SE-M1 Final 04.04.2006
Contract no ----------
Project name -Ten new universities project
Location - Adigrat
Employer - Ministry of Education
Contractor- Daniel Zegeye B.C
Consultant - Geretta Consult PLC
Block - SE -M1-156
previous payment
Pay. no date amount vat 1.as per the attachment, the
1 21/11/2003E.C 392,328.41 65,449.77 material on site to date is Bir
2 20/01/2004E.C 594,582.64 98,743.19
3 23/04/2004E.C 581,744.72 93,395.84
4 20/06/2004E.C 695,466.14 113,296.51
5 25/10/2004E.C 306,788.56 48,440.30
Escalation 27/10/2004E.C 432,153.88 68,234.82
V
10.Total executed amount (1
11.MOE material deduction(7
12.executed amount after MO
13.Total 15% VAT 15%*(12)
14.total prev. vat paid
15.net payable vat for this pa
16.total payment to contr. in
we certify that the contractor is now entitled to the sum of birr Three hundred eighty three tho
11/100 .
Contractor Consultant
VERSITIES CONSTRUCTION PROJECT OFFICE
CATE OF PAYMENT
Contractor_______________________________ Supervisor__________________________________________
ON PROJECT OFFICE
Remark
_______________________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___1________
1.09 Load and cart away surplus excavated material to an appropriate tip. m3 926.79 655.39 53.68 35,181.36
250mm thick basaltic stone hardcore well rolled,consoldated and
blindes with crushed stone.
1.10 M2 516.06 516.80 96.49 49,866.12
TOTAL CARRLED TO SUMMARY 179,900.85
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___2________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___3________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___4________
Supply and fix wire mesh ventilation size 60x60mm (in flat metal
frames) under eave with combination of ribbed sheet size
3.03 120x60mm nailed to structural wood battens size 40x50mm placed
1200x600mm. price include one coat of anti rust and two coats of
synthetic M2 38.68 275.06 10,639.32
TOTAL CARRIED TO SUMMARY 167,771.80
4. CARPENTERY& JOINERY
4.01 Supply and fix 8 mm thick chip wood ceiling M2 554.85 536.39 191.66 102,804.51
4.03 Supply and fix 40mm thick Agro Stone doors
a) Type D1 size 1570x2540mm pcs 3.00 1.00 3,172.38 3,172.38
b) Type D1’ size 1570x2740mm pcs 1.00 2.00 3,413.48 6,826.96
c) Type D2 size 1170x2740mm Pcs 4.00 4.00 2,543.80 10,175.20
d) Type D2’ size 1170x2740mm pcs 4.00 4.00 2,543.80 10,175.20
e) Type D3 size 970x2740mm pcs 8.00 8.00 2,108.96 16,871.68
f) Type D3’ size 970x2540mm pcs 1.00 1.00 2,108.96 2,108.96
g) Type D4 size 870x2740mm pcs 11.00 9.00 1,891.55 17,023.95
h) Type D4’ size 870x2540mm pcs 3.00 5.00 1,753.48 8,767.40
i) Type D5’ size 770x2740mm pcs 14.00 16.00 1,674.13 26,786.08
j) Type D5’ size 770x2540mm pcs 5.00 3.00 1,551.93 4,655.79
TOTAL CARRIED TO SUMMARY………………………………………………… 209,368.11
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___5________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___6________
6.2.3 Solid Metal plates b/n vertical post and C-section channel
a) 2(200x200x4mm) pcs 4.00 4.00 142.09 568.36
6.2.4 Bolts With Nuts
a) Dia 20mm ] bolt. Dev length=400mm pcs 8.00 8.00 37.05 296.40
b) Dia 16mm ] bolt. Dev length=300mm pcs 16.00 16.00 17.76 284.16
b) Dia 20mm ] bolt. Dev length=250mm pcs 4.00 16.00 23.73 379.68
6.2.6 4mm thick Sheet Metal Welded to 220x40x40x3mm
frame and 219x40x40x3mm C-Section channel Support m2 6.30 13.43 1,183.91 15,903.23
6.3 Supply,assemble &errect Structural fireescape Spiral
Stair Case Ls 1.00 1.00 39,755.38 39,755.38
TOTAL CARRIED TO SUMMARY 293,173.51
7.01 7. PLASTERING AND POINTING
Apply three coats of plastering in cement mortar (1:3)
a) to internal wall surface M2 3,146.13 2,732.55 81.35 222,292.93
b) to external wall surface M2 991.37 921.23 79.39 73,136.79
c) to concrete ceiling M2 1,118.34 1,061.78 91.36 97,004.22
d) to exposed column and beams. M2 321.26 89.43 28,730.49
Apply two coats of plastering in cement mortar (1.3) to
7.02 receive ceramic wall tile. M2 38.45 24.92 55.88 1,392.59
TOTAL CARRIED TO SUMMARY 422,557.02
Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___7________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___8________
11.1.8 Supply & fix recessed wall mounted fire hose with cabinet complete No 3.00 3.00 16,421.00 49,263.00
11.1.9 Supply & fix stainless steel kitchen sink with double bowl
- Sink material shall be strictly from stainless steel describe in
catalogues.
