HSE EVALUATION GUIDELINES

TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.


CHAPTER - 1
Saudi Aramco Construction Safety Manual. (SA-CSM)
Volume 1 - Contractor Safety Administrative Requirements. (CSAR)
1. CSAR - General Requirements (Section -4)
 4.1 - Contractor Safety Program and Performance
 4.3 - Contractor Safety Pre-Job Explanation Meetings
 4.4 - Facility Safety Orientation
 4.5 - Contractor Site Safety Staff
 4.6 - Safety Meetings
 4.8 - Hazard Control and Personal Protective Equipment (PPE)
 4.10 - Behavioral Observation and Site Safety Inspection
 4.12 - Work Permits
 4.15 - Transportation
 4.16 - Fitness for Duty
 4.17 - Heat Stress
 4.20 – Incident Reporting and Investigation
2. CSAR - Contractor Site Safety Program - (CSSP) (Section-5)
 5.3 - The CSSP shall state specifically how the contractor will meet SA’s safety requirements for the work to be performed-
3. Hazard Identification Plan (HIP) and Other Submittals (Section-6)
4. Contractor Personnel Site safety responsibilities (Section-7)
 7.4 - Site Safety Supervisor Safety Responsibilities
 7.7 - Field Safety Officer Responsibilities
5. CSAR - Personnel Qualifications training and certification (Section-8)
 8.2 - Safety Orientation for Contractor Employees
6. CSAR - Site Planning, Usage and Housekeeping - (Section-10)
 10.10 - Fire Protection and Prevention
 10.11 - Material Storage Yards
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
 10.20 – Housekeeping
7. CSAR - Contractor Camps and Project Support Facilities (Section-11)
 11.3 - Minimum Safety Standards for Contractor Camps Buildings and Project Support Buildings

CHAPTER - 2
Saudi Aramco Construction Safety Manual. (SA-CSM)
Volume 2 - Work Site Safety Manual (WSSM)
PART - 1. GENERAL SAFETY
1. Incident Reporting and Investigation (Section -2)
 2.2 References
 2.3 General Requirements
2. Personal Protective Equipment (PPE) (Section -3)
 3.3 General Requirements
 3.11 Respiratory Protection Equipment (RPE)
3. Work Permit System (Section-4)
 4.2 References
 4.4 Certification
 4.7 Issued Permits
 4.10 Permit Rules
4. Isolation, Lockout and Use of Hold Tags (Section-5)
 5.4 Electrical Lockout and Tagout (Lock, Tag, Clear, Try)
5. Confined Spaces(Section-6)
 6.7 Atmospheric Gas Testing
6. Fire Prevention (Section-7)
 7.4 Open Yard/Outdoor Storage
 7.5 Indoor Storage
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
 7.7 Storage of Flammable and Combustible Liquids and Gases
 7.8 Handling of Flammable and Combustible Liquids and Gases
 7.11 Housekeeping
7. Traffic and Vehicle Safety (Section-8)
 8.6 Dessert Driving (Off-Road Driving)
8. Compressed Gas Cylinders (Section-9)
 9.3 General Requirements
 9.4 Storage
 9.6 Handling of Cylinders
9. Hazardous Materials (Section-10)
 10.3 General Requirements
 10.4 Identification and Labeling
 10.6 Transportation, Storage and Disposal
 10.7 Hydrogen Sulfide(H2S)
10. Hand Tools and Power Tools (Section-11)
 11.3 General Requirements
 11.7 Portable Electric Power Tools and Extension Cords
 11.9 Fixed Electric Tools
11. Material Handling (Section-12)
 12.5 Site Storage
12. Heat Stress (Section-13)
 13.2 Responsibilities
 13.4 Control of Heat Stress

