MINISTRY OF EDUCATION -TEN NEW UNIVERSITIES CONSTRUC

FINAL CERTIFICATE OF PAYMENT

Contract no ----------
Project name -Ten new universities project
Location - Adigrat
Employer - Ministry of Education
Contractor- Daniel Zegeye B.C
Consultant - Geretta Consult PLC
Block - SE -M1-156

previous payment
Pay. no date amount vat 1.as per the attachment, the
1 21/11/2003E.C 392,328.41 65,449.77 material on site to date is Bir
2 20/01/2004E.C 594,582.64 98,743.19
3 23/04/2004E.C 581,744.72 93,395.84
4 20/06/2004E.C 695,466.14 113,296.51
5 25/10/2004E.C 306,788.56 48,440.30
Escalation 27/10/2004E.C 432,153.88 68,234.82

total prev. payment 3,003,064.35 487,560.43

Advance payment check


Adv. payment paid
Adv. payment repaid
outstanding adv. Pay. - -

V
10.Total executed amount (1
11.MOE material deduction(7
12.executed amount after MO
13.Total 15% VAT 15%*(12)
14.total prev. vat paid
15.net payable vat for this pa
16.total payment to contr. in

we certify that the contractor is now entitled to the sum of birr Three hundred eighty three tho
11/100 .
Contractor Consultant
VERSITIES CONSTRUCTION PROJECT OFFICE
CATE OF PAYMENT

contract value amount (birr)


main contract 5,320,831.23
sup. contract no.1
sup. contract no.2
variation order no.1
variation order no.2
sum 5,320,831.23
15% vat 798,124.68
total sum 6,118,955.91

1.as per the attachment, the value of work executed plus


material on site to date is Birr: 4,767,584.70
deductions amount (birr)
2.previous pay 3,003,064.35
3.rebate -
4.retention 2.5% 119,189.62
5.penality -
6.advance payment -
7.MOE material deduction 1,375,861.98
8.total deduction 4,498,115.94
9.net payable to the contractor 269,468.76

VAT PAYMENT CHECK


10.Total executed amount (1) 4,767,584.70
11.MOE material deduction(7) 1,375,861.98
12.executed amount after MOE mat. deduc. (10-11) 3,391,722.72
13.Total 15% VAT 15%*(12) 508,758.41
14.total prev. vat paid 487,560.43
15.net payable vat for this payment (13-14) 21,197.98
16.total payment to contr. including 15% vat (15+9) 290,666.73

e hundred eighty three thousand three hundred eighty seven and


Consultant AUCP Project Engineer
MINISTRY OF EDUCATION TEN UNIVERSITIES CONSTRUCTION PROJECT OFFICE
CERTEFIACTE OF PAYMENT FINAL
Contract no ----------
Project name -Ten new universities project
Location -Adigrat
Employer -Ministry of Education
ContractoDaniel Zegeye G.C
Consultant - Geretta consult Plc
Block -SE-M1-156
Summery of work executed
Total (Birr) Total (Birr)
Item no Description Con.QTY Exc.QTY
A.Sub Structure
1 EXCAVATION & EARTH WORK 222,229.82 179,900.85
2 CONCREATE WORK 600,370.47 557,509.47
3 MASONRY WORK 32,031.11 12,630.82
750,041.15
B.Sup Structure
1 CONCRETE WORK 1,505,709.22 1,360,271.55
2 BLOCK WORK 558,047.69 313,370.55
3 3. ROOFING 173,026.54 167,771.80
4 CARPENTERY& JOINERY 215,867.79 209,368.11
5 METAL WORK 176,343.52 177,296.40
6 STEEL STRUCTURE 303,089.24 293,173.51
7 PLASTERING AND POINTING 438,954.16 422,557.02
8 FINISHING 241,471.08 234,855.34
9 GLAZING 55,096.52 50,325.28
10 PAINTING 107,088.58 101,384.18
11 SANITARY INSTALLATION 178,769.00 172,750.87
12 ELECTRICAL WORKS 512,736.49 514,418.95
4,017,543.55
5,320,831.23 4,767,584.70

Contractor_______________________________ Supervisor__________________________________________
ON PROJECT OFFICE

Remark
_______________________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___1________

Item no Description Unit Con.QTY Exc.QTY Rate Amount


A- SUB STRUCTURE
1.EXCAVATION & EARTH WORK
1.01 clear and remove top soil to an average depth of 200mm. m2 757.71 793.80 7.29 5,786.81
Bulk excavation in ordinary soil to reduce level to the
1.02 specified depth on the drawing. m3 102.29 241.34 38.27 9,236.08
Bulk excavation in soft rock to reduce level to the
1.03 specified depth on the drawing. m3 102.29 233.30 94.34 22,009.14
Bulk excavation in rock to reduce level to the
1.04 specified depth on the drawing. m3 136.39 - 105.22 -
Bulk excavation in ordinary soil to remove expansive soil material
1.03 to the specified depth on the drawing. m3 200.02 - 38.27 -
pit excavation in ordinary soil to a depth not exceeding 1500mm
1.04 from ground level. m3 42.00 38.65 40.25 1,555.52
Pit excavation in soft rock to a depth not exceeding 1500mm from
1.07 reduced ground level. m3 42.00 69.85 127.55 8,909.75
Pit excavation in rock to a depth not exceeding 1500mm from
1.08 reduced ground leve m3 56.01 134.03 163.33 21,891.94
1.05 Ditto but exceeding 1500mm but not exceeding 3000mm. m3 60.01 - 49.40 -
Ditto in soft rock excavation but exceeding 1500mm but not
1.1 exceeding 3000mm. m3 60.01 - 212.59 -
Ditt in rock excavation but exceeding 1500mm but exceeding
1.11 3000mm. m3 80.01 - 273.33 -
Trench excavation in ordinary ssoil to a depth of 800mm from
1.06 reduced ground level. m3 11.85 11.40 40.25 458.83

Fill around foundation and building in non expansive material 80%


from the site and 20% selected material from quarry waste well
1.07 rolled and compacted in layers not exceeding 200mm thick. m3 128.71 231.94 53.56 12,422.71
Fill under hard core with imported selected material from quarry
waste well rolled and compacted in layers not exceeding 200mm
1.08 thick. m3 222.68 137.17 91.73 12,582.60

1.09 Load and cart away surplus excavated material to an appropriate tip. m3 926.79 655.39 53.68 35,181.36
250mm thick basaltic stone hardcore well rolled,consoldated and
blindes with crushed stone.
1.10 M2 516.06 516.80 96.49 49,866.12
TOTAL CARRLED TO SUMMARY 179,900.85

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___2________

Item no Description Unit Con. QTY Exc. QTY Rate Amount


2. CONCREATE WORK
50mm lean concrete quality C-5, with minimum cement content of
2.01 150kg/m3,of concrete;
a) Under Footings. M2 135.54 121.42 43.29 5,256.27
b) Under beam and floor slab M2 587.66 574.90 43.29 24,887.50
Reinforced concrete quality C-25,360kg of cement/m3 filled in to
c) Under
form work masonry wall around rod reinforcement.(Formwork and
and vibrated M2 54.47 60.64 43.29 2,624.89
reinforcement measured spartely)
2.02
a) In footings M3 61.17 61.17 1,326.45 81,144.25
b) In foundation columns M3 5.06 2.43 1,326.45 3,228.31
c) In grade beams M3 46.05 44.45 1,326.45 58,958.05
d) In 100mm
Provide, thick
cut and fixground floorsawn
in position slab. structural wood or steel M2 516.06 516.80 132.64 68,548.47
formwork which ever is appropriare;
2.03
a) To footings M2 134.96 134.32 79.07 10,620.68
Mild steel reinforcement
b)To foundation columnsaccording to structral draw. M2 72.96 36.69 79.07 2,901.24
c) To grade beams M2 307.59 291.71 79.07 23,065.35
2.04
A) Dia 6mm plain bar kg 73.85 71.04 32.52 2,310.22
b) Dia 8 mm deformed ba kg 2,522.03 2,361.63 28.66 67,684.20
c) Dia 10mm deformed bar kg 179.58 171.03 28.66 4,901.79
d) Dia 12mm deformed bar kg 1,649.98 1,598.31 28.66 45,807.60
e) Dia 14 mm deformed bar kg 2,446.06 2,407.60 28.66 69,001.89
f) Dia 20mm deformed bar kg 3,470.92 2,617.49 28.66 75,017.18
10x100mm Styrofoam expansion joint filler between ground beam
2.05 and floor slab. m1 446.64 434.76 26.57 11,551.57
TOTAL CARRID TO SUMMARY 557,509.47
3. MASONRY WORK

400mm thick hard rachitic dressed stone masonry foundation wall


3.01 below ground level bedded in cement mortar mix ratio (1:3). M3 30.50 10.13 596.96 6,048.88
3.02 Ditto but exposed part above natural ground level. M3 21.79 10.38 634.38 6,581.95
TOTAL CARRIED TO SUMMARY 12,630.82

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___3________

Item no Description Unit Con. QTY Exc. QTY Rate Amount


B-SUPER STRUCTURE
1.CONCRETE WORK
Reinforced concrete quality C-25,360kg of
1.01
a) In elevation columns M3 23.18 23.18 1,343.57 31,139.65
b) In floor beams M3 44.54 43.85 1,343.57 58,919.31
c) In roof beams M3 11.66 10.97 1,343.57 14,734.66
d) In 150mm thick RC suspended solid slab. M2 37.00 36.97 201.34 7,443.98
e) In 40mm thick Tread and landing over the channel M2 115.58 27.30 53.74 1,467.10
1.02 ribbed slab for suspended floor slab made of 60mm M2 1,097.62 1,041.31 286.25 298,074.07
1.03 form work -
a) To Elevation columns M2 347.65 347.65 84.75 29,463.51
b) To floor beams M2 334.18 342.57 84.75 29,032.79
c) To roof beams M2 154.29 142.05 84.75 12,038.57
d) To 150 mm thick RC suspended solid slab M2 37.00 36.97 84.75 3,133.39
1.04 Pre-cast element (PB1) to the size of 4700x120x80 mm pcs 412.00 398.00 577.85 229,984.30
1.05 Mild steel reinforcement according to structural drawing -
a) Dia.6mm plain bar Kg 2,378.86 2,002.21 32.52 65,111.84
b) Dia.8mm deformed bar. Kg 2,186.37 1,188.11 28.66 34,051.31
c) Dia.10mm deformed bar. Kg 1,494.28 1,163.61 28.66 33,349.14
d) Dia.12mm deformed bar. Kg 3073.19 1,886.82 28.66 54,076.33
e) Dia.14mm deformed bar. Kg 3,133.96 2,496.83 28.66 71,559.06
f) Dia.16mm deformed bar. Kg 2,784.85 2,786.62 28.66 79,864.51
g) Dia.20mm deformed bar. Kg 11,117.11 10,705.79 28.66 306,828.03
TOTAL CARRIED TO SUMMARY 1,360,271.55

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___4________

Item no Description Unit Con. QTY Exc. QTY Rate Amount


2. BLOCK WORK
Class C, 190mm thick HCB wall with the designed
2.01 M2 1,664.79 1,506.05 185.36 279,161.91

2.02 Agrostone wall M2 864.75 0.00 242.78 0.00


2.03 Ditto as item 2-01 but 90mm thick M2 240.92 204.68 142.54 29,174.52

2.04 louvers wall 200mmthick. M2 18.51 17.98 280.00 5,034.12


TOTAL CARRIED TO SUMMARY 313,370.55
3. ROOFING
Roof cover in percolated or galvanized EGA-400,0.4mm
3.01 M2 656.35 622.79 215.39 134,143.65
Supply and fix G-28 galvanized flat metal sheet gutter
a) Development Length =760mm M1 79.96 76.57 136.47 10,449.51
3.02
b) Ditto item 3-2 but copping with flashing dev. Length 1000m1 M1 95.96 68.10 171.11 11,652.59
c) Ditto item 3-2 but dev. Length. Of 330mm for coping M1 70.38 14.43 61.45 886.72

Supply and fix wire mesh ventilation size 60x60mm (in flat metal
frames) under eave with combination of ribbed sheet size
3.03 120x60mm nailed to structural wood battens size 40x50mm placed
1200x600mm. price include one coat of anti rust and two coats of
synthetic M2 38.68 275.06 10,639.32
TOTAL CARRIED TO SUMMARY 167,771.80

4. CARPENTERY& JOINERY
4.01 Supply and fix 8 mm thick chip wood ceiling M2 554.85 536.39 191.66 102,804.51
4.03 Supply and fix 40mm thick Agro Stone doors
a) Type D1 size 1570x2540mm pcs 3.00 1.00 3,172.38 3,172.38
b) Type D1’ size 1570x2740mm pcs 1.00 2.00 3,413.48 6,826.96
c) Type D2 size 1170x2740mm Pcs 4.00 4.00 2,543.80 10,175.20
d) Type D2’ size 1170x2740mm pcs 4.00 4.00 2,543.80 10,175.20
e) Type D3 size 970x2740mm pcs 8.00 8.00 2,108.96 16,871.68
f) Type D3’ size 970x2540mm pcs 1.00 1.00 2,108.96 2,108.96
g) Type D4 size 870x2740mm pcs 11.00 9.00 1,891.55 17,023.95
h) Type D4’ size 870x2540mm pcs 3.00 5.00 1,753.48 8,767.40
i) Type D5’ size 770x2740mm pcs 14.00 16.00 1,674.13 26,786.08
j) Type D5’ size 770x2540mm pcs 5.00 3.00 1,551.93 4,655.79
TOTAL CARRIED TO SUMMARY………………………………………………… 209,368.11

