
Plastic Plasticity Moisture Maximum
NH No. Km/Ch Location per IS:1498-1970
No
Silt& iquid
Gravel(%)|Sand(%) Dry Density| value)
Clay(%) Limit(%) |Limit (%) |Index(%) content 6.0
1.88 SC
1 NH-48|237.500 L/s 4.40% 54.20% 41.40% 30.99 16.4 14.56 13.0
9.3
R/s 5.80% 59.40% 34.80% 21.97 8.1 13.87 16.0 1.73
NH-48 238.200 16.0 1.70 SC 7.5
NH-48 239.200 R/s 1.60% 58.20%40.20% 28.13 12.14 15.99
3 12.8 85 SC 5.6
4 NH-48 240.300 L/s 4.20% 50.60% 45.20% 35.29 19.01 16.28 SC
18.2 1.59
5 NH-48 241.200 Us 10.30% 44.70% 45.00% 27.99 16.33 11.66
12.5 1.82 SC 5.3
6 NH-48 242.650 R/s 2.60% 51.80% 45.60% 34.91 19.05 15.86
12.6 1.91 SM 11.4
7 13.17 7.95
NH-48 243.100 L/s 4.50% 64.90% | 30.60% | 21.12 1.67 SC 7.2
/s 6.00% 55.30% 38.70% 26.88 11.92 14.9 16.9
NH-48 244.800
12.03 14.86 16.9 1.68 SC
5.40% 55.90% 38.70% 26.89
NH-48 245.100 Us
18.88 18.9 1.54 CL
10 NH-48 246.500 Us 0.90% 46.50% 52.60% 36.93 18.05
17.0 1.69 SC 7. 4
27.04 13.22 .82
11 NH-48 247.050 L/s 7.80% 54.70% | 37.50% SC 5.8
| 12 NH-48 248.500 R/s 1.70% 52.90% 45.40% 34.86 18.9 15.96 12.6 1.87
8.09 12.9 1.89 SM 10.8
13 NH-48 249.400 R/s 5.00% 63.30% 31.70% 1.03 12.94
13.6 SC 5.6
14 NH-48 250.600 Js 7.00% | 52.00% 41.00% 30.9 14.98 15.99 1.86
8.65 10.67 11.0 1.95 SM 17.6
Us 10.60% 63.10% 26.30% 19.32
15 NH-48 251.900 38.80% 54.40% 40.06 20.77 19.2 20.2 1.51 CL 4.9
16 NH-48 252.100 Us 6.80%
7.70% 61.00% | 31.30% 20.97 13.19 7.78 13.0 1.85 CL 10.7
17 NH-48 253.000 Us
66.20% 25.00% 13 8.18 9.95 9.9 1.95 SM 17.6
18 NH-48 254.300 Us 8.80%
19 NH-48 255.100 R/s 7.80% 59.80%% 32.40% 22.25 9.12 3.13 15.0 1.76 SC 9.7
21.00 13.05 .95 13.0 1.90 SM 15.8
20 NH-48 256.050 Us 9.10% 60.00% 30.90%
25.90% 19.06 9.12 9.94 11.0 1.97 SM 17.4
21 NH-48 257.100 L/s 5.40% 68.70%
31.07 16.02 15.05 13.4 SC 5.8
22 NH-48 258.100 L/s 3.30% 54.60% 42.10% 1.86
SC 9.7
| 23 NH-48 259.150 LIS 8.10% 59.30% 32.60% 22.05 9.00 13.05 15.1 1.77
16.86 7.91 8.95 9.9 2.01 SM 17.6
24 NH-48 260.200 L/s 8.30% 68.70% 23.00%
1.56 CI 5.1
25 NH-48 261.900 L/s 5.90% 43.80% 50.30% 45.26 22.95 22.31 21.1
SC 5.6
26 NH-48 262.900 R/s 7.40% 49.50% 43.10% 85 20.04 14.81 12.1 1.86
2C 6
Assistant Engineer Assistant(Exeçufivé Engineer
Quality Control Sub Division
National Hiahwavs. Banaalore