An Analysis of The CO2 Emission Abatement in Plastic Recycling System Using Life Cycle Assessment (LCA) Methodology: A Case Study of Bandung City, Indonesia
DOCUMENT CHECK LIST FOR ISO CERTIFIED UNITS NAME OF FACTORY; Date Jhagadia Factory Will each of the following documents be available for Yes No NA Remarks Responsibility Target Date review? Facility Information - K- Must Requirements 1 Accident Register Form -23 as per factory act 2 Accident register Form-11 for ESI 3 Weighing scale calibration Environment 1 PCB Consent for air & water – CFE &CFO 2 Authorization for hazardous waste handling 3 Ambient air quality test report (3 Locations) 4 DG Stack emission test reports 5 Boiler stack emission test reports 6 Process stack emission test reports 7 Ambient noise test reports (Day & Night) 8 Water cess records 9 Waste water test report 10 Environmental improvement plan 11 Energy reduction plan 12 Environmental annual return on Form-V 13 Boiler certificate, operator certificate 14 DG Installation certificate Chemicals 1 List of chemicals with valid MSDS 2 License for storing of hazardous chemical-TDI 3 Chemical handling routines – procurement, storage, usage & accidental spillage etc. 4 Training Contents & Training Records 5 Steps to ensure safe storage, labeling, secondary Containments 6 Display of Instructions on Safe handling of chemicals in the storage & usage area. 7 Demonstrate proper use of PPE while handling Chemicals Waste 1 List of waste (hazardous, non-hazardous) 2 Quantification of waste (haz. & non haz.) 3 Documented routine for handling, storage, Transportation, recycling & disposal of hazardous & non- hazardous waste 4 Training contents & Training records for waste 5 Licensed contractor to dispose hazardous waste. 6 Haz. & Non hazardous waste area should be separate, labeled with safety instructions. 7 Process for recycling of waste 8 Waste disposal and recycling records for the last 12 months (docs must include name/contact info. for all disposal sites.) 9 Display of instructions on safe handling of waste in the storage area. 10 Demonstrate proper use of PPE while handling waste. 11 No incineration & land filling is allowed until proper authorization from pollution department. Emergencies & Fire Preventions 1 Emergency planning – Natural & unnatural disaster e.g. flood, earthquake, fire, electrocution, worker’s unrest, political unrest etc. 2 List of emergency contact number 3 Form emergency response team with responsibilities 4 Fire incidents & Accidents register 5 Fire training contents, Fire evacuation plan 6 Fire training records, Fire drill records, evacuation drill records. 7 Maintenance report of fire equipments 8 Secure secondary exit & always keep the same free from any kind of blockage. 9 Audible & Functional fire alarm 10 Fire No Objection Certificate 11 Demarcated emergency assembly point Workers Health & Safety 1 Work place Risk Assessment 2 Incident & Accident reporting routines 3 Health & Safety trainings & OH & S Policy 4 Safeguarding on machine & Other equipment 5 Safety information 6 Safe working routine – (Work permits) 7 Secure First aid kit with adequate contents & First aid trained person, First aid training records 8 Internal Air, Noise, Lux, Temperature test reports 9 Ergonomic assessments 10 Drinking water test reports & Analysis 11 Alcohol & drug policy 12 Health records for workers engaged in hazardous processes with fitness certificate 13 Compressor, PV’s, Lift, Chain pulleys, Pallets, Fork lift, Scissor lift test reports 14 Break areas/Eating areas for workers 15 Health & Safety committee & Minutes of meetings in once in two months, Display the minutes on notice board. 16 Records of inspection by local health & safety, or fire, authority 17 Documented plan & policy for addressing severe injuries (transportation, local hospital arrangements, etc.) 18 Canteen & Lunch room hygienic management system, cleaning records 19 Electrical supervisor & wiremen license 20 Forklift & Vehicle driving license 21 Electrical earthing points & resistance value check
An Analysis of The CO2 Emission Abatement in Plastic Recycling System Using Life Cycle Assessment (LCA) Methodology: A Case Study of Bandung City, Indonesia