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___5________

Item no Description Unit Con. QTY Exc. QTY Rate Amount


5. METAL WORK
5.01 Doors AND windows are manufactured from 38*1.5 mm LTZ
Window
a) W1= 4570x1340mm Pcs 36.00 36.00 3,706.82 133,445.52
b)W2= 1770x410mm Pcs 10.00 10.00 439.28 4,392.80
5.02 Doors
D6= 770x1800mm Pcs 14.00 14.00 1,221.60 17,102.40
MD1= 1570x2540mm pcs 2.00 2.00 2,839.05 5,678.10
Window Doors
DW1=1570x2740mm Pcs 4.00 4.00 3,004.31 12,017.24
DW2= 770x2740mm pcs 2.00 2.00 1,473.45 2,946.90
5.04 Balcony steel balustrade 1000mm high Ml 23.42 52.77 32.47 1,713.44
TOTAL CARRIED TO SUMMARY 177,296.40
6-0 STEEL STRUCTURE
6.1 RHS TRUSS
6.1.1 Upper and lower chord
a) 60x60x3mm. Kg 1,280.89 1,016.36 32.64 33,173.91
b) 40x40x3mm. kg 1,522.62 466.73 32.64 15,233.95
6.1.2 Vertical and Diagonals chord Truss
b) 40x40x3mm. Kg 887.82 808.76 32.64 26,397.92
6.1.3 RHS Lattice purlins
a) 25x25x2.5mm. kg 2,079.69 2,714.90 32.64 88,614.26
6.1.4 Lattice purl in to truss connection Angle Iron
a) size 25x25x2.5mm length 30mm pcs 204.00 162.00 6.40 1,036.80
6.1.5 Bolts with Nuts
a)Dia 16mm ] bolt. Dev length= 400mm Pcs 48.00 48.00 19.74 947.52
b) Dia 12mm purl in to truss connection bolt. Dev pcs 204.00 162.00 107.00 17,334.00
Length=100mm
6.1.6 Metal plates
a) 2(200x200x6mm) pcs 24.00 24.00 187.38 4,497.12
b) 2(200x300x5mm) pcs 29.00 28.00 221.35 6,197.80
c) 2(200x105x5mm) pcs - 110.95 -
c) 2(200x100x5mm) pcs 2.00 2.00 108.12 216.24
6.2 STEEL STAIR CASE
6.2.1 RHS POST
a) 130x130x3mm kg 109.43 143.56 32.64 4,685.82

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___6________

Item no Description Unit Con. QTY Exc. QTY Rate Amount


6.2.2 C-Section Channel beam and Tread
a)219x40x40x3mm kg 186.30 286.37 32.64 9,347.05
b)222x40x40x3mm kg 58.55 240.38 32.64 7,845.87
c)300x60x40x3mm kg 499.50 508.68 32.64 16,603.32
6.2.3 Metal plates
a) 2(250x250x4mm) pcs 2.00 2.00 193.04 386.08
b) 2(400x250x5mm) pcs 6.00 8.00 334.58 2,676.64
c) 2(150x60x4mm) pcs 4.00 4.00 71.89 287.56
d) 2(50x60x4mm) pcs 4.00 4.00 58.30 233.20
e) 2(120x60x4mm) pcs 4.00 4.00 67.81 271.24

6.2.3 Solid Metal plates b/n vertical post and C-section channel
a) 2(200x200x4mm) pcs 4.00 4.00 142.09 568.36
6.2.4 Bolts With Nuts
a) Dia 20mm ] bolt. Dev length=400mm pcs 8.00 8.00 37.05 296.40
b) Dia 16mm ] bolt. Dev length=300mm pcs 16.00 16.00 17.76 284.16
b) Dia 20mm ] bolt. Dev length=250mm pcs 4.00 16.00 23.73 379.68
6.2.6 4mm thick Sheet Metal Welded to 220x40x40x3mm
frame and 219x40x40x3mm C-Section channel Support m2 6.30 13.43 1,183.91 15,903.23
6.3 Supply,assemble &errect Structural fireescape Spiral
Stair Case Ls 1.00 1.00 39,755.38 39,755.38
TOTAL CARRIED TO SUMMARY 293,173.51
7.01 7. PLASTERING AND POINTING
Apply three coats of plastering in cement mortar (1:3)
a) to internal wall surface M2 3,146.13 2,732.55 81.35 222,292.93
b) to external wall surface M2 991.37 921.23 79.39 73,136.79
c) to concrete ceiling M2 1,118.34 1,061.78 91.36 97,004.22
d) to exposed column and beams. M2 321.26 89.43 28,730.49
Apply two coats of plastering in cement mortar (1.3) to
7.02 receive ceramic wall tile. M2 38.45 24.92 55.88 1,392.59
TOTAL CARRIED TO SUMMARY 422,557.02

Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___7________

Item no Description Unit Con. QTY EXC. QTY Rate Amount


8.FINISHING
8.01 200X200X20mm terrazzo tile M2 54.20 238.02 12,900.68
8.02 260x 30mm terrazzo window sill M1 193.40 189.24 109.68 20,755.84
8.03 150x150x6mm white glazed Ceramic wall tiles M2 38.45 24.92 206.60 5,148.68
8.04 50mm thick cement sand screed . M2 1,643.51 1,549.35 85.24 132,066.34
8.05 100mm thick precast concrete pvement M2 153.32 147.13 160.24 23,576.66
Supplyand fix 30x03x3mm angle iron corner
8.06 protectionH=1.5m No 21.00 21.00 84.67 1,778.07

Supply and fix 30x03x3mm angle iron corner protection to balcony


8.07 M1 56.45 -
8.08 Half Dia. 400mm concerte pipe ditch M1 130.84 97.59 220.28 21,497.13
8.09 Ditto as item 8.08 but with metal grill cover M1 23.93 24.03 712.94 17,131.95
TOTAL CARRIED TO SUMMARY 234,855.34
9. GLAZING
9.01 4mm thick clear glass glazed to metal beads M2 323.19 295.20 170.48 50,325.28
TOTAL CARRIED TO SUMMARY …………………………… 50,325.28
10. PAINTING
Apply three coats of approved quality plastic paint.
10.01

a) To all internal wall surface. M2 3,146.13 2,732.55 16.90 46,180.09

b) To all external wall surface. M2 991.37 921.23 16.90 15,568.86


c) To exposed beams & columns. M2 321.26 16.90 5,429.33
d) To RC ceiling M2 1,118.34 1,061.78 21.16 22,467.26
e) To chip wood ceiling M2 535.23 536.39 19.09 10,239.69
f) To 100mm height plastered skirting M2 194.06 88.70 16.90 1,498.95
TOTAL CARRIED TO SUMMARY ……………………………… 101,384.18

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___8________

Item no Description Unit Con. QTY EXC. QTY Rate Amount


11. SANITARY INSTALLATION
11.1 SANITARY EQUIPMENT (FIXTURES)
All fixtures that specified below is subject to the owner’s or
consultants approval, based on samples, catalogues and brochures
presented by the contractor.

Supply and fix hand wash basins made of white vitreous


china as per the technical specification & complete with
11.1.1 the followings.
- Lever action chrome plated mixing valve /water tap/
- Smell trap
- Heavy duty flexible pipes for a working pressure of 4bars
- Chrome plated chains, with plug
Fixing shall be on wall with brass/stainless steel screws, .
Type : Tabor ceramic or equivalent
Size : 500 or 400 mm /Approximately size/ No 15.00 15.00 904.00 13,560.00
11.1.2 Supply & fix Tabor ceramic wash down water closest .
Cistern- Vitreous china with a capacity of 7-9 liter &max.
Seats… - Hard cover /smooth & non absorbent/
- Seats & cover to be fixed to WC pan No 14.00 14.00 1,156.00 16,184.00
11.1.3 Supply & fix urinals made of 80mm think
Internal size : 1300 r300 mm, depth =350mm No 3.00 3.00 845.00 2,535.00
11.1.4 Supply and fix toilet paper holder No 14.00 14.00 208.00 2,912.00
11.1.5 Supply and fix crystal glass mirrors for toilet hand wash No 15.00 15.00 450.00 6,750.00
11.1.6 Supply & fix soap holder No 15.00 15.00 190.00 2,850.00
11.1.7 Supply & fix floor drains Size:- Dia. 100 mm No 6.00 6.00 256.00 1,536.00

11.1.8 Supply & fix recessed wall mounted fire hose with cabinet complete No 3.00 3.00 16,421.00 49,263.00
11.1.9 Supply & fix stainless steel kitchen sink with double bowl
- Sink material shall be strictly from stainless steel describe in
catalogues.

- Level action /long/ chrome plated mixing valve /water trap/


- Brass smell trap
- Heavy duty flexible pipes for a working pressure of 4bars or as
per technical specification requirement.
- Chrome plated chains, with plug
Fixing shall be on wall with brass /stainless steel screws, supported
with concealed angle iron or similar as required. Priced shall include all
assistance civil works. No
Size:- 1500r600mm 2.00 2.00 1,631.00 3,262.00
1.1.10 Ditto to item 1.8above,stainless steel janitor sink with single. No 1.00 - 1,440.00 -

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___9________

Item no Description Unit Con. QTY EXC. QTY Rate Amount


11.2 WATER SUPPLY PIPES,VALVES & ACCESSORIES
11.2.1 Supply & install PPR pipe (PN10) to internal water distribution system MI
Internal dia. 15mm MI 38.00 38.00 48.00 1,824.00
“ dia. 20 mm MI 38.00 38.00 50.00 1,900.00
“ dia. 25mm MI 18.00 18.00 54.00 972.00
“ dia. 32mm MI 5.00 5.00 59.00 295.00
11.2.2 Ditto but to be installed In walls,
Internal dia. 15mm MI 1.00 1.00 50.00 50.00
“ dia. 20 mm MI 1.00 1.00 52.00 52.00
“ dia. 25mm MI 1.00 1.00 55.00 55.00
“ dia. 32mm MI 1.00 1.00 61.00 61.00
Ditto item no. 2.1 above, but galvanized steel pipes for
11.2.3 fire fighting.
i) dia. 32 mm MI 17.00 17.00 153.00 2,601.00
i) dia. 50mm MI 2.00 2.00 178.00 356.00
Supply and fix chrome service calves of approved standard before hand
wash basins& water closets
complete with unions, elastic water proofing, hand wheels
of normal quality and with all other necessary accessories Internal dia.
11.2.4 15mm. No 58.00 38.00 209.00 7,942.00
Supply and fix approved quality bronze gate valves at
internal branch water pipes and pipes and pipe inlet to
building of the following sizes and as where shown on
11.2.5 the drawing.
A) dia.20 mm No 2.00 2.00 229.00 458.00
B) dia.32 mm No 5.00 5.00 303.00 1,515.00
C) dia.50 mm No 1.00 1.00 438.00 438.00
11.3 WASTE,VENTAND STORM WATER PIPES AND ACCESSORIES
Supply and lay internal uPVC (PN4) waste and vent pipes
11.3.1 . Complete with all the necessary fittings.
Dia. 50 ” M1 62.00 62.00 103.00 6,386.00
“ 80 “ M1 38.00 38.00 187.00 7,106.00
“ 110 “ M1 65.00 65.00 211.00 13,715.00
Supply and install vent caps made of rigid uPVC to be .
11.3.2 Dia.110mm No 2.00 2.00 238.00 476.00
11.3.3 Supply and fix approved quality clean outs . Dia.110mm No 1.00 1.00 190.00 190.00
Supply and fix uPVC Down pipes with mass concrete
support at ground level and complete with strainer at inlet,
galvanized clips at every elbow, joints and at every 1m
interval & al the necessary accessories. Unit price shall
11.3.4 include all the necessary assis Dia.110mm M1 88.00 78.40 228.00 17,875.20
11.4 Water proofing
Apply pidifin 2K or compatable equivalent water proofing M2 51.00 59.09 163.00 9,631.67

TOTAL CARRIED TO SUMMARY …………………………….. 172,750.87

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___10________
Description Unit Con. QTY EXC. QTY Rate Amount
12.ELECTRUCAL WORKS
SUPPLY AND INSTALL
12.1 Feeder Cables
PVC Sheathed PVC insulated power cable type SEMENS
12.1.1 5x16mm2 from Power Intake up to MDB- SA M1 16.00 16.00 255.22 4,083.52
12.1.2 5x10mm2 from MDB-SA up to SDB- SA1 M1 8.00 8.00 179.29 1,434.32
12.1.3 5x6mm2 from MDB-SA up to SDB-SA2 M1 10.00 10.00 116.01 1,160.10
12.2 Conduits and pipes
12.2.1 PVC pipe of 32mm diameter. M1 15.00 15.00 26.29 394.35
12.2.2 PVC pipe of 50mm diameter. M1 15.00 15.00 44.93 673.95
12.3 Distribution Boards
12.3.1 Flush mounting distribution, MDB-SA in sheet steel :-
1 pc main ACB of 63A/3P
1 pc ACB of 32A /3P
1 pc ACB of 25A /3P
4 pc ACB of 16A /3P
10 pc ACB of 10A /3P
25% reserve pitches No 1.00 1.00 6,859.85 6,859.85
12.3.2 Flush mounting distribution, SDB-SA1 in sheet steel :-
1 pc main ACB of 32A /3P
1 pc ACB of 20A /1P
13 pcs ACB of 16A /1P
9 pcs ACB of 10A /1P
25% reserve pitches No 1.00 1.00 6,712.75 6,712.75
12.3.3 Flush mounting distribution, SDB-SA2 in sheet steel :-
1 pc main ACB of 25A /3P
1 pc ACB of 20A /1P
6 pcs ACB of 16A /1P
9 pcs ACB of 10A /1P
25% reserve pitches No 1.00 1.00 4,854.47 4,854.47
12.4 Light points
12.4.1 Flush mounted light points fed trough PVC
insulated conductors of 3x2.5mm2 inside PVC conduits
No 226.00 226.00 237.08 53,580.08
Extra Over Light points for :-
12.5
( TYPE LEGRAND SUNO OR EQUIVALENT )
12.5.1 Flush mounting single switch,7740 01+77 40 41 NO 37.00 37.00 79.54 2,942.98
12.5.2 Flush mounting 2 gang single switch, 77 40 05 + 77 40 42 No 33.00 33.00 115.73 3,819.09
12.5.3 Flush mounting two-way switch, 77 40 06 + 77 40 41 NO 10.00 10.00 96.76 967.60
12.5.4 Flush mounting intermediate switch, 77 40 07 + 77 40 41 No 3.00 3.00 131.24 393.72
12.6 Socket outlet points
12.6.1 10-16A /p flush mounted socket outlets point . No 87.00 87.00 256.86 22,346.82
12.6.2 20A/ 1p flush mounted socket outlets point s. No 2.00 2.00 362.19 724.38
12.7 Extra Over socket points for :-
( TYPE LEGRAND SUNO OR EQUIVALENT )
12.7.1 Flush mounting socket outlet of 10-16A/ 1p,7740 20 + 77 40 No 43.00 43.00 88.15 3,790.45
12.7.2 Flush mounting socket outlet of 10-16A/ 1p twin, + 7740 25 + No 44.00 44.00 164.84 7,252.96
12.7.3 Flush mounting socket outlet of 20A / 1p. No 2.00 2.00 350.79 701.58
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___11________