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___9________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___10________
Description Unit Con. QTY EXC. QTY Rate Amount
12.ELECTRUCAL WORKS
SUPPLY AND INSTALL
12.1 Feeder Cables
PVC Sheathed PVC insulated power cable type SEMENS
12.1.1 5x16mm2 from Power Intake up to MDB- SA M1 16.00 16.00 255.22 4,083.52
12.1.2 5x10mm2 from MDB-SA up to SDB- SA1 M1 8.00 8.00 179.29 1,434.32
12.1.3 5x6mm2 from MDB-SA up to SDB-SA2 M1 10.00 10.00 116.01 1,160.10
12.2 Conduits and pipes
12.2.1 PVC pipe of 32mm diameter. M1 15.00 15.00 26.29 394.35
12.2.2 PVC pipe of 50mm diameter. M1 15.00 15.00 44.93 673.95
12.3 Distribution Boards
12.3.1 Flush mounting distribution, MDB-SA in sheet steel :-
1 pc main ACB of 63A/3P
1 pc ACB of 32A /3P
1 pc ACB of 25A /3P
4 pc ACB of 16A /3P
10 pc ACB of 10A /3P
25% reserve pitches No 1.00 1.00 6,859.85 6,859.85
12.3.2 Flush mounting distribution, SDB-SA1 in sheet steel :-
1 pc main ACB of 32A /3P
1 pc ACB of 20A /1P
13 pcs ACB of 16A /1P
9 pcs ACB of 10A /1P
25% reserve pitches No 1.00 1.00 6,712.75 6,712.75
12.3.3 Flush mounting distribution, SDB-SA2 in sheet steel :-
1 pc main ACB of 25A /3P
1 pc ACB of 20A /1P
6 pcs ACB of 16A /1P
9 pcs ACB of 10A /1P
25% reserve pitches No 1.00 1.00 4,854.47 4,854.47
12.4 Light points
12.4.1 Flush mounted light points fed trough PVC
insulated conductors of 3x2.5mm2 inside PVC conduits
No 226.00 226.00 237.08 53,580.08
Extra Over Light points for :-
12.5
( TYPE LEGRAND SUNO OR EQUIVALENT )
12.5.1 Flush mounting single switch,7740 01+77 40 41 NO 37.00 37.00 79.54 2,942.98
12.5.2 Flush mounting 2 gang single switch, 77 40 05 + 77 40 42 No 33.00 33.00 115.73 3,819.09
12.5.3 Flush mounting two-way switch, 77 40 06 + 77 40 41 NO 10.00 10.00 96.76 967.60
12.5.4 Flush mounting intermediate switch, 77 40 07 + 77 40 41 No 3.00 3.00 131.24 393.72
12.6 Socket outlet points
12.6.1 10-16A /p flush mounted socket outlets point . No 87.00 87.00 256.86 22,346.82
12.6.2 20A/ 1p flush mounted socket outlets point s. No 2.00 2.00 362.19 724.38
12.7 Extra Over socket points for :-
( TYPE LEGRAND SUNO OR EQUIVALENT )
12.7.1 Flush mounting socket outