Execution Plan For Retaining Wall

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Separate Resources Required for

Retaining wall (South Nala side ) It


Mobilization for labour and Preparation of Approach Road at
START 14.03 TO 16.03 Pre Level Survey Equipments Nallah Side for Disposal work Carpenter & Helper - 15 Nos

Preparation of Approach Road Excavation work for Ist& 2nd Excavation work for 3rd& 4th
18.03 TO 20.03 at Nallah Side for Disposal work Span upto 50% Span upto 50% Fitter & Helper - 15 Nos
1st Week
Excavation work for 5th& 6th
21.03 TO 23.03 Span upto 50% Shoring Work Shoring Work Unskilled Labour - 12 Nos

Ist Span & 2nd Span 50 % Ht Ist Span & 2nd Span 50 % Ht Ist Span & 2nd Span 50 % Ht
25.03 TO 27.03 Breaking Breaking Breaking Long Boom Excavator - 1 No

2nd Week Poclain with Breaker Hammer of


Ist Span & 2nd Span 50 % Ht Ist Span & 2nd Span 50 % Ht Adequate capacity for Rock
28.03 TO 30.03 Breaking Breaking Disposal of Debris cutting and Dismantling of
Existing wall

Diversion of the Coarse of


01.04 to 3.04 Diversion of the Coarse of Nullah by Filling and Shoring Exavation of the required portion
Nullah by Filling and Shoring on on the Nullah side for 1st on the Nullah side upto Rock
the Nullah side for 1st span span Level for the 1st span Dewatering Pump 5 Hp - 2 Nos
Exavation of the required 1st Span upto Bottom level 1st Span upto Bottom level Standard Belex Shuttering
3rd Week portion on the STP side upto Breaking Breaking material for Two spans single lift
Rock Level for the 1st span
4.04 to 6.04
Exavation of the required Shoring work on the Nullah side
Shoring work on the STP Side portion on the Nullah side for the 2nd Span Adjustable Props
upto Rock Level for the 2nd
span
Initiation of breaking work Breaking work for Shear Key in
Disposal of Debris for Shear Key in 1st span 1st Span Heavy Tube Waller
8.04 to 10.04
Exavation of the required 2nd Span upto Bottom level 2nd Span upto Bottom level
portion on the STP side upto Breaking Breaking Scaffolding Materials
4th Week Rock Level for the 2nd span
3rd Span & 4th Span 50 % Ht 3rd Span & 4th Span 50 % Ht
Breaking Breaking Disposal of Debris Platform Jali
11.04 to 13.04
Breaking work for Shear Key in Preparation of Formation PCC Work completion of 1st Shoring Materials for the nala
1st Span level of PCC for 1st Span Span side. In STP side if required.

Exavation of the required Shoring work on the Nullah Exavation of the required portion
portion on the Nullah side upto side for the 3rd Span on the STP side upto Rock Level
Rock Level for the 3rd span for the 3rd span
15.04 to 17.04 Initiation of breaking work for Breaking work for Shear Key Breaking work for Shear Key in
Shear Key in 2nd span in 2nd Span 2nd Span
Initiation of cutting and bending cutting and bending of steel Initiation of cutting and Bending
5th Week of steel for Shear Key for Shear Key reinforcement of Raft Reinforcement
reinforcement
3rd Span upto Bottom Level 3rd Span upto Bottom Level
Breaking Breaking Disposal of Debris

Preparation of Formation level PCC Work completion of 2nd


18.04 to 20.04 of PCC for 2nd Span Span Initiation of Raft foundation work

cutting and Bending of Raft cutting and Bending of cutting and Bending of Vertical
Reinforcement Vertical Reinforcement Reinforcement
Shoring work on the Nullah Exavation of the required portion
side for the 4th Span on the STP side upto Rock Level
Exavation of the required for the 4th span
portion on the Nullah side upto
Rock Level for the 4th span
22.04 to 24.04 Initiation of breaking work for Breaking work for Shear Key Breaking work for Shear Key in
Shear Key in 3rd span in 3rd Span 3rd Span

Shuttering and Reinforcement Shuttering and


Reinforcement for 1st Span Shuttering and Reinforcement
6th Week for 1st Span Raft Raft for 1st Span Raft

4TH Span upto Bottom Level 4th Span upto Bottom Level
Breaking Breaking Disposal of Debris

Preparation of Formation level PCC Work completion of 3rd Concreting of Raft of the 1st
25.04 to 27.04 of PCC for 3rd Span Span Span
Initiation of cutting and bending cutting and bending of steel Initiation of cutting and Bending
of steel for Shear Key for Shear Key reinforcement of Raft Reinforcement for 2nd
reinforcement for 2nd span Span
5th Span & 6th Span 50 % Ht 5th Span & 6th Span 50 % Ht
Breaking Breaking Disposal of Debris