Item no Description Unit Con. QTY EXC. QTY Rate Amount


12.8 Data /Telecom points/ Outlets
Data /Telecom points fed through2x (twisted pair category 5E UTP
12.8.1 cable). Inside PVC conduit of 25mm diameter. No 31.00 31.00 257.06 7,968.86
RJ 45 twin outlets type LEGRAND 2(74213) category 5E
12.8.2 with 8 contacts complete with clip on support frame. No 31.00 31.00 681.18 21,116.58
12.8.3 Flush mounted DT box No 1.00 1.00 1,155.09 1,155.09
12.9 Light fittings and lamps
(Specified type or equivalent)
12.9.1 MODUS TU 118k + 1x T818w /840 lamp. No 4.00 5.00 471.52 2,357.60
12.9.2 MODUS TU 136k + 1x T8 36w /840 lamp. No 70.00 70.00 525.47 36,782.90
12.9.3 MODUS TU 236k + 2x T8 36w /840 lamp. No 144.00 144.00 1,018.58 146,675.52
12.9.4 MODUS TU 136k + RFTUB 136 +1x T8 36w /840 lamp. No 8.00 8.00 708.45 5,667.60
12.1 Low voltage system ear thing
12.10.1 1x50mm sq. circular bare galvanized steel rod down conductor from roof No 1.00 1.00 1,685.74 1,685.74
12.11 Lightning Arrester System
12.11.1 Air termination circular Galvanized steel rob of up to 1.0m with roof mo No 2.00 2.00 628.45 1,256.90
12.11.2 1x50mm sq. circular bare galvanized steel rod down ml 235.00 235.00 152.69 35,882.15
1x50mm sq. circular bare galvanized steel rod down
conductor from roof bond to test junction box inside PVC
12.11.3 conduit of 32mm diameter. M1 60.00 60.00 152.69 9,161.40
12.11.4 Testing junction boxes at 1.5m above ground level made of galvanized ste No 8.00 8.00 444.26 3,554.08
12.11.5 30x3.5mm bare galvanized steel tape conductor from testing junction box ml 42.00 42.00 52.11 2,188.62
12.11.6 1500mm long and 50x50x3mm X-head galvanized steel earth rod includingNo 8.00 8.00 565.05 4,520.40
12.11.7 Bonding materials for down conductor with galvanized Ls 1.00 1.00 618.23 618.23
12.11.8 30x3.5mm galvanized steel ring earth termination network. Ml 292.00 292.00 373.49 109,059.08
12.12 Manhole
12.12.1 Manhole in brick or masonry, internally of 600x600x700mm No 1.00 1.00 2,075.23 2,075.23
TOTAL CARRIED TO SUMMARY…………… 514,418.95

Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


A. SUB STRACTURE
1.Excavation & Earth Work 242.53
1.01 Site clear d=200mm
1 45.49 1 111.64
17.45 1.00
793.80 m2 0.50
55.82
46.69 -61.18
1 17.23 1.02 Bulk excav.in ordinay soil -2.29
0.30 av. d=0.3m
241.34 m3
234.88
46.69 1.03.Bulk excav. In soft rock
1 17.23 av. D=0.29m
0.29
233.30 m3 9 5.51
4.61
0.60
137.17

1.06 pit excav.in ordinary soil depth


not exceeding 1.50m from NGL 158.76
38.65 m3 241.34
233.30
1.07 pit excav.in soft rock depth 0.00
not exceeding 1.50m from NGL -231.94
69.85 m3
38.65
1.08 pit excav.in hard rock depth 69.85
not exceeding 1.50m from NGL 11.40
134.03 m3 134.03
655.39
63.33
0.40 1.09.Trench excav.in ordinary soil
0.45 d=0.5m
11.40 m3

Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


1.10.250mm thick stone hard core
9 5.61 under GFS-3
4.51 1 43.59
227.71 0.30
9 3.91 under GFS-2 13.08
4.51 1 33.97
158.71 0.30
7 4.01 under GFS-1 10.19
4.51 4 14.73
126.60 0.30
1 4.51 under GFS-4 17.68
0.84 2 15.87
3.79 0.30

516.80 Total # 1.10 = 516.80M3 9.52


2 10.12
2.CONCRETE WORK 0.30
2.01 Lean concrete 6.07
a) under Footing 1 5.21
0.30
1.56

8 1.40 F1 516.80
1.40
15.68 m2 574.90

14 1.70 F2
1.70
40.46 m2

16 2.00 F3
2.00
64.00 m2

2 0.80 F4
0.80
1.28 m2
121.42 m2 TOTAL
Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


4 13.02 GB 5 & GB6 4 5.56
0.30 4.51
15.62 m2 100.30
1 4.61 GB7
0.30 4 5.46
1.38 m2 4.46
97.41
1 4.06 GB STR 1
0.25 1 4.46
1.02 m2 4.51
20.11
4 4.46 b/n axis A & B 1665.60
3.81
67.97 m2 121.27
0.50
2 4.51 60.64
3.81
34.37 m2

4.61
1.12 8 1.40
5.16 m2 1.40
0.35
4.61 5.49
3.70
17.06 m2 14 1.70
1.70
4 4.51 b/n axis B & C 0.50
3.81 20.23
68.73 m2
16 2.00
4 4.46 2.00
3.86 0.55
68.86 m2 35.20

1 4.61 2 0.80
3.86 0.80
17.79 m2 0.20
0.26
61.17

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


b) in foundation column 4 13.43
16 0.20 0.30
0.40 0.50
0.60 0.77 m3 8.06
5 0.20
0.40 2 13.43
0.65 0.26 m3 0.30
1 0.20 0.50
0.40 4.03
0.75 0.06 m3
4 0.20 FC4 2 14.15
0.40 0.30
0.80 0.26 m3 0.50
8 0.20 4.25
0.40
0.85 0.54 m3 4.61
2 0.20 0.30
0.40 0.50
1.13 0.18 m3 0.69
2 0.25
0.25 4.06
1.00 0.13 m3 0.30
2 0.20 0.50
0.40 0.61
1.50 0.24 m3 44.45

2.43 m3 TOTAL
3 43.49 C) in Greade Beam 4 4.46
0.30 3.91
0.50 GB1 69.75
19.57 m3
2 14.63 GB2 2 4.51
0.30 3.91
0.50 m3 35.27
4.39
2 9.52 GB3 4.61
0.30 1.48
0.50 6.82
2.86

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


4.61 16 8.00
3.91 0.55
18.03 m2 70.40

4 4.51 b/n axis B & C 1 3.20


3.96 0.20
71.44 m2 0.64
134.32
4 4.46
3.96 16 1.20
70.65 m2 0.60 11.52
5 1.20
1 4.61 0.65 3.90
3.96 5 1.20
18.26 m2 0.80 4.80
8 1.20
4 5.56 b/n axis C & D 0.85 8.16
4.51 2 1.20
100.30 m2 1.13 2.71
2 1.00
4 5.56 1.00 2.00
4.46 2 1.20
99.19 m2 1.50 3.60

1 5.56
4.61 36.69
25.63 m2
516.80 m2 TOTAL
1 43.49
2.03 Form Work 0.50
8 5.60 a) in Footing 21.75
0.35 F1
15.68 m2 5 41.49
0.50
14 6.80 F2 103.73
0.50
47.60 m2

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


8 13.43 4GB4
0.50
53.72 m2 6/2 3.91
2 14.63 4GB2 46.92
0.50 6/2 4.51
14.63 m2 54.12
2 13.53 9/2 3.96
0.50 71.28
13.53 m2 9/2 4.51
2 10.43 GB3 (external) 81.18
0.50 9/2 5.56
10.43 m2 100.08
2 9.52 (internal) 9/2 4.51
0.50 81.18
9.52 m2 434.76
2 14.45 4GB6
0.50
14.45 m2
2 14.05 63.33
0.50 0.40
14.05 m2 0.40
2 14.15 GB5 10.13
0.50
14.15 m2
2 14.45 43.69
0.50 0.40
14.45 m2 0.45
2 4.06 7.86
0.50 GB 8
4.06 m2 10.52
2 4.06 0.40
0.40 0.25
3.25 m2 1.05
291.71 m2 TOTAL
9.12
2.04 Mild Steel Reinforcement 0.40
71.04 a) dia. 6mm plain bar 0.40
2361.63 b) dia. 8mm plain bar 1.46
171.03 c) dia. 10mm plain bar
1598.31 d) dia. 12mm plain bar 10.38
2407.60 e) dia. 14mm plain bar
2617.49 f) dia.20mm plain bar

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


B.SUPER STRUCTURE 8 14.23
1.Concrete Work 0.48
1.01 Reinforced concrete C-25 0.20
76 0.40 a) In Elevation Column 10.93
0.20 C1,C2 &C3 at G+0 &G+1
2.61 4 14.85
15.87 m3 0.48
35 0.40 0.20
0.20 C1,&C2 at G+2 5.70
2.61 m3
7.31 4 14.75
23.18 m3 TOTAL 0.48
0.20
b) In Floor Beams 5.66

2 43.50 FB1 at 1st &2nd on axis D 2 4.61


0.48 0.48
0.20 0.20
8.35 m3 0.89
43.85
4 5.01 FB2 at 1st &2nd on axis B
0.48
0.20 43.49
1.92 m3 0.30
0.20
4 13.83 FB3 at 1st &2nd on axis A 2.61
0.20
0.48 19.44
5.31 m3 0.30
0.20
4 10.74 FB4 at 1st &2nd on axis 1 & 10 1.17
0.48
0.20 2 19.44
4.12 m3 0.30
0.20
2 5.01 FB2' at 1st &2nd on axis B 2.33
0.48
0.20
0.96 m3

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


33.87 RB4 on axis A
0.30
0.20 2 10.02
2.03 m3 4.61
92.38

2 9.92 RB5 on axis 1 &10 5 14.23


0.30 4.61
0.20 328.00
1.19 m3 1 11.53
4.61
2 4.01 RB6 on axis 2 &9 53.15
0.30 1 10.22
0.20 4.61
0.48 m3 47.11

2 3.91 RB7 on axis 4 &7 2 10.02


0.30 4.61
0.20 92.38

0.47 m3 5 14.23
4.61
2 5.71 RB8 on axis 5 &6 328.00
0.30 1 11.53
0.20 4.61
0.69 m3 53.15
10.97 m3 TOTAL 1 10.22
4.61
d) In 150mm thick suspended 47.11
2 4.61 solid slab
4.01
1041.31
36.97 m2 TOTAL
e) 40mm thick tread& landing
2 4.30 over the channel 76 1.20
1.50 2.61
12.90 m2
32 1.50 238.03
0.30 m2 35 1.20
14.40 2.61
27.30 m2 TOTAL 109.62
347.65

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


b) In Floor Beams
2 41.49 to FB-1
0.88 On axis D 2 16.84
73.02 0.13
2 9.22 to FB-2 4.38

0.88 On axis B
16.23 36 0.20
2 4.61 to FB-2' 0.20
0.73 On axis B 1.44
6.73 30 0.40
4 13.83 to FB-3 0.20
0.88 On axis A 2.40
48.68 342.57
4 9.94 to FB-4
0.88 On axis 1 & 10
34.99 43.49
8 13.43 to FB-5 0.30
0.60 On axis 3,4,7 & 8
64.46 13.05
4 14.15 to FB-6
0.60 On axis 5 & 6 1 43.09
33.96 0.30
4 14.15 to FB-7 12.93
0.60 On axis 2 & 9 1 41.49
33.96 0.20
2 4.61 to FB-8 8.30
0.88 On axis 1 19.04
8.11 0.40
Addition to 7.62
External Side Part 1 18.44
4 2.70 to FB-6 0.20
0.28 On axis 5 & 6 3.69
3.02 2 19.14
4 3.81 to FB-7 0.30
0.28 On axis 2 & 9 11.48
4.27 2 19.04
to all external beam column
40 0.20 connection 0.30
0.48 11.42
3.84 2 18.44
16 0.40 0.20
0.48 7.38
3.07