PART - II. CIVIL


1. Excavations and Shoring (Section -1)
 1.5 Underground Utilities and Installations
 1.7 Protection Against Sidewall Cave-in
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
 1.8 Entry and Exit
 1.9 Hazardous Atmospheres and Materials
 1.11 Edge Protection, Markers and Fixed Lighting
 Appendix A: Tables and Figures – Table 1.1,1.2 & 1.3
2. Scaffolding (Section-2)
 2.2 References
 2.4 Scaffold Components -2.4.2 Scaffold Tubing and Fittings Specifications
 2.4 Scaffold Components -2.4.3 Platform Units
 2.5 Requirements Common to all Scaffolds-2.5.1 Capacity
 2.5 Requirements Common to all Scaffolds-2.5.2 Foundations
 2.5 Requirements Common to all Scaffolds-2.5.4 Guardrail Systems
 2.5 Requirements Common to all Scaffolds-2.5.6 Scaffold Platform Construction and Use
 2.5 Requirements Common to all Scaffolds-2.5.8 Stability
 2.5 Requirements Common to all Scaffolds-2.5.9 Clearances
 2.5 Requirements Common to all Scaffolds-2.5.11 High Winds
 2.9 Mobile and Tower Scaffolds
3. Ladders and Step Ladders (Section-3)
 3.3 General Requirements
 3.4 Ladder Positioning
 3.6 Ladder Usage
 3.7 Stepladders
4. Temporary Walking and Working Surfaces (Section-4)
 4.3 General Requirements
 4.8 Temporary Stairways
 4.9 Roof Works
5. Fall Protection (Section-5)
 5.3 General Requirements
 5.4 Use of Personal Fall Arrest Equipment
 5.6 Anchor Points and Lifelines
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
 5.6.1 Anchor points for lanyards and self-retracting lifelines
 5.6.2 Horizontal lifelines
6. Concrete Construction (Section-6)
 6.5 Reinforcing Steel Construction
 6.6 Concrete Placement
7. Steel Erection (Section-7)
 7.6 Fall Protection Requirements
8. Abrasive Blasting (Section-8)
 8.3 General Safety Requirements
9. Painting and Coating (Section-9)
 9.3 Flammability Hazards of Coating Materials
 9.4 Health Hazards Associated with Coatings
 9.6 Painting/Coating Applications
10. Cutting, Welding and Brazing (Section-10)
 10.3 General Requirements
 10.5 Oxygen-Fuel Welding and Cutting

PART - III. MECHANICAL AND ELECTRICAL.


1. Machine Guarding (Section-1)
 1.3 General Requirements
2. Mechanical and Heavy Equipment (Section-2)
 2.2 References
 2.5 Portable Air Compressors
 2.6 Portable Electrical Generators
 2.7 Forklifts
3. Electrical Equipment (Section-3)
 3.3 General Requirements
 3.4 Temporary Electrical Installations
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
 3.7 Work Near Overhead Power Lines and Underground Cables
4. Pressure Testing (Section-4)
 4.2 References
 4.4 Pressure Test Procedures
5. Cranes and Lifting Equipment (Section-7)
 7.3 Crane Operations (General Requirements)
 7.7 Critical Crane Lifts
 7.8 Special Critical Crane Lifts
6. Slings and Rigging Hardware (Section-8)
 8.3 General Requirements
 8.12 Wire Rope Clips

CHAPTER - 3
EXPAND THE ABBREVIATIONS:

1. CSAR -
2. IDLH -
3. ALARP -
4. AED -
5. HIP -
6. LEL -
7. PFAS -
8. SSE -
9. GFCI -
10. MSDS -
11. STEL -
12. LOTO -
HSE EVALUATION GUIDELINES
TECNICAS REUNIDAS -MARJAN INCREMENT PROGRAM - PACKAGES 09 & 11.
13. MMSR -
14. FRC -
15. SAPO -

CHAPTER - 4
DESCRIBE THE FOLLOWING:

1. Roles and Responsibilities (HSE Officer/HSE Supervisor)?


2. Example for a Near Miss?
3. Example for an Unsafe Condition?
4. Example for an Unsafe Act?
5. Contractor Clinic basic requirements as per MMSR?
6. Contractor submittal deliverables to Saudi Aramco prior to start the activities?
7. List as per your opinion, Five (5) most important aspects regarding safety for:

 Hot Work
 Isolation and LOTO
 Confined Space Entry
 Excavations
 Scaffolding
 Work at Height
 Concrete Pouring
 Structural Steel Erection
 Lifting, Rigging and Hoisting
 Mechanical and Heavy Equipment