Initiation of breaking work for Breaking work for Shear Key Breaking work for Shear Key in
Shear Key in 4th span in 4th Span 4th Span
Shoring work on the Nullah Exavation of the required portion
side for the 4th Span on the STP side upto Rock Level
Exavation of the required for the 4th span
29.04 to 01.05 portion on the Nullah side upto
Rock Level for the 4th span
Initiation of 1ST span wall 1st Initiation of 1ST span wall 1st Initiation of 1ST span wall 1st Lift
Lift upto 2 m Height Lift upto 2 m Height upto 2 m Height

cutting and Bending of Raft cutting and Bending of cutting and Bending of Vertical
Reinforcement of 2nd Span Vertical Reinforcement of Reinforcement span
7th Week 2nd span
7th Week
Shoring work on the Nullah Exavation of the required portion
side for the 5th Span on the STP side upto Rock Level
Exavation of the required for the 5th span
portion on the Nullah side upto
Rock Level for the 5th span
Preparation of Formation level PCC Work completion of 4th
2.05 to 4.05 of PCC for 4th Span Span
Concreting work of the 1st Lift Initiation of 2nd Lift wall of 2nd Lift wall of 1st Span
wall of 1st span 1st Span

Shuttering and Reinforcement Shuttering and


Reinforcement for 2ndt Span Shuttering and Reinforcement
for 2nd Span Raft Raft for 2nd Span Raft

5TH Span upto Bottom Level 5th Span upto Bottom Level
Breaking Breaking Disposal of Debris
2nd Lift wall of 1st Span Concreting of 2nd Lift wall of Initiation of 3rd Lift wall of 1st
1st span span
6.05 to 8.05 Concreting work of the Raft of Initiation of the 1st Lift wall
2nd span of 2nd Span 1st Lift wall of 2nd Span

Initiation of cutting and bending cutting and bending of steel Initiation of cutting and Bending
of steel for Shear Key reinf for for Shear Key reinf for 3rd of Raft Reinforcement for3rd
3rd Span Span Span
Initiation of breaking work for Breaking work for Shear Key Breaking work for Shear Key in
Shear Key in 5th span in 5th Span 5th Span
8th Week
Shoring work on the Nullah Exavation of the required portion
side for the 6th Span on the STP side upto Rock Level
Exavation of the required for the 6th span
portion on the Nullah side upto
Rock Level for the 6th span
9.05 to 11.05 Concreting of 3rd Lift wall of 1st
3rd Lift wall of 1st span 3rd Lift wall of 1st span Span
Concreting of 1st Lift wall of Initiation of 2nd Lift wall of 2nd
1st Lift wall of 2nd Span 2nd Span span

cutting and Bending of Raft cutting and Bending of cutting and Bending of Vertical
Reinforcement of 3rd Span Vertical Reinforcement of Reinforcement 3rd span
3rd span
6TH Span upto Bottom Level 6TH Span upto Bottom Level
Breaking Breaking Debris Removal
Preparation of Formation level PCC Work completion of 5th
of PCC for 5th Span Span
Initiation of Final Level Wall for
1st Span Final Level Wall for 1st Span Final Level Wall for 1st Span

Concreting of 2nd Lift wall of 2nd


12.05 to 14.05 2nd Lift wall of 2nd span 2nd Lift wall of 2nd span Span

Shuttering and Reinforcement Shuttering and


Reinforcement for 3rd Span Shuttering and Reinforcement
for 3rd Span Raft Raft for 3rd Span Raft

Initiation of cutting and bending cutting and bending of steel Initiation of cutting and Bending
9th Week of steel for Shear Key reinf for for Shear Key reinf for 4th of Raft Reinforcement for4th
4th Span Span Span
Initiation of breaking work for Breaking work for Shear Key Breaking work for Shear Key in
Shear Key in 6th span in 6th Span 6th Span
Concreting of Final Level of 1st Initiation of 3rd lift wall of
Span 2nd Span 3rd lift wall of 2nd Span

Concreting of raft for 3rd Initiation of 1st Lift wall of 3rd


15.05 to 17.05 span span
Preparation of Filter media in
the 1st Span Filter media in the 1st Span Filter media in the 1st Span

cutting and Bending of Raft cutting and Bending of cutting and Bending of Vertical
Reinforcement of 4th Span Vertical Reinforcement of Reinforcement 4th span
4th span
Preparation of Formation level PCC Work completion of 6th
of PCC for 6th Span Span
Concreting of 3rd lift wall of Initiation of 4th Lift wall of 2nd
3rd lift wall of 2nd Span 2nd Span span
Concreting of 1st Lift wall of 3rd
1st Lift wall of 3rd span 1st Lift wall of 3rd span Span
19.05 to 21.05
Shuttering and Reinforcement Shuttering and
Reinforcement for 4th Span Shuttering and Reinforcement
for 4th Span Raft Raft for 4th Span Raft