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


1 33.87 RB4 on axis A 2 5.71
0.30 0.60
10.16 m2 6.85
1 33.47 2 5.51
0.30 0.20
10.04 m2 2.20
1 32.27 142.05
0.20
6.45 m2 2 4.61
2 11.14 RB5 on axis 1& 10 4.01
0.30
6.68 m2 36.97
2 10.74
0.30 2 199.00
6.44 m2 398.00
2 9.94
0.20
3.98 m2
2 4.31 RB6 on axis 2 &9
0.30
2.59 m2
2 4.11
0.30
2.47 m2
2 3.91
0.20
1.56 m2
2 4.61 RB7 on axis 4 &7
0.30
2.77 m2
2 4.11
0.30
2.47 m2
2 3.81
0.20
1.52 m2

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


2 .BLOCK WORK -3 0.77
2.01.19cm thick HCB wall 2.74 -6.33
a) Ground Floor -2 4.41
1 27.66 on axis D 2.74 -24.17
2.61 72.19 -10 4.57
1 27.66 on axis C 1.34 -61.24
2.61 72.19 -4 1.77
1 19.00 on axis B 0.41 -2.90
2.61 49.59
1 27.66 on axis A 401.42
2.61 72.19
1 4.63 on axis b/n C & D 1 36.88
2.81 13.01 2.61 96.26
1 9.25 on axis b/n B & C 1 41.49
2.81 25.99 2.61 108.29
1 0.80 On axis 1 & 10 1 29.08
2.61 2.09 2.61 75.90
2 13.83 on axis 2 & 9 1 27.66
2.61 72.19 2.61 72.19
1 5.41 on axis 3 1 4.63
2.61 14.12 2.81 13.01
3 11.13 On axis 5,6 & 8 1 14.06
2.61 87.15 2.81 39.51
1 5.72 On axis 7 1 1.40
2.81 16.07 2.81 3.93
1 6.13 b/n axis 6 & 7 1 10.02
2.81 17.23 2.61 26.15
1 4.11 b/n axis 7 & 8 1 8.42
2.81 11.55 2.61 21.98
-2 1.57 DEDUCTION 1 5.41
2.54 -7.98 D1=1570X2540mm 2.61 14.12
-2 1.17 1 3.81
2.74 -6.41 D2=1170X2740mm 2.61 9.94
-3 0.97 D3=970X2740mm 2 11.85
2.74 -7.97 2.61 61.86
-3 0.87 D4=870X2740mm 1 5.72
2.74 -7.15 2.61 14.93

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

LWH Description No. LWH


1 11.13 On axis 8
2.61 29.05 1 36.88
1 11.93 On axis 9 2.61 96.26
2.61 31.14 1 19.94
1 10.02 on axis 10 2.61 52.04
2.61 26.15 1 33.50
1 1.82 on axis 10 (For Guard rail) 2.61 87.44
0.60 1.09 1 27.66
1 6.13 b/n axis 6 & 7 2.61 72.19
2.81 17.23 1 4.63
1 4.13 b/n axis 7 & 8 2.81 13.01
2.81 11.61 1 4.61
1 1.82 b/n axis 9 & 10 2.81 12.95
2.81 5.11 1 1.40
1 4.61 On axis D ( For Guard Rail) 2.81 3.93
0.60 2.77 2 10.02
Deduction 2.61 52.30
-1 1.57 D1=1570X2540mm 1 4.61
2.54 -3.99 2.61 12.03
-2 1.17 D2=1170X2740mm 1 9.22
2.74 -6.41 2.61 24.06
-5 0.97 D3=970X2740mm 2 12.03
2.74 -13.29 2.61 62.80
-6 0.87 D4=870X2740mm 1 5.72
2.74 -14.30 2.61 14.93
-2 0.87 D4'=870X2540mm 1 13.03
2.54 -4.42 2.61 34.01
-2 0.77 D5=770X2740mm 1 4.61
2.74 -4.22 2.61 12.03
-1 0.77 D5'=770X2540mm 1 3.92
2.54 -1.96 2.81 11.02
-14 4.57 a) W1 = 4570 x 1340 mm 1 6.13
1.34 -85.73 2.81 17.23
-3 1.77 b) W2 = 1770 x 410 mm 1 4.13
0.41 -2.18 2.81 11.61
-1 1.77 DW2=1774x2740mm 1 4.61
2.74 -4.85 0.60 2.77
-12.08 DW1
528.78

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


Deduction
D1=1570X2540mm
-2 1.57 4 2.02
2.54 -7.98 2.81
-4 1.17 D2'=1170X2740mm 22.70
2.74 -12.82 1 6.41
-1 0.97 D3'=970X2540mm 2.81
2.54 -2.46 18.01
-3 0.87 D4'=870X2540mm
2.54 -6.63 1 17.51
-2 0.77 D5=770X2740mm 2.81
2.74 -4.22 49.20
-1 0.77 D5'=770X2540mm 1 4.44
2.54 -1.96 2.81
-12 4.57 a) W1 = 4570 x 1340 mm 12.48

1.34 -73.49 4 2.02


-3 1.77 b) W2 = 1770 x 410 mm 2.81
0.41 -2.18 22.70
-1 1.77 DW2=1774x2740mm 1 6.41
2.74 -4.85 2.81
-12.08 DW1= 18.01
463.95
d) On Parapet Wall 1 5.01
2 14.63 On axis B 2.81
2.88 84.27 14.08
1 10.84 on axis 1 & 10 1 4.44
2.67 28.94 2.81
12.48
1 5.03 on axis 2 & 8 1 2.60
1.08 5.43 2.81
1 4.21 on axis 4 & 7 7.31
2.67 11.24
Deduction -9 0.77
-2 13.83 On axis A 2.74
0.65 -17.98 -18.99
111.91 -14 0.77
2.54
1506.05 -27.38
204.68
2.02 ditto but 9cmthick wall
Ground Floor 2 13.83
1 17.51 b/n axis C&B 0.65
2.81 17.98
49.20
1 8.85 b/n axis A & B
2.81
24.87

Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


3. ROOFING
2 10.66 3.01Roof cover in
14.33 EGA 400mm 1 77.36
305.52 covered axis 2-9&B-A 0.50
2 7.22 38.68
6.45 m2
93.07
2 7.02 covered axis 1-10&B-D
9.26
129.92 m2 1 134.93
2 9.72 134.93
4.85 m2 Total 1 26.78
94.29 26.78
622.79 1 7.49
7.49
3.02.Flat metal sheet guttering 1 18.42
33.48 a) dev't length=760mm 18.42
43.09
76.57 ml 1 54.73
54.73
b) copping with flashing dev't 1 93.40
length=1000m 93.40
2 10.66 1 38.81
21.32 ml 38.81
1 12.47
2 14.33 12.47
28.66 ml 1 27.14
2 4.21 27.14
8.42 ml 1 18.99
18.99
2 4.85 1 38.81
9.70 ml 38.81
1 64.42
68.10 ml total 64.42
C) but dev't length=330mm
1 14.43 536.39
14.43 ml

14.43 ml TOTAL
Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


4.03.fix 40mm thick agro stone
doors 40x20x2mmRHS frame
in pcs
1 a)Type D1 size 1570x2540mm
2 b)Type D1' size1570x2740mm
4 c)Type D2 size1170x2740mm
4 d)Type D2' size1170x2740mm
8 e)Type D3size 970x2740mm 2 11.11 22.23
1 f)Type D3' size 970x2540mm 5 11.11 55.57
9 g)Type D4 size 870x2740mm
5 h)Type D4' size 870x2540mm 2 10.26 20.52
16 i)Type D5 size 770x2740mm 5 14.60 73.00
3 j)Type D5' size 770x2540mm
2 2.57 5.14
5. METAL WORK 5 2.57 12.84
5.01 Window 189.29
36 a) W1=4570x1340mm 5.37
10 b) W2=1770x410mm 1016.36

5.02 Doors
14 D6=770x1800mm
2 MD1=1570x2540mm 2 6.73 13.46
2 9.27 18.54
Window Doors 5 4.95 24.75
4 DW1=1570x2740mm 1 11.11 11.11
2 DW2=770x2740mm 1 4.95 4.95
2 4.36 8.72
5.04 Balcony steel balustarde
1000mm high 2 14.60 29.20
8 3.00 24.00 on flight 1 14.60 14.60
2 4.15 8.30 on landing 2 4.29 8.58
4 1.50 6.00 on landing 133.91
3 0.85 2.55 on landing 3.49
1 2.70 2.70 second floor stair side 466.73
2 4.61 9.22 on Axis D,first & second floor
52.77 ml TOTAL
Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


6.1.2Vertical &Diagonal chords
b) 40x40x3mm
14 0.51 7.08 on T-2 96 0.20 19.20
1 1.49 1.49 on T-2 132 0.20 26.40
1 0.89 0.89 on T-2 102 0.20 20.40
1 9.04 9.04 on T-2
2 7.84 15.67 on T-2 32 0.34 10.75
18 0.51 9.11 on T-1 44 0.34 14.78
2 3.83 7.67 on T-1 34 0.34 11.42
2 5.49 10.98 on T-1
2 2.73 5.45 on T-1
2 12.42 24.84 on T-1 48 4.91 235.68
35 0.51 17.71 on T-3 10 4.91 49.10
5 1.18 5.91 on T-3
5 2.39 11.92 on T-3 48 4.12 197.81
5 12.95 64.77 on T-3 10 4.12 41.21
7 0.51 3.54 on T-4
1 6.04 6.04 on T-4 288 0.20 57.60
1 12.95 12.95 on T-4 60 0.20 12.00
2 2.78 5.55 on T-5
6 0.50 2.99 on T-5 96 0.34 32.26
6 1.16 6.94 on T-5 20 0.32 6.40
2 0.75 1.49 on T-5
232.04 total ml 16 5.11 81.76
3.49 kg/ml 10 5.11 51.10
808.76 kg TOTAL
16 4.32 69.14
6.1.3 RHS Lattice Purlins 10 4.32 43.21
a) (25x25x2.5mm)
Upper Lp-1 96 0.20 19.20
16 5.11 81.76 ml on T-3 60 0.20 12.00
22 4.91 108.02 ml on T-2
17 5.11 86.87 ml on T-1 32 0.34 10.75
Lower LP-1 20 0.34 6.72
16 4.32 69.14 ml on T-3 1537.10
22 4.12 90.66 ml on T-2 1.77
17 4.22 71.76 ml on T-1 2714.90
Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


6.1.4 Lattice purlin to truss
connection Angle iron 36 1.50
162.00 a) size25x25x2.5mm,l=30mm 0.40
0.003
6.1.5 Bolts with Nuts 0.06
32.00 a)Dia16mm J bolt L=400mm 7850.00
16.00 a)Dia20mm J bolt L=400mm 508.68
b)Dia 12mm purlin to truss
162.00 connection bolt L=100mm
6.1.6 Metal Plates 2.00
24.00 a)2(200x200x6mm) 8.00
28.00 b)2(200x300x5mm) 4.00
0.00 c)2(200x105x5mm) 4.00
2.00 d)2(200x100x5mm) 4.00

6.2 STEEL STAIR CASE 4.00


2 6.00 6.2.1 a)RHS Post 130x130x3mm
11.96 8.00
143.56 kg TOTAL 16.00
16.00
6.2.2.C-Section channel beam&Tread
8 3.00 a)219x40x40x3mm 2 4.35
0.38 a)219x40x40x4mm (flight waste) 1.54
0.004 13.43
0.04 m3
7850.00 kg/m3
286.37 kg TOTAL 1.00

b)222x40x40x3mm
b) 222x40x40x3mm (arround landing)
1 26.72 L=2*7.36+8*1.5=26.72
0.38
0.003
0.03
0.03 m3
7850.00 kg/m3
240.38 kg TOTAL
Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


7.PLASTERING&POINTING
7.01apply three coats of Plastering
a)To internal wall surface 1 10.27
Ground floor 2.61 26.80
1 17.94 office 1 9.81
2.61 46.82 2.16 21.19

1 17.94 office 1 7.26


2.61 46.82 2.61 18.95

1 17.86 office 1 8.66


2.61 46.61 2.61 22.60

1 10.74 Store 1 9.81


2.61 28.03 2.16 21.19

1 10.76 Store 1 10.26


2.61 28.08 2.61 26.78

1 10.67 Store 1 9.81


2.61 27.85 2.16 21.19

2 21.21 seminar room 10 4.57


2.61 110.72 1.34 -61.24
4 1.77
2 31.65 work room 0.41 -2.90
2.61 165.21 3 2.74
1.57 -12.91
1 11.03 Store 2 1.57
2.61 28.79 2.54 -7.98
4 1.17
1 17.84 Aound stair case 2.74 -12.82
2.61 46.56 6 0.97
2.74 -15.95
1 22.09 office 6 0.87
2.61 57.65 2.74 -14.30
1 0.77
1 8.85 Janitary Room 2.54 -1.96
2.61 23.10 17 0.77
2.74 -35.87
1 91.07 lobby 6 0.77
2.61 237.69 1.80 -8.32
6 0.77
1 8.86 F.WC 1.35 -6.24
2.61 23.12 895.31

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH

1 17.94 office 1 22.09


2.61 46.82 2.61 57.65

1 17.94 office 1 14.67


2.61 46.82 2.61 38.29

1 17.86 office 1 9.05


2.61 46.61 2.61 23.62

1 10.74 Store 1 95.95


2.61 28.03 2.61 250.43

1 10.76 Store 1 17.84


2.61 28.08 2.61 46.56

1 10.67 Store 1 8.86


2.61 27.85 2.61 23.12

1 17.46 Server room 1 10.27


2.61 45.57 2.61 26.80

1 31.66 Language lab. 1 9.81


2.61 82.63 2.16 21.19

1 31.64 Comp. Room 1 7.26


2.61 82.58 2.61 18.95

1 17.61 Teachers rest room 1 8.66


2.61 45.96 2.61 22.60

1 32.02 Comp. Room 1 9.81


2.61 83.57 2.16 21.19

1 21.24 Language lab.


