Professional Documents
Culture Documents
Sand Production Management PTTEP
Sand Production Management PTTEP
Sand Production Management PTTEP
Tanawat Junmano1, Lee Boo Soon1, Anan Amornprabharwat1, Sutasinee Kittisupalauk1, and Rangsan Bhengbhun1
*Adapted from oral presentation given at the AAPG/EAGE/MGS Conference, Innovation in Geoscience: Unlocking the Complex Geology of Myanmar, Yangon,
Myanmar, November 19-20, 2015
**Datapages © 2015 Serial rights given by author. For all other rights contact author directly.
1
PTTEPI, Yangon, Myanmar (tanawatj@pttep.com)
Abstract
Sand production continues to be a major challenge in many producing oil and gas assets worldwide. It can choke off production, reduce
hydrocarbon recovery, eliminate the integrity of production facilities, and possibly cause disastrous facility failures and harm to personnel and
the environment. As such, sand management becomes a priority when selecting appropriate sand control methods and equipment, and
mitigation plans need to be addressed to reduce risks and harm resulting from sand production. Undertaken by PTTEPI, the Zawtika gas
development project, located offshore Myanmar in the Moattama Basin, covering Block M-9 and a portion of Block M-11, lies within the
Zawtika Development & Production Area. The area is situated approximately 300 km south of Yangon and 290 km west of Tavoy off the
Myanmar coast. Nine structures of discovered gas resource volumes have been dedicated to the Zawtika gas development project. They will be
developed over 3 phases, i.e. 1A, 1B and 1C, at a Daily Contract Quantity of 300 MMscfd sales gas. The GSA was concluded and signed
between all parties on July 30, 2010. Gas production from Phase 1A development, comprising the first three 3 structures, has been being
delivered to buyers since March 10th, 2014.
Sand Production Management:
• Q&A
2
Why sand production MNG is important?
Leakage at downstream of choke valve Choke valve totally damaged Sand probe totally damaged
3
Where is Zawtika field?
Yadana Platform
Ban I-Tong
Daminseik
~70 km.
Zawtika
230 km., 28”
Dawei
4
Zawtika Facilities
ZWP5
ZWP2
ZWP9
ZPQ ZWP1
ZWP3
ZWP6
ZWP7
ZWP4
5
Zawtika reservoir characteristics
6
Zawtika reservoir characteristics (cont’d)
• Normal reservoir pressure & temperature,
Hydrostatic gradient 0.433 – 0.44 psi/ft
Temperature 40-120degC
• Dry gas with low CO2 (0.1-0.4%) and no H2S and Hg
with max N2 25% in KKN area.
• Heating value in the range 850-1,000 BTU/SCF
• Poor to fair reservoir with permeability 30-900mMD
*poor due to clay contents & very fine grain size
44microns
7
Challenges in Zawtika gas production
8
Sand Production Management –
Part of the multidisciplinary team!
Subsurface
/ Reservoir Drilling
Engineering
Sand
Sand prod.
prod. MNG
MNG
Production
Completions and Facility
Engineering
9
Sand production observed from well testing
SPH-1 Zawtika-1A Zawtika-2 Zawtika-3 Zawtika-4 Zawtika-5 Zawtika-8 Zawtika-9 Kakonna-1 Kakonna-2 Kakonna-3 Kakonna-4 Gawthaka-1
Reservoir Formation
Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate Gas Rate
Name Unit
(MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd) (MMscfd)
Res.07-00
5F
Res.08-00 SandProd. SandProd.
Res.09-00
S Res.09-45 5E SandProd.
Res.13-30 Sand free Sand free Sand free Sand free Sand free SandProd.
Res.14-00 SandProd.
I Res.14-75
5C
Sand free SandProd.
D Res.20-50 5A
Legend:
Sand production Shallow Æ observed sand most of TSTs
Sand free
R07-00 R08-00
11
Causes of sand production
Static Æ Formation or reservoir factors Dynamic Æ Fluid flow effect
• Poorly consolidated formation, generally • Other factors influencing tendency of a
a “young sandstone problem” well to produce sand is “fluid flow effects”
12
Zawtika Well Completion Strategy
13
Zawtika Well Completion Strategy (cont’d)
Frac-pack (STIMPAC)
14
Zawtika Well Completion Strategy (cont’d)
Well location Perforation stand-off & perforation length
• Development wells have been placed at crestal locations • Optimize perforation interval length and maximize perforation
to delay water encroachment to the well stand-off above GWC to delay water production
R14-75
0o phasing
R14-75
15
Zawtika Well Operating Procedure
Production
Start Up Well Life
Optimization
Well start-up
- Data from E&A Well Bean up/bean down policy Maximum
Testing Well prioritization Confirm Metal Allowable Sand
- Sand prediction model Choke opening procedure Loss/Sand rate Rate (MASR)
Regular well clean-out Production Test
(Monthly) Maximum sand
Well Free Rate (MSFR)
Sample Analysis
Operating
Maximum sand Procedure
Free Rate (MSFR) Real Time Sand Monitoring
(Sand probe) + Acoustic
Maximum
Allowable Sand
Sand Monitoring (ClampOn)
Rate (MASR)
Real Time Water Monitoring
Critical drawdown
limit through Well Surveillance
Workflow
Real-time wellhead
Monitoring Water Coning
Production Test
(Monthly) Water
Breakthrough
Sample Analysis
16
Zawtika Historical Production and Challenges
Condensate from
R23-50, ZWP-02
MNB SC
• Production contribution from • More wells become online after
MNB decreases due to sand and sand control completion is completed.
water production • Potential gain from well bean-up activities
as per targeted at MSFR and MASR
17
Mitigation plan and Way forward
18
Mitigation plan and Way forward (cont’d)
Online sand probe + Acoustic sand monitoring and Production envelope
Production Envelope
19
Mitigation plan and Way forward (cont’d)
• Deployment by CTU
Horizontal well with gravel pack completion
• Squeeze Gravel Pack System
(Screen Stacks with Frac Valve System)
• Screen size
ID = 1.61”
OD = 2.25”
Clearance diameter = 0.742”
20