10th Week Initiation of cutting and bending cutting and bending of steel Initiation of cutting and Bending
of steel for Shear Key reinf for for Shear Key reinf for 5th & of Raft Reinforcement for 5th &
5th & 6th Span 6th Span 6th Span
Initiation of 1st Lift wall of
Concreting of 4th span Raft 4th span 1st Lift wall of 4th span
4th(Final ) Lift wall of 2nd Concreting of Final Lift of 2nd
4th(Final ) Lift wall of 2nd span span Span
22.05 to 24.05
Initiation of 2nd Lift wall of 3rd
Span 2nd Lift wall of 3rd Span 2nd Lift wall of 3rd Span
Backfilling with compaction of Backfilling with compaction Backfilling with compaction of
1st Span of 1st Span 1st Span
cutting and Bending of Raft cutting and Bending of cutting and Bending of Vertical
Reinforcement of 5th Span & Vertical Reinforcement of Reinforcement 5th Span & 6th
6th span 5th Span & 6th span span
Filter media placement in the Filter media placement in Filter media placement in the
26.05 to 28.05 2nd span the 2nd span 2nd span

11th Week
26.05 to 28.05
Concreting of 1st lift wall of Initiation of 2nd Lift wall of 4th
1st Lift wall of 4th span 4th Span span
Concreting of 2nd Lift of 3rdInitiation of 3rd Lift wall of
Span 3rd Span 3rd Lift wall of 3rd Span
11th Week
Shuttering and Reinforcement Shuttering and
Reinforcement for 5th Span Shuttering and Reinforcement
for 5th Span Raft Raft for 5th Span Raft

Concreting of 2nd Lift wall of 4th


29.05 to 31.05 2nd Lift wall of 4th span 2nd Lift wall of 4th span Span
Backfilling with compaction of Backfilling with compaction Backfilling with compaction of
2nd span of 2nd span 2nd span
Concreting of 3rd lift wall of Initiation of Final Lift wall of 3rd
3rd Lift wall of 3rd Span 3rd Span Span
Initiation of Ist lift wall of 5th
Concreting of Raft for 5th Span Span 1st lift wall of 5th Span
Shuttering and Reinforcement Shuttering and
Reinforcement for 6th Span Shuttering and Reinforcement
for 6th Span Raft Raft for 6th Span Raft

2.06 to 4.06 Backfilling with compaction of Backfilling with compaction Backfilling with compaction of
1st & 2nd span of 1st & 2nd span 1st & 2nd span
Initiation of 3rd Lift wall of 4 th
span 3rd Lift wall of 4 th span 3rd Lift wall of 4 th span
Concreting of the Final Lift wall
Final Lift wall of 3rd Span Final Lift wall of 3rd Span of 3rd Span
12th Week
Initiation of 1st Lift wall of
Concreting of 6th span Raft 6th Span 1st Lift wall of 6th Span

Backfilling with compaction of Backfilling with compaction Backfilling with compaction of


1st & 2nd span of 1st & 2nd span 1st & 2nd span
5.06 to 7.06 Filter media placement in Filter media placement in Filter media placement in the
the3rd span the 3rd span 3rd span
Concreting of 1st Lift wall of 5th
1st lift wall of 5th Span 1st lift wall of 5th Span Span
Concreting of 3rd Lift wall of Initiation of Final Lift wall of 4th
3rd Lift wall of 4 th span 4 th span span
1st Lift wall of 6th Span Concreting of 1st lift wall of Initiation of 2nd Lift wall of 6th
6th span span
Initiation of 2nd Lift wall of 5th
9.06 to 11.06 span 2nd Lift wall of 5th span 2nd Lift wall of 5th span
Concreting of Final Lift of 4th
Final Lift wall of 4th span Final Lift wall of 4th span Span
13th Week Backfilling Backfilling Backfilling
Concreting of 2nd Lift wall of 6th
2nd Lift wall of 6th span 2nd Lift wall of 6th span span
12.06 to 14.06 Concreting of 2nd Lift wall of Initiation of 3rd Lift wall of
5th Span 5th span 3rd Lift wall of 5th span
Filter media Filter Media Filter Media
Backfilling Backfilling Backfilling
Initiation of 3rd Lift wall of 6th
16.06 to 18.06 span 3rd Lift wall of 6th span 3rd Lift wall of 6th span
Concreting of 3rd lift of 5th Initiation of final Lift wall of 5th
3rd Lift wall of 5th span span span
Backfilling Backfilling Backfilling
14 th Week
Concreting of 3rd lift of 6th Initiation of final Lift wall of
19.06 to 21.06 span 6th span final Lift wall of 6th span
Concreting of Final Lift of 5th
final Lift wall of 5th span final Lift wall of 5th span Span
Backfilling Backfilling Backfilling
ConcretING OF Final Lift of
End of the 23.06 to 25.06 final Lift wall of 6th span 6th Span Filter media
work Backfilling Backfilling Backfilling
RSPS CCT PTU ADMIN
AIR BLOWER WORKSHOP & TOILET BLOCK SBR COTDM
DG SHED OTHER ELECTRICAL UNITS