2.61 55.44 14 4.57
1.34 -85.73
1 21.23 Special purpose 3 1.77
2.61 55.41 0.41 -2.18
2 2.74
1 13.45 Computer & Accesary room 1.57 -8.60
2.61 35.10

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


1 0.77 DW2=770x2740mm 1 17.86
2.74 -2.11 2.61 46.61
1 1.41
1.61 -2.27 1 14.68
2 1.57 D1'=1570X2740mm 2.61 38.31
2.74 -8.60
4 1.17 D2=1170X2740mm 1 17.86
2.74 -12.82 2.61 46.61
8 0.97 D3=970X2740mm
2.74 -21.26 1 28.09
11 0.87 D4=870X2740mm 2.61 73.31
2.74 -26.22
2 0.87 D4'=870X2540mm 1 59.00
2.54 -4.42 2.61 153.99
13 0.77 D5=770X2740mm
2.74 -27.43 1 17.84
1 0.77 D5'=770X2540mm 2.61 46.56
2.54 -1.96
4 0.77 D6 = 770x1800 mm 1 8.86
1.80 -5.54 2.61 23.12
4 0.77 D6 = 770x1800 mm
1.35 -4.16 1 10.27
1047.60 m2 sub total 2.61 26.80

2nd floor 1 9.81


1 49.87 Assembly 2.16 21.19
2.61 130.16
1 7.26
1 21.22 Office 2.61 18.95
2.61 55.38
1 8.66
1 17.64 Office 2.61 22.60
2.61 46.04
1 9.81
1 31.66 Seminar Room 2.16 21.19
2.61 82.63

1 39.68 Seminar Room 12 4.57


2.61 103.56 1.34 -73.49

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


3 1.77 W2 = 1770 x 410 mm
0.41 -2.18 1 46.69
2 2.74 DW1 = 1570 x 2740 mm 3.09 144.27
1.57 -8.60
1 0.77 DW2=770x2740mm 1 8.29
2.74 -2.11 2.61 21.64
4 1.57 D1'=1570X2740mm 1 4.61
2.74 -17.21 1.39 6.41
7 1.17 D2'=1170X2740mm
2.74 -22.44 1 46.69
1 1.17 D2=1170X2740mm 2.91 135.87
2.74 -3.21 1 8.29
2 0.97 D3'=970X2540mm 2.61 21.64
2.54 -4.93 1 4.61
5 0.87 D4'=870X2540mm 1.39 6.41
2.54 -11.05
1 0.77 D5'=770X2540mm 22 4.57
2.54 -1.96 1.34 -134.72
5 0.77 D5=770X2740mm 1 4.41
2.74 -10.55 2.74 -12.08
4 0.77 D6 = 770x1800 mm 2 0.77
1.80 -5.54 2.74 -4.22
4 0.77 D6 = 770x1800 mm 1 1.42
1.35 -4.16 1.55 -2.20

789.64 m2 sub total 319.89

2732.55 m2 total

b)To external plastering 1 27.66


plastering on G+0 3.09 85.47
Front elevation
On Ground Floor 1 27.66
1 34.82 on axis D 3.09 85.47
3.09 107.59 1 9.22
1 6.24 Entrance 3.09 28.49
2.61 16.29 1 4.05
1 4.63 Entrance 2.61 10.57
2.81 13.01

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


On 2nd Floor
1 27.66 on axis A
3.09 85.47 1 13.83
1 9.22 on axis B 3.09 42.73
3.09
28.49 1 8.21
1 4.05 Around Fire Exit Area 3.09 25.37
2.61 10.57 1 4.61
Deduction 3.09 14.24
14 4.57 a) W1 = 4570 x 1340 mm 1 1.81
1.34 -85.73 2.61 4.72
10 1.77 b) W2 = 1770 x 410 mm 1 1.81
0.41 -7.26 1.39 2.52
2 0.87 D4'=870X2540mm
2.54 -4.42 1 10.02
2.91 29.16
m2 Total Rear External Plastering
237.12 1 4.61
Left elevation 2.91 13.42
On Ground Floor
1 13.83 on axis 2 1 1.57
3.09 42.73 2.54 -3.99
On 1st Floor 1 0.87
1 10.02 on axis 1 2.74 -2.38
3.09 30.96 125.79
1 4.61 on axis 2
3.09 14.24 2 14.63
On 2nd Floor 2.88 84.27
1 10.02 on axis 1 1 10.84
2.91 29.16 2.67 28.94
1 4.61 on axis 2 2/0.5 5.03
2.91 13.42 1.08 5.43
Deduction 2/0.5 4.21
1 1.57 D1=1570X2540mm 2.67 11.24
2.54 -3.99
126.53 Total Left External Plastering 2 13.83
0.65 -17.98
111.91

921.23

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


c) To concrete ceiling 18.18
Ground floor ceiling plastering 8.94
54.23 covered shade 18.97
48.72 covered shade 19.19
19.35 office 19.19
19.35 office 6.58
19.22 office 6.58
6.58 Store 6.51
6.58 Store 79.67
6.51 Store 17.03
26.78 seminar room 523.42

54.73 work room 1061.78


85.65 lobby
15.25 enterance
26.78 seminar room 1 13.83
54.73 work room 0.40 5.53
27.27 male and female WC, teachers WC 1 29.67
8.94 WC Corridor 0.20 5.93
4.89 Janitary Room 2 5.01
7.12 Store 0.40 4.01
17.03 Aound stair case 2 13.83
28.65 office 0.20 5.53
538.36 2 10.14
First floor ceiling plastering 0.40 8.11
54.73 Language lab. 1 6.22
18.02 Server room 0.51 3.17
54.73 Comp. Room 1 9.62
18.42 Teachers rest room 0.60 5.77
7.49 Balcony 1 5.41
54.73 Comp. Room 0.41 2.22
26.78 Language lab. 1 1.80
26.78 Special purpose 0.60 1.08
8.83 Computer & Accesary room 1 3.81
28.65 Language lab. 0.41 1.56
18.53 office
4.89 Tea preparation room

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


1 6.22 On axis 7 1 3.81
0.41 0.41 1.56
2.55 1 9.62
1 7.21 0.60 5.77
0.60 1 6.22
4.33 0.41 2.55
4 11.63 On axis 8 1 7.21
0.41 0.60 4.33
19.07 4 11.63
4 1.80 0.41 19.07
0.60 4 1.80
4.32 0.60 4.32
2 5.81 On axis 5 & 6 2 5.81
0.69 8.02 0.69 8.02
2 1.80
2 1.80 0.60 2.16
0.60 2.16 2 6.54
0.41 5.36
2 6.54 1 7.62
0.41 5.36 0.21 1.60
2 14.15 On axis 2 & 9 1 6.53
0.21 5.94 0.60 3.92
1 4.61 On Stair case 1 12.35
0.60 2.77 0.21 2.59
On 1st Floor 1 1.80
1 4.61 On axis D 0.60 1.08
0.40 1.84 1 4.61
1 38.89 0.60 2.77
0.20 7.78
2 5.01 On axis B 1 4.61
0.21 2.10 0.20 0.92
2 13.83 On axis A 1 4.61
0.21 5.81 0.20 0.92
2 10.14 On axis 1 & 10 196.50
0.40 8.11
1 6.22 On axis 3
0.51 3.17 14 2.61
1 5.41 0.20 7.31
0.41 2.22 24 2.61
1 1.80 0.20 12.53
0.60 1.08

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


16 2.61 On axis B
0.20 8.35 2 0.77
13 2.61 On axis A 0.45
0.20 6.79 -0.69
On 1st Floor 1 9.40
19 2.61 On axis D 0.45
0.20 9.92 4.23
29 2.61 On axis C
0.20 15.14 2 0.77
25 2.61 On axis B 0.45
0.20 13.05 -0.69
13 2.61 On axis A
0.20 1 9.46
6.79 0.45
On 2nd Floor 4.26
21 2.61 On axis D
0.20 2 0.77
10.96 0.45
20 2.61 On axis C -0.69
0.20 1 9.46
10.44 0.45
27 2.61 On axis B 4.26
0.20
14.09 2 0.77
18 2.61 On axis A 0.45
0.20 -0.69
9.40
Total Intermidiate Beam Plastering
124.76 1 9.46
321.26 m2 total 0.45
4.26
7.02 Two coat of plastering to
receive ceramic wall 2 0.77
1 9.46 F.WC 0.45
0.45 -0.69
4.26 1 9.46
Ddt 0.45
2 0.77 D6 = 770x1800 mm 4.26
0.45
-0.69 2 0.77
1 9.46 M.WC 0.45
0.45 -0.69
4.26 24.92

Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


8. FINISHING
8.01)200*200*20mmTerrazo tile flooring
54.20 m2 total

8.02) 260x30mm Terrazo Window sill 54.73


W1 = 4570 x 1340 mm 18.02
36 4.66 167.76 Ml 54.73
W2 = 1770 x 410 mm 18.42
10 1.86 18.60 Ml 7.49
DW2 54.73
2 1.44 2.88 Ml 26.78
189.24 Ml Total Window Sill 26.78
8.83
8.03) 150x150x6mm Ceramic 28.65
Wall Tile 18.53
=ditto item 7.02 4.89
24.92 M2 Total
8.94
8.04) 50mm thick Cement Sand 18.97
Screed 19.19
Ground floor 19.19
54.23 covered shade 6.58
48.72 covered shade 6.58
19.35 office 6.51
19.35 office 79.67
19.22 office 17.03
6.58 Store 505.24
6.58 Store
6.51 Store 134.93
26.78 seminar room 26.78
54.73 work room 7.49
85.65 lobby 18.42
15.25 enterance 54.73
26.78 seminar room 93.40
54.73 work room 19.03
27.27 male and female WC, teachers WC 12.47
8.94 WC Corridor 18.99
4.89 Janitary Room 38.81
7.12 Store 17.03
17.03 Aound stair case
28.65 office
538.36 63.66
505.75
1549.35

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


8.05)100mm thick Concrete
Pavement 2 2.32
1 102.67 0.73
1.20 123.20 3.39
1 16.82 4 0.69
0.87 14.63 1.55
1 5.81 4.27
1.60 9.30 2 2.08
147.13 Ml Total Concrete Pavement 1.53
8.06) 30x30x3mm angle iron 6.36
corner protection H=1.5 M
21.00 2 0.40
21.00 Pcs TOTAL 1.53
8.08) Half ditch concrete Dia=0.4M 1.22
121.62 3 0.60
121.62 Ml 1.53
2.75
-1 24.03 ddt ditch with metal grill 4 0.60
-24.03 Ml 1.13
2.71
97.59 Ml Total half ditch concrete 4 0.40
1.13
8.09) Ditto half ditch with metal gill 1.81
1 24.03 ditch with metal grill 8 0.60
24.03 Ml 0.93
4.46
24.03 Ml Total half ditch concrete 1 0.40
with metal grill 0.93
0.37
9.GLAZING 9 0.60
Windows 0.83
36 4.49 a) W1 = 4570 x 1340 mm 4.48
1.29 5 0.40
208.52 0.83
10 1.11 b) W2 = 1770 x 410 mm 1.66
0.57 16 0.60
6.33 0.73
Window Doors 7.01
4 2.32 DW1=1570x2740mm 3 0.40
4.20 0.73
38.98 0.88
295.20

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


10. PAINTING 8.85
10.01 apply three coats of painting 11.03
12.05
19.13
a)To internal wall surface 17.53
= item 7.01 a) 10.27
2732.55 m2 total
-2 1.57 -3.14
b)To external Painting -2 1.17 -2.34
= item 7.01 b) -3 0.97 -2.91
921.23 m2 total -3 0.87 -2.61
-10 0.77 -7.70
c)To exposed column&beam -2 0.77 -1.54
= item 7.01 d) -6 0.77 -4.62
321.26 m2 total -2 1.57 -3.14

d) To concrete ceiling 264.61


= item 7.01 c)
1061.78 m2 total 31.66
17.46
e)To 8mm thick chip wood ceiling 31.64
= item 7.01 a) 17.61
536.39 m2 total 12.86
32.02
21.24
21.23
f)100mm Heigh Plaster Skirting 13.45
Ground floor 22.09
17.94 office 14.67
17.94 office 9.05
17.86 office 17.94
10.74 Store 17.94
10.76 Store 17.86
10.67 Store 10.74
21.21 seminar room 10.76
31.65 work room 10.67
21.24 seminar room 12.05
31.65 work room 19.13
22.09 office 17.53

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


Deduction
1 1.57 -1.57 D1'
2 1.17 -2.34 D2
5 0.97 -4.85 D3
6 0.87 -5.22 D4
8 0.77 -6.16 D5
2 0.77 -1.54 D5'
4 0.77 -3.08 D6
1 4.41 -4.41 DW1
1 1.57 -1.57 DW2
348.86
2nd floor
49.87 Assembly
21.22 Office
12.86 Balcony
17.64 Office
31.66 Seminar Room
39.68 Seminar Room
17.86 Pool Office
14.68 Store
17.86 Office
28.09 Pool Office
12.05 Aound stair case
19.13 F.WC
17.53 M.WC
Deduction
2 1.57 -3.14 D1'
4 1.17 -4.68 D2'
1 0.97 -0.97 D3'
3 0.87 -2.61 D4'
4 0.77 -3.08 D5
2 0.77 -1.54 D5'
4 0.77 -3.08 D6
1 4.41 -4.41 DW1
2 1.57 -3.14 DW2
273.48
886.95 ml
88.70 Total m2

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


11. SANITARY INSTALATION
11.1.1 500x400mm Hand wash basins
15.00 with all accesary 0.00

11.1.2.Wash down Water closets


with all accessary
14.00 38.00
38.00
11.1.3 Urinals made of 80mm thick 18.00
reinforced concrete.size=1300x300 5.00
3.00 depth=350mm

