Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

PLATE A: WATER DISTRIBUTION LAYOUT

PLATE 34A

INSTRUCTIONS:

1. Based on ourthe
Join or watch Plate No. 2 andmeeting
synchronous 3, create a Water
on Nov. Distribution
18 and follow the Layout
steps in for a 2-Storey
creating a water
Residential House.
distribution layout.

2. Use
Prepare your base
A3 size plan with
of paper fromthe
yoursame
plate title
2. Draft thewith
block same base
our plan
plate on1.a Use
no. separate sheet
1 sheet (A3 for the base
of paper
size). You can use tracing or parchment paper so you can just trace it.
plan, and use another sheet of paper for Plate No. 4A (preferred is parchment or tracing paper.

3. Set aside your isometric base plan for now. You will be using that in the next plate.

4. Design and manually draft a OVERHEAD


PNEUMATIC/ UPFEED WATER
DOWNFEED DISTRIBUTION
WATER LAYOUT
DISTRIBUTION of your
LAYOUT of your
base plan (the separate sheet) in pen & ink. Use the same scale you used in your base plan.

5. Take note of the legend & symbols on the sample output. Use that in your distribution layout.
Copy the legend and write in on an empty portion of your paper.

6. Compute for the size and capacity of the suction tank/water tank using either method. (AWD or
WSFU) If using method 1 assume the population based on your floor plan and the AWD will be
based on the range stated in the water demand table. For the days of storage, use 1 day as the
value. Write the computation somewhere on your paper.

7. Scan your output or take a pic and submit it on Moodle. Please submit PDF or image format (jpg)
only. If you use MS Word in organizing your output, save it as PDF and not in .docx format.

A sample output is attached in the activity page on Moodle. DO NOT COPY THE SAMPLE WATER
DISTRIBUTION LAYOUT.

OVERHEAD: 25% - 50%


OF THE CISTERN TANK

CISTERN TANK
PLATE 3B: ISOMETRIC WATER DISTRIBUTION LAYOUT
PLATE 4B

INSTRUCTIONS:

1. Watch the video recording regarding this plate and follow the steps in creating an isometric water distribution layout.

1.
2. Prepare
1. Prepareyour
yourisometric
isometricbase
baseplan
planfrom
fromyour
yourplate
plate4a.
2. Draft
Draft the
the same
same iso
iso base
base plan
plan on
onaaseparate
separatesheet
sheet(A3
(A3size). You
size). can
You use
can tracing
use oror
tracing parchment paper
parchment soso
paper you
you can just
can justit.trace it.
trace

3.
2. Design
Designand
andmanually
manuallydraft
draft(pen
(penand
andink)
ink)ananisometric view
isometric of your
view overhead
of your / downfeed
pneumatic water distribution
upfeed water distribution layout
layout from
from your
your Plate
Plate 3.
4a.Use
Usethe
thesame
samescale
scaleyou used in your
you used inbase
isometric your plan.
isometric base plan.

3. Be
4. Beconsistent
consistentininyour
yourIsometric
Isometricwater
waterdistribution
distributionlayout.
layout.Whatever
Whateverpiping
pipingand
andplumbing
plumbingfixtures
fixturesare
arelaid
laidout
outininyour
yourPlate
Plate4a3 should be the same as your Plate 4b.
4.

5.
4. Take note of the heights in the isometric layout. In the sample output, dimensions are indicated for your guide and reference only. DO NOT PUT DIMENSIONS in your
isometric.

6.
5. Take note of the legend & symbols on the sample output. Use that in your isometric distribution layout. Copy the legend and write in on an empty portion of your paper.

7. Scan your output or take a pic and submit it on Moodle. Please submit PDF or image format (jpg) only. If you use MS Word in organizing your output, save it as PDF and
not in .docx format.

A sample output is attached on the activity page on Moodle but please DO NOT COPY THE SAMPLE ISOMETRIC WATER DISTRIBUTION LAYOUT.
LEGEND
COMPUTATION (CWT)
LAV LAVATORY WM WASHING MACHINE
WC WATER CLOSET GATE VALVE AWD = 150L/C/D

SH SHOWER HEAD CHECK VALVE C = 5 PEOPLE

HB HOSE BIBB M WATER METER D = 1 DAY

KS KITCHEN SINK METER STOP


CWT = AWD x C x D
WT WATER TANK FLOAT VALVE CWT = 150L x 5 x 1
BALL VALVE CWT = 750L ~ 775L BESTANK WT
BT BATHTUB
PT PRESSURE TANK WATER PUMP
13.300

2.000 2.125 3.250 3.925 2.000


2.000

BACKYARD/ GARDEN

2.000
3.425

MASTER
HB
BEDROOM
KS WM

SERVICE AREA /
DIRTY KITCHEN
KITCHEN

BT/SH WALK-IN
CLO.
2.650

MASTER
T&B

6.700
HB
WC LAV PT

LAV
SH
1.900

DINING

T&B
19.700

WC
775L
WT
5.225

BEDROOM 2
4.500
LIVING

HB

PORCH

CARPORT
4.500

4.500

M
FROM
WATER
8M WIDE RROW MAIN

SAMPLE ONLY. DO NOT COPY

A WATER DISTRIBUTION LAYOUT


SCALE 1:75 M
P 1

SHT. NO
AR. GUTIB 1
1
SHT. NO

1
1
LEGEND
SH
LAV LAVATORY

WC WATER CLOSET

1.800 - 2.100
SH SHOWER HEAD SV
SH

1.100-1.400
SV SHOWER VALVE
FAU

0.600
HB
HB HOSE BIBB
SV MASTER BEDROOM
KS KITCHEN SINK

0.600
BT BATHTUB FAU MASTER T&B
WC

AR. GUTIB
FAU FAUCET LAV

LAV

0.500
AIR CHAMBER

0.150
KS BACKYARD / GARDEN
WALK-IN CLOSET
ANGLE VALVE WC

0.50
HB
GATE VALVE
T&B
M WATER METER
WM
METER STOP KITCHEN

BEDROOM 1
DINING

SERVICE AREA /
DIRTY KITCHEN

LIVING
PT

PORCH
775L
0.30

HB
CARPORT
0.60

8M WIDE RROW

M A WATER DISTRIBUTION LAYOUT


SCALE 1:50 M
P 1
0.60

FROM WATER MAIN SAMPLE ONLY. DO NOT COPY

You might also like