11.1.4 Toilet paper


14.00 1.00
1.00
11.1.5 Crystal glass mirrors for toilet 1.00
hand wash basins 1.00
15.00

11.1.6 Soap holder 17.00


2.00
15.00

11.1.7 Floor drains


size=Dia.100mm 1 15.00 15.00
6.00 1 14.00 14.00
3 3.00 9.00
11.1.8 Wall mounted Fire hose 38.00

3.00
2.00
11.1.9 Kitchen sink with double bowl 5.00
size=1500x600mm 1.00
2.00

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


11.3.1internal uPVC(PN4)waste &
vent pipes
62.00 Dia.50mm
38.00 Dia.80mm
65.00 Dia.110mm

11.3.2vent caps made of rigid uPVC


2.00 dia.110mm
1.00

11.3.3.Clean outs
1.00 dia.110mm

8 9.80 78.40 11.3.4 uPVC downpipes


78.40 dia.110mm
1.00

11.4 apply pidifin 2k/equivalent


59.09 water proofing

12. ELECTRICAL WORK


12.1 Feeder Cables
12.1.15x16mm2 from power up to
16.00 MDB-SA 1.00
12.1.2.5x10mm2 formMDB-SA
8.00 up to SDB-SA1

12.1.3 5x6mm2 fromMDB-SA up to


10.00 SDB-SA2 226.00

12.2 Conduits and pipes


12.2.1 pvc pipe of 32mm diameter 37.00
15.00
12.2.2 pvc pipe of 50mm diameter 33.00
15.00
10.00

Contracter_________________________ Supervisor___________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL

No. LWH Description No. LWH


12.5.3 intermediate switch,774007+
3.00 774041 8.00
12.6 Scket outlet points
12.6.1 10-16A/1p Scket outlet points
87.00
12.6.2 20A/1p Scket outlet points 1.00
2.00
12.7 Extra Over Socket Points
12.7.1socket outlet of 10-16A/1p
43.00 774020+7740 2.00

12.7.2socket outlet of 10-16A/1p


44.00 twin ,774025+7740 235.00

2.00 12.7.3socket outlet of 20A/1p

60.00

12.8 Data/Telecom Points/Outlet


12.8.1 data/telphone points fed though 8.00
31.00 2x(twisted pair category 5EUTP cable

12.8.2 RJ 45 twin outlets type


31.00 LEGRAND 2(74213) 42.00

1.00 12.8.3 flush mounted DT box

12.9 Light fitting and lamp 8.00


12.9.1MODUS TU118K+1xT818w/
5.00 840lamp.

12.9.2MODUS TU136K+1xT836w/ 1.00


70.00 840lamp.

12.9.3MODUS TU236K+1xT836w/ 292.00


144.00 840lamp.

1.00

Contracter_________________________ Supervisor___________________
CTOR
ON PROJECT

page___1________

Description
1.07.Fill around foundation&building
m3 total pit excav.

fill around building

m3 total concrete F.pad


m3 total concrete F.column

m3 TOTAL

1.08.Fill under hard core


avg. d=0.1m

m3 TOTAL
1.09.Cart away

m3 site clear
m3 Bulk excav.in ordinay soil
m3 Bulk excav. In soft rock
m3 Bulk excav. In rock
m3 Fill around foundation & building

m3 pit excav.in ordinary soil depth


m3 pit excav.in soft rock depth
m3.Trench excav.in ordinary soil
m3 pit excav.in hard rock depth
m3 TOTAL

or___________________________
CTOR
ON PROJECT

page___2________

Description

b)under beam & floor slab


under GFB-1 on axis C

under GFB-1 on axis B

under GFB-4

under GFB-5

under GFB-6

under GFB-7

under floor slab use area of hard


core

Total # 2.01 (b)


or___________________________

CTOR
ON PROJECT

page___3________

Description
b/n axis C & D

m2

m2

m2
m2 TOTAL

C) under masonry

m2 TOTAL

2.02 Reinforced concrete C-25


a) in Footings

F2

m3

F2

m3

F3

m3

F4
m3 TOTAL

or___________________________

CTOR
ON PROJECT

page___4________

Description
GB4

m3

GB5

m3

GB6

m3

GB7

m3

GB

m3 STR 1
m3 TOTAL

d) in 100mm thick ground floor slab


b/n axis A & B

m2

m2
m2

or___________________________

CTOR
ON PROJECT

page___5________

Description
F3

m2

F4

m2
m2 TOTAL
b) in foundation column

m2

m2

m2

m2

m2

m2

m2

m2 TOTAL

C ) to gread Beams
GB1

m2
m2

or___________________________

CTOR
ON PROJECT

page___6________

Description

2.05.10x100mm Styrofoam expansion


to GFS-1

to GFS-2

to GFS-3

3. MASONRY WORK
3.01.400mm thick stone masonry
blow NGL
av.d=0.4m

m3 TOTAL

3.02.Ditto but abave NGL


av.d=0.2m
m3 TOTAL

or___________________________

CTOR
ON PROJECT

page___7________

Description
FB5 at 1st &2nd on axis 3,4,7 & 8

m3

FB6 at 1st &2nd on axis 5 & 6

m3

FB7 at 1st &2nd on axis 2 & 9

m3

FB8 at 1st &2nd on axis 5-6

m3
m3 TOTAL

C) In Roof Beams
RB1 on axis D

m3

RB2 on axis C
m3

RB3 on axis B

m3

or___________________________

CTOR
ON PROJECT

page___8________

Description
1.02 Rebbed slab for suspended
solid slab
1-2 /B-D & 9-10/B-D

2-3 /A-D,3-4 /A-D,4-5 /A-D,7-8 /A-D &


8-9/A-D

5-6 /B'-D

6-7 /B'-D

First Floor
1-2 /B-D & 9-10/B-D

2-3 /A-D,3-4 /A-D,4-5 /A-D,7-8 /A-D &


8-9/A-D

5-6 /B'-D

6-7 /B'-D
m3 TOTAL
1.03 FORM WORK
a) Elevation Column
C1,C2 &C3 at G+0 &G+1

m2
C1,& C2 G+2

m2
m2 TOTAL

or___________________________

CTOR
ON PROJECT

page___9________

Description

Internal Side Part


to Axes (6-7)/(A-B)
On axis 1 & 10

to all Internal beam column


connection

m2 TOTAL

c) To ROOF BEAMS
RB1 on axis D

m2
m2

m2
RB2 on axis C

m2

m2
RB1 on axis B

m2

m2

m2

or___________________________

CTOR
ON PROJECT

page___10________

Description
RB8 on axis 5 &6

m2

m2
m2 TOTAL

d) In 150mm thick suspended


solid slab

m2 TOTAL
1.04 Pre Cast Element
PCS TOTAL

or___________________________

CTOR
ON PROJECT

page___11________

Description
D5=770X2740mm

DW1=

a) W1 = 4570 x 1340 mm

b) W2 = 1770 x 410 mm

b) First Floor
on axis D
on axis C

on axis B

on axis A

b/n axis D&C

b/n axis B&C

b/n axis B&A

on axis 1

on axis 2

on axis 3

On axis 4

On axis 5,6

On axis 7

or___________________________

CTOR
ON PROJECT

page___12_________

Description
c) Second Floor
on axis D

on axis C

on axis B

on axis A

b/n axis D&C


b/n axis B&C

b/n axis B&A

on axis 1&10

on axis 2

On axis 4

On axis 5,6

On axis 7

On axis 8

On axis 9

b/n axis 3 & 4

b/n axis 6 & 7

b/n axis 7 & 8

On axis D ( For Guard Rail)

or___________________________

CTOR
ON PROJECT

page___13_________

Description

b/n axis 2 & 3, 3 & 4, 4 & 5 , 7 & 8

b/n axis 6 & 7 & 3& 4


First Floor
b/n axis C&B

b/n axis A & B

b/n axis 2 & 3, 3 & 4, 4 & 5 , 7 & 8

b/n axis 6 & 7 & 3& 4

Second Floor
b/n axis C&B

b/n axis A & B

b/n axis 6 & 7

Deduction
D5=770X2740mm

D6=770X1800mm

Total # 2.02 = 204.68M2

Louver wall

m2 TOTAL

or___________________________
CTOR
ON PROJECT

page___14_________

Description

3.03. wire mesh ventilation

m2 TOTAL

4.CARPENTRY&JONERY
4.01 fix 8mm thick chip
wood ceiling semminar room
Assembly

Office

Balcony

Office

Seminar Room

Seminar Room

Pool Office

Store

WC

Office

Pool Office

Circulation

m2 Total ceiling area


or___________________________

CTOR
ON PROJECT

page___15_________

Description

6.STEEL STRUCTURE
6.1 RHS TRUSS
6.1.1 Upper and lower chord

a) (60x60x3mm)
Upper
on T-2
on T-3
Lower
on T-2
on T-3
Vertical(60x60x3mm)
on T-2
on T-3
total ml
kg/ml
kg TOTAL

b)40x40x3mm
Upper
on T-1
on T-1
on T-3
on T-4
on T-4
on T-5
Lower 40x40x3mm
on T-1
on T-4
on T-5
total ml
kg/ml
kg TOTAL
or___________________________

CTOR
ON PROJECT

page____16_______

Description

Vertical LP-1
ml on T-3
ml on T-2
ml on T-1
Diagonal LP-1
ml on T-3
ml on T-2
ml on T-1

Upper Lp-2
ml on T-3
ml on T-5
Lower LP-2
ml on T-3
ml on T-5
Vertical LP-2
ml on T-3
ml on T-5
Diagonal LP-2
ml on T-3
ml on T-5
Upper Lp-3
ml on T-1
ml on T-1
Lower LP-3
ml on T-1
ml on T-1
Vertical LP-3
ml on T-1
ml on T-1
Diagonal LP-3
ml on T-1
ml on T-1
total ml
kg/ml
kg TOTAL
or___________________________

CTOR
ON PROJECT

page____17_______

Description

c) 300x60x40x3mm(trade)

kg/m3
kg TOTAL

6.2.3. Metal Plates


a)2(250x250x4mm)
b)2(400x250x5mm)
c)2(150x60x4mm)
d)2(50x60x4mm)
e)2(120x60x4mm)
6.2.3Solid Metal plats
a)2(200x200x4mm)
6.2.4 Bolts With Nuts
a)Dia20mm J bolt L=400mm
b)Dia16mm J bolt L=300mm
b)Dia20mm J bolt L=250mm
6.2.64mm thick SheetMetal

m2 TOTAL

6.3. Fireescape Spiral stair case


Pcs TOTAL
or___________________________

CTOR
ON PROJECT

page___18_________

Description

M.WC

T.WC

Ddt
W1 = 4570 x 1340 mm

W2 = 1770 x 410 mm

DW1 = 1570 x 2740 mm

D1=1570X2540mm

D2=1170X2740mm

D3=970X2740mm

D4=870X2740mm
D5'=770X2540mm

D5=770X2740mm

D6 = 770x1800 mm

D6 = 770x1800 mm

m2 sub total

or___________________________

CTOR
ON PROJECT

page___19________

Description

Language lab.

office

Tea preparation room

Corridor

Aound stair case

F.WC

M.WC
Ddt
W1 = 4570 x 1340 mm

W2 = 1770 x 410 mm

DW1 = 1570 x 2740 mm

or___________________________

CTOR
ON PROJECT

page___20________

Description
Office Pool

Store

Office

Office Pool

Corridor

Aound stair case

F.WC
M.WC

Ddt
W1 = 4570 x 1340 mm

or___________________________

CTOR
ON PROJECT

page___21________

Description
On 1st Floor
on axis D

Balcony

Balcony

On 2nd Floor
on axis D

Balcony

Balcony

Deduction
a) W1 = 4570 x 1340 mm

DW1=1574x2740mm

DW2=1774x2740mm

Total Front External Plastering

Rear elevation
On Ground Floor
on axis A

On 1st Floor
on axis A

on axis B

Around Fire Exit Area

or___________________________

CTOR
ON PROJECT

page___22________

Description
Right Elevation
On Ground Floor
on axis 9

On 1st Floor
on axis 10

on axis 9

Balcony

Balcony
On 2nd Floor
on axis 10

on axis 9

Deduction
D1=1570X2540mm

D4'=870X2540mm

Total Right External Plastering


On parapet Wall
On axis B

on axis 1 & 10

on axis 2 & 8

on axis 4 & 7

Deduction
On axis A
Louvered Wall
Total Parapet External Plastering

m2 total external plastering

or___________________________

CTOR
ON PROJECT

page___23________

Description
male and female WC
WC Corridor
office
office
office
Store
Store
Store
Corridor
Aound stair case

Total # 7.01(c) = 1,066.18M2

d)To exposed column&beam


On axis D

On axis B

On axis A

On axis 1 & 10

On axis 3

On axis 4

or___________________________

CTOR
ON PROJECT

page___24________

Description
On axis 4

On axis 7
On axis 8

On axis 5 & 6

On axis 2

On axis 9

On Stair case

On 2nd Floor
On axis D

On axis B

Column
On Ground Floor
On axis D

On axis C

or___________________________

CTOR
ON PROJECT

page___25________

Description
Ddt
D6 = 770x1800 mm

T.WC

Ddt
D6 = 770x1800 mm

1st floor
F.WC

Ddt
D6 = 770x1800 mm

M.WC

Ddt
D6 = 770x1800 mm

2nd floor

F.WC

Ddt
D6 = 770x1800 mm

M.WC

Ddt
D6 = 770x1800 mm

Total # 7.02 = 24.92M2

or___________________________
CTOR
ON PROJECT

page____26_______

Description

1st floor
Language lab.
Server room
Comp. Room
Teachers rest room
Balcony
Comp. Room
Language lab.
Special purpose
Computer & Accesary room
Language lab.
office
Tea preparation room

WC Corridor
office
office
office
Store
Store
Store
Corridor
Aound stair case

2nd floor
Assembly
Office
Balcony
Office
Seminar Room
Seminar Room
Pool Office
Store
Office
Pool Office
Aound stair case
Corridor

Total # 8.04 = 1,549.35

or___________________________

CTOR
ON PROJECT

page____27_______

Description
DW2=770x2740mm

MD1

Wooden doors
D1=1570X2540mm

D1'=1570X2740mm

D2=1170X2740mm

D2'=1170X2740mm

D3=970X2740mm

D3'=970X2540mm

D4=870X2740mm
D4'=870X2540mm

D5=770X2740mm

D5'=770X2540mm

m2 total

or___________________________

CTOR
ON PROJECT

page____28_______

Description
Janitary Room
Store
Aound stair case
F.WC
M.WC
T.WC
Deduction
D1
D2
D3
D4
D5
D5'
D6
DW1

1st floor
Language lab.
Server room
Comp. Room
Teachers rest room
Balcony
Comp. Room
Language lab.
Special purpose
Computer & Accesary room
Language lab.
office
Tea preparation room
office
office
office
Store
Store
Store
Aound stair case
F.WC
M.WC

or___________________________

CTOR
ON PROJECT

page____29_______

Description
or___________________________

CTOR
ON PROJECT

page____30_______

Description
11.1.10 ditto to item 11.1.9
Janitor sjnk

11.2.1 PPR pipe (PN10) to internal


water distribution
interna dia.15mm
interna dia.20mm
interna dia.25mm
interna dia.32mm

11.2.2 ditto but installed in walls


interna dia.15mm
interna dia.20mm
interna dia.25mm
interna dia.32mm
11.2.3 ditto item no.2.1 but
galvanized steel pipe for fire fighting
i) dia.32mm
i) dia.50mm

11.2.4 Chrome service valves


internal dia.15mm
For HWB
For turkish
For Urinal
Pcs

11.2.5 Bronze gate valves


a) dia.20mm
b) dia.32mm
c) dia.50mm

or___________________________

CTOR
ON PROJECT

page____31_______

Description
12.3. Distribution Board
12.3.1flush mounting distribution
board,MDB-SA
1pcs main ACB of 63A/3p
1pcs ACB of 32A/3p
1 pcs ACB of 25A/3p
4 pcs ACB of 16A/1p
10 pcs ACB of 10A/1p
25% resrve pitch

12.3.2flush mounting distribution


board,SDB-SA1
1pcs main ACB of 32A/3p
1 pcs ACB of 20A/1p
13 pcs ACB of 16A/1p
9 pcs ACB of 10A/1p
25% resrve pitch

12.3.3 flush mounting distribution


board,SDB-SA2
1pcs main ACB of 25A/3p
1 pcs ACB of 20A/1p
6 pcs ACB of 16A/1p
9 pcs ACB of 10A/1p
25% resrve pitch

12.4 Light Points


12.4.1Flush mounted light points fed
through pvc insulated conductors of
3x2.5mm2 inside pvc conduitsof 16
12.5 Extra Over Light Points
12.5.1 single switch,774001+774041

12.5.2 2gang single switch,774005+


774042
12.5.3 two-wayswitch,774006+
774041

or___________________________

CTOR
ON PROJECT

page____32_______

Description
12.9.4MODUS TU136K+
RFTUB136+1xT836w/840lamp.
12.10. Low voltage system earthing
12.10.1 Low voltage system earthing
1x16mm2(16m) bare copper
Conductor

12.11Lightning Arrester system


12.11.1 air termination circular
galvanized steel rod of up to 1m

12.11.2.1x50mm sq.circular bar


galvanized steel rod for roof conduct

12.11.3.1x50mm sq.circular bar


galvanized steel rod down conductot
from roof bond to test junction box

12.11.4 Testing junction boxes at


1.5m above ground level

12.11.5 30x3.5mm bargalvanized


steel tape conductor from testing
junction box to earth rod

12.11.6 1500mm long and 50x50x3


mm x-head galvanized steel earth rod
rod

12.11.7 Bonding materials for down


conductor with galvanized steel
air termination network

12.11.8 30x3.5mm galvanized


steel ring earth termination network
12.Manhole
12.12.1 Manhole inbrick or masonry
600x600x700mm

or___________________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___1_________
No of Bars
Bar Dia.
Loction No Shape Mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
Sub structure
F1 1 10 1.80 18.00 8.00 144.00 259.20
F2 2 12 2.40 18.00 14.00 252.00 604.80
F3 3 12 2.80 26.00 16.00 416.00 1164.80
F4 4 10 0.90 10.00 2.00 20.00 18.00

FC1 20 2.90 8.00 6.00 48.00


ST-1 6 1.00 8.00 6.00 48.00 48.00

FC2 20 2.90 10.00 29.00 290.00


ST-1 6 1.00 8.00 29.00 232.00 232.00

FC3 20 2.90 8.00 3.00 24.00


ST-1 6 1.00 8.00 3.00 24.00 24.00

FC4 14 1.40 4.00 2.00 8.00


ST-1 6 1.00 8.00 2.00 16.00 16.00

TOTAL LENGTH 320.00 0.00 277.20 1769.60


Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 71.04 0.00 171.03 1571.40

Contracor: _______________________ Supervisor: ________________________


Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___2_________

No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
GFB1 14 8.10 3.00 3.00 9.00
axis B,C & D 14 10.40 9.00 3.00 27.00
14 8.10 3.00 3.00 9.00
14 5.50 3.00 3.00 9.00
14 10.00 9.00 3.00 27.00
14 10.30 3.00 3.00 9.00
ST 8 1.40 207.00 3.00 621.00 869.40

GFB2 14 8.10 3.00 2.00 6.00


axis A 14 8.10 3.00 2.00 6.00
14 5.50 3.00 2.00 6.00
14 10.30 3.00 2.00 6.00
ST 8 1.40 69.00 2.00 138.00 193.20

GFB3 14 11.85 3.00 2.00 6.00


axis 1&10 14 11.85 3.00 2.00 6.00
ST 8 1.40 51.00 2.00 102.00 142.80
TOTAL LENGTH 0.00 1205.40 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 476.13 0.00 0.00

Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___3_________
No of Bars
Bar Dia.
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
GFB4 14 8.80 3.00 4.00 12.00
axis 3,4,7, & 8 14 7.30 3.00 4.00 12.00
14 6.60 3.00 4.00 12.00
14 9.20 3.00 4.00 12.00
ST 8 1.40 67.00 4.00 268.00 375.20

GFB5 14 9.60 3.00 2.00 6.00


axis 5 & 6 14 7.30 3.00 2.00 6.00
14 7.30 3.00 2.00 6.00
14 9.20 3.00 2.00 6.00
ST 8 1.40 69.00 2.00 138.00 193.20

GFB6 14 8.90 3.00 2.00 6.00


axis 2 & 9 14 8.00 3.00 2.00 6.00
14 6.60 3.00 2.00 6.00
14 9.90 3.00 2.00 6.00
ST 8 1.40 71.00 2.00 142.00 198.80

GFB7 14 5.80 3.00 1.00 3.00


axis 5-6 14 5.80 3.00 1.00 3.00
ST 8 1.40 23.00 1.00 23.00 32.20

GFB-STR 1 12 5.05 3.00 1.00 3.00 15.15


12 5.05 3.00 1.00 3.00 15.15
ST 1.10 3.00 1.00 3.00 3.30
TOTAL LENGTH 0.00 802.70 0.00 30.30
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 317.07 0.00 26.91

Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___4_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
GFS1 8 4.35 16.00 6.00 96.00 417.60
8 3.80 18.00 6.00 108.00 410.40
GFS2 8 4.35 16.00 9.00 144.00 626.40
8 3.75 19.00 9.00 171.00 641.25
GFS3 8 4.35 23.00 9.00 207.00 900.45
8 5.45 19.00 9.00 171.00 931.95
GFS4 8 4.35 5.00 1.00 5.00 21.75
8 1.10 19.00 1.00 19.00 20.90
TOTAL LENGTH 0.00 3970.70 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 1568.43 0.00 0.00
GRAND TOTAL WEIGTH In Kg 71.04 2361.63 171.03 1598.31
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___5_________
No of Bars
Bar Dia.
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
Super structure
C1 20 4.00 8.00 6.00 48.00
6 1.20 14.00 6.00 84.00 100.80
C2 20 4.00 10.00 29.00 290.00
6 1.20 14.00 29.00 406.00 487.20
C3 20 4.00 8.00 3.00 24.00
6 1.20 14.00 3.00 42.00 50.40

on 1st Floor
C1 20 4.00 8.00 6.00 48.00
6 1.20 14.00 6.00 84.00 100.80
C2 20 4.00 10.00 29.00 290.00
6 1.20 14.00 29.00 406.00 487.20
C3 20 3.20 8.00 3.00 24.00
6 1.20 14.00 3.00 42.00 50.40
on 2nd Floor
C1 20 3.00 6.00 6.00 36.00
6 1.20 14.00 6.00 84.00 100.80
C2 20 3.00 6.00 29.00 174.00
6 1.20 14.00 29.00 406.00 487.20
TOTAL LENGTH 1864.80 0.00 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 413.99 0.00 0.00 0.00

Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___6_________

No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
FB1 14 8.10 2.00 2.00 4.00
14 10.40 6.00 2.00 12.00
14 8.10 2.00 2.00 4.00
14 5.50 2.00 2.00 4.00
14 10.00 6.00 2.00 12.00
14 10.30 2.00 2.00 4.00
stirup 8 1.36 207.00 2.00 414.00 563.04

FB2 14 5.70 2.00 4.00 8.00


14 5.70 2.00 4.00 8.00
stirup 8 1.36 23.00 4.00 92.00 125.12

FB3 14 8.10 2.00 4.00 8.00


14 8.10 2.00 4.00 8.00
14 5.50 2.00 4.00 8.00
14 10.30 2.00 4.00 8.00
stirup 8 1.36 69.00 4.00 276.00 375.36

TOTAL LENGTH 0.00 1063.52 0.00 0.00


Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 420.09 0.00 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___7_________
No of Bars
Bar Dia.
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
FB4 14 9.50 3.00 4.00 12.00
14 3.00 4.00 4.00 16.00
16 3.20 3.00 4.00 12.00
16 3.40 4.00 4.00 16.00
16 7.30 4.00 4.00 16.00
14 4.90 3.00 4.00 12.00
stirup 8 1.36 32.00 4.00 128.00 174.08
10 1.36 19.00 4.00 76.00 103.36
8 0.25 15.00 4.00 60.00 15.00

FB2' 14 5.70 2.00 2.00 4.00


14 5.70 2.00 2.00 4.00
stirup 8 1.36 23.00 2.00 46.00 62.56
TOTAL LENGTH 0.00 251.64 103.36 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 99.40 63.77 0.00

Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___8_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
FB 5 16 8.90 4.00 8.00 32.00
16 8.10 4.00 8.00 32.00
20 2.40 2.00 8.00 16.00
20 3.40 4.00 8.00 32.00
20 2.80 3.00 8.00 24.00
16 2.40 1.00 8.00 8.00
20 6.60 4.00 8.00 32.00
16 9.20 3.00 8.00 24.00
stirup 10 1.36 67.00 8.00 536.00 728.96
FB 6 16 9.60 4.00 4.00 16.00
16 7.30 4.00 4.00 16.00
20 3.20 2.00 4.00 8.00
20 3.40 4.00 4.00 16.00
20 2.80 2.00 4.00 8.00
20 7.30 4.00 4.00 16.00
16 9.20 3.00 4.00 12.00
stirup 8 1.36 71.00 4.00 284.00 386.24
TOTAL LENGTH 0.00 386.24 728.96 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 152.56 449.77 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___9_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
FB 7 16 8.90 4.00 4.00 16.00
16 8.00 4.00 4.00 16.00
20 2.40 2.00 4.00 8.00
20 3.40 3.00 4.00 12.00
20 2.80 2.00 4.00 8.00
20 6.60 4.00 4.00 16.00
16 10.00 3.00 4.00 12.00
stirup 10 1.36 71.00 4.00 284.00 386.24

FB8 14 5.75 2.00 2.00 4.00


14 5.75 2.00 2.00 4.00
stirup 8 1.36 23.00 2.00 46.00 62.56
TOTAL LENGTH 0.00 62.56 386.24 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 24.71 238.31 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___10_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
RB1 14 7.90 2.00 1.00 2.00
14 10.40 6.00 1.00 6.00
14 7.90 2.00 1.00 2.00
14 10.10 2.00 1.00 2.00
14 10.00 6.00 1.00 6.00
14 5.30 2.00 1.00 2.00
Stirup 8 1.00 207.00 1.00 207.00 207.00
TOTAL LENGTH 0.00 207.00 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 81.77 0.00 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___11_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
RB2 14 7.90 2.00 1.00 2.00
14 5.60 2.00 1.00 2.00
14 7.90 2.00 1.00 2.00
14 10.10 2.00 1.00 2.00
14 10.10 2.00 1.00 2.00
Stirup 8 1.00 92.00 1.00 92.00 92.00

RB3 14 7.90 2.00 2.00 4.00


14 5.60 2.00 2.00 4.00
14 7.90 2.00 2.00 4.00
14 10.10 2.00 2.00 4.00
14 10.10 2.00 2.00 4.00
Stirup 8 1.00 92.00 2.00 184.00 184.00
TOTAL LENGTH 0.00 276.00 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 109.02 0.00 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___12_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
RB4 14 7.90 2.00 1.00 2.00
14 10.40 4.00 1.00 4.00
14 7.90 2.00 1.00 2.00
14 10.10 2.00 1.00 2.00
14 10.00 4.00 1.00 4.00
14 5.30 2.00 1.00 2.00
Stirup 8 1.00 161.00 1.00 161.00 161.00

RB 5 14 11.45 2.00 2.00 4.00


14 11.45 2.00 2.00 4.00
Stirup 8 1.00 51.00 2.00 102.00 102.00

RB 6 14 5.65 2.00 2.00 4.00


14 5.65 2.00 2.00 4.00
Stirup 8 1.00 23.00 2.00 46.00 46.00
RB 7 14 4.95 2.00 2.00 4.00
14 4.95 2.00 2.00 4.00
Stirup 8 1.00 19.00 2.00 38.00 38.00
TOTAL LENGTH 0.00 347.00 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 137.07 0.00 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___13_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
RB 8 14 7.25 2.00 2.00 4.00
14 7.25 2.00 2.00 4.00
Stirup 8 1.00 32.00 2.00 64.00 64.00

mesh 6 14.23 48.00 2.00 96.00 1366.08


6 10.02 32.00 2.00 64.00 641.28
6 14.23 32.00 2.00 64.00 910.72
6 10.02 32.00 2.00 64.00 641.28
6 1.52 16.00 2.00 32.00 48.64
6 43.29 34.00 2.00 68.00 2943.72
6 10.12 14.00 2.00 28.00 283.36
6 4.61 6.00 2.00 12.00 55.32
6 9.42 14.00 2.00 28.00 263.76
1 10 5.88 26.00 2.00 52.00 305.76
2 8 6.48 27.00 2.00 54.00 349.92
3 10 2.80 36.00 2.00 72.00 201.60
4 10 3.20 25.00 2.00 50.00 160.00

TOTAL LENGTH 7154.16 413.92 667.36 0.00


Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 1588.22 163.50 411.76 0.00
Contracor: _______________________ Supervisor: ________________________

Daniel Zegeye GENERAL CONTRACTOR


ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___14_________
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
Negative bars 14 2.00 34.00 2.00 68.00
14 2.00 16.00 2.00 32.00
14 2.00 5.00 2.00 10.00
precast to precsat connection 12 3.20 272.00 2.00 544.00 1740.80
12 3.20 32.00 2.00 64.00 204.80
12 3.20 16.00 2.00 32.00 102.40
12 3.20 12.00 2.00 24.00 76.80
TOTAL LENGTH 0.00 0.00 0.00 2124.80
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 0.00 0.00 0.00 1886.82
GRAND TOTAL WEIGTH In Kg 2002.21 1188.11 1163.61 1886.82
Contracor: _______________________ Supervisor: ________________________
age___1_________

14.00 16.00 20.00

139.20

841.00

69.60

11.20

0.00 0.00 1061.00


1.209 1.579 2.467
0.00 0.00 2617.49
age___2_________

14.00 16.00 20.00


72.90
280.80
72.90
49.50
270.00
92.70

48.60
48.60
33.00
61.80

71.10
71.10
1173.00 0.00 0.00
1.209 1.579 2.467
1418.16 0.00 0.00

age___3_________

14.00 16.00 20.00


105.60
87.60
79.20
110.40

57.60
43.80
43.80
55.20

53.40
48.00
39.60
59.40

17.40
17.40

818.40 0.00 0.00


1.209 1.579 2.467
989.45 0.00 0.00

age___4_________

14.00 16.00 20.00


0.00 0.00 0.00
1.209 1.579 2.467
0.00 0.00 0.00
2407.60 0.00 2617.49

age___5_________

14.00 16.00 20.00

192.00

1160.00

96.00

192.00

1160.00

76.80

108.00
522.00

0.00 0.00 3506.80


1.209 1.579 2.467
0.00 0.00 8651.28

age___6_________

14.00 16.00 20.00


32.40
124.80
32.40
22.00
120.00
41.20

45.60
45.60

64.80
64.80
44.00
82.40

720.00 0.00 0.00


1.209 1.579 2.467
870.48 0.00 0.00

age___7_________

14.00 16.00 20.00


114.00
48.00
38.40
54.40
116.80
58.80

22.80
22.80
266.40 209.60 0.00
1.209 1.579 2.467
322.08 330.96 0.00

age___8_________

14.00 16.00 20.00


284.80
259.20
38.40
108.80
67.20
19.20
211.20
220.80

153.60
116.80
25.60
54.40
22.40
116.80
110.40

0.00 1164.80 644.80


1.209 1.579 2.467
0.00 1839.22 1590.72

age___9_________

14.00 16.00 20.00


142.40
128.00
19.20
40.80
22.40
105.60
120.00

23.00
23.00
46.00 390.40 188.00
1.209 1.579 2.467
55.61 616.44 463.80

ge___10_________

14.00 16.00 20.00


15.80
62.40
15.80
20.20
60.00
10.60
184.80 0.00 0.00
1.209 1.579 2.467
223.42 0.00 0.00

ge___11_________

14.00 16.00 20.00


15.80
11.20
15.80
20.20
20.20

31.60
22.40
31.60
40.40
40.40
249.60 0.00 0.00
1.209 1.579 2.467
301.77 0.00 0.00

ge___12_________

14.00 16.00 20.00


15.80
41.60
15.80
20.20
40.00
10.60

45.80
45.80

22.60
22.60
19.80
19.80

320.40 0.00 0.00


1.209 1.579 2.467
387.36 0.00 0.00

ge___13_________

14.00 16.00 20.00


29.00
29.00
58.00 0.00 0.00
1.209 1.579 2.467
70.12 0.00 0.00

ge___14_________

14.00 16.00 20.00


136.00
64.00
20.00
220.00 0.00 0.00
1.209 1.579 2.467
265.98 0.00 0.00
2496.83 2786.62 10705.79
DANIEL ZEGEYE B.CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRACTION PROJECT
EARTH WORK &MEASUREMENT
Block : SEM-156 Takeoff Sheet No:FINAL Page No: 1

Quntity of earth excavation in cubic meter in M3

Depth of bulk excavation


Depth from profile board

Depth from profile board

Ordinary soli excavation

Ordinary soil excavation


to the bottom of the pit
Depth from profil board

Soft rock excavation up


(up to 1.5m from RGL)
to reduced GL in meter

Rock excavation up to
between 1.5m & 3.0m

between 1.5m & 3.0m

between 1.5m & 3.0m

between 1.5m & 3.0m


Area of pit bottom in
Soft rock excavation

Soft rock excavation

Soft rock excavation


to 1.5m from
to 1.5m from RGL

Rock excavation up

excavation between
excavation in meter

between 1.5m &


to 1.5m from RGL
Total depth of pit

excavation (up to
1.5m from RGL)
Rock excavation

Rock excavation
to NGL in meter

1.5m from RGL

3.0m from RGL


1.5m & 3.0m
Ordinary soli

Ordinary soil
square meter
in meter

from RGL

from RGL

from RGL
Item No

in meter

RGL
Location

up
1 1B 0.19 1.10 2.40 0.91 1.30 0.20 0.60 0.50 3.61 0.72 2.17 1.80
2 1C 0.67 1.10 2.40 0.43 1.30 0.20 0.40 0.70 4.84 0.97 1.94 3.39
3 1D 0.80 1.10 2.40 0.30 1.30 0.40 0.20 0.70 3.61 1.44 0.72 2.53
4 2A 0.00 1.10 2.30 1.10 1.20 0.30 0.90 3.61 0.00 1.08 3.25
5 2B 0.40 1.10 2.30 0.70 1.20 0.45 0.75 6.25 0.00 2.81 4.69
6 2C 0.68 1.10 2.30 0.42 1.20 0.40 0.80 6.25 0.00 2.50 5.00
7 2D 0.76 1.10 2.30 0.34 1.20 0.40 0.10 0.70 4.84 1.94 0.48 3.39
8 3A 0.06 1.10 2.30 1.04 1.20 0.20 1.00 4.84 0.00 0.97 4.84
9 3B 0.30 1.10 2.30 0.80 1.20 0.20 1.00 6.25 0.00 1.25 6.25
10 3C 0.70 1.10 2.30 0.40 1.20 0.20 1.00 6.25 0.00 1.25 6.25
11 3D 0.73 1.10 2.40 0.37 1.30 0.35 0.15 0.80 4.84 1.69 0.73 3.87
12 4A 0.12 1.10 2.30 0.98 1.20 0.20 1.00 4.84 0.00 0.97 4.84
13 4B 0.38 1.10 2.30 0.72 1.20 0.20 1.00 6.25 0.00 1.25 6.25
14 4C 0.70 1.10 2.30 0.40 1.20 0.20 1.00 6.25 0.00 1.25 6.25
15 4D 0.70 1.10 2.40 0.40 1.30 0.30 0.00 1.00 4.84 1.45 0.00 4.84
16 5A 0.19 1.10 2.30 0.91 1.20 0.20 1.00 3.61 0.00 0.72 3.61
17 5B 0.38 1.10 2.20 0.72 1.10 0.60 0.50 6.25 0.00 3.75 3.13
18 5C 0.63 1.10 2.30 0.47 1.20 0.70 0.50 6.25 0.00 4.38 3.12
19 5D 0.50 1.10 2.30 0.60 1.20 0.40 0.30 0.50 4.84 1.94 1.45 2.42
20 STR1 F4 0.30 1.10 2.10 0.80 1.00 0.40 0.30 0.30 1.44 0.58 0.43 0.43
21 STR1 F4 0.30 1.10 2.20 0.80 1.10 0.40 0.30 0.40 1.44 0.58 0.43 0.58

13.61 Total Pit excavation A


Contractor_________________________ Consultant_____________________ HDPo office Eng._____________________
Daniel Zegeye B.C SE-M1-156 Total

foot wash,
Super hand wash
Sub structure structure Precast and washing Total
(kg) (kg) beam(kg) basin(kg) (kg)
Dia.6mm plain bar 71.04 2002.21 2933.26 5006.51
Dia.8mm deformed bar 2361.63 1188.11 0.00 3549.74
Dia.10mm deformed bar 171.03 1163.11 0.00 1334.14
Dia.12mm deformed bar 1598.31 1886.82 1827.20 5312.33
Dia.14mm deformed bar 2407.60 2511.33 4590.47 9509.40
Dia.16mm deformed bar 0.00 2786.62 0.00 2786.62
Dia.20mm deformed bar 2617.49 10705.79 0.00 13323.28

Daniel Zegeye B.C Dedction of material from final payment


Purchasin
g unit Transport
price Vat unit
up to 5% wastage Total qty Unit (Birr) (Birr) cost(Birr)
Cement 1420 Qtl 177.1739 26.576087 19.9
Cement 1400 Qtl 226.087 33.9130435 33.55
Cement 125 Qtl 173.913 26.0869565 44.85
Dia.6mm plain bar 5256.84 kg 8.6957 1.30434783 1.30
Dia.8mm deformed bar 3555.00 kg 8.6957 1.30434783 1.30
Dia.10mm deformed bar 1400.85 kg 8.6957 1.30434783 0.37
Dia.12mm deformed bar 5577.95 kg 8.6957 1.30434783 0.37
Dia.14mm deformed bar 9525.12 kg 8.6957 1.30434783 0.37
Dia.14mm deformed bar 459.75 kg 22.95652 3.44347826 1.05
Dia.16mm deformed bar 2838.41 kg 8.6957 1.30434783 0.37
Dia.20mm deformed bar 13336.60 kg 17.7504 2.66256522 1.30
Total dedction amount (Birr)
Bulk
purchasin
g unit Transport
price Vat unit
In excess of 5% wastage Total qty Unit (Birr) (Birr) cost(Birr)
Cement
Dia.6mm plain bar 34.16 kg 8.6957 1.30434783 1.30
Dia.8mm deformed bar
Dia.10mm deformed bar 72.55 kg 8.6957 1.30434783 0.37
Dia.12mm deformed bar 176.29 kg 8.6957 1.30434783 0.37
Dia.14mm deformed bar 108.78 kg 22.95652 3.44347826 1.05
Dia.16mm deformed bar kg 8.6957 1.30434783 0.37
Dia.20mm deformed bar
Total dedction amount (Birr)
Grand Total dedction amount (Birr)
Delivered Delivered
by by Permitted
logistics Unit weight logistics 5% In Excess of 5
(Berga) (kg/ml) (kg) Difference wastage % wastage
5291.00 284.49 250.3255 34.16
750 0.395 3555 5.26 177.487 -172.23
199 0.617 1473.396 139.26 66.707 72.55
540 0.888 5754.24 441.91 265.6165 176.29
695.73 1.209 10093.65 584.25 475.47 108.78
149.8 1.579 2838.41 51.79 139.331 -87.54
450.5 2.467 13336.6 13.32 666.164 -652.84

SE-M1-156

Loading Total unit


unit cost Unloading unit cost Total amount
(Birr) cost (Birr) (Birr) (Birr)
2 225.650 320423.00
2 295.550 413770.00
2 246.850 30856.25
0.03 0.025 11.355 59691.42
0.03 0.025 11.355 40367.03
0.03 0.025 10.425 14603.86
0.03 0.025 10.425 58150.13
0.03 0.025 10.425 99299.38
0.025 27.475 12631.63
0.03 0.025 10.425 29590.42
0.025 21.738 289911.01
1,369,294.13

Loading Total unit


unit cost Unloading unit cost Amount 10% Total amount
(Birr) cost (Birr) (Birr) (Birr) Overhead (Birr)

0.03 0.025 11.355 387.89 38.79 426.68

0.03 0.025 10.425 756.33 75.63 831.97


0.03 0.025 10.425 1837.82 183.78 2021.61
0.025 27.475 2988.73 298.87 3287.60
0.03 0.025 10.425 0.00 0.00 0.00

6,567.85
1,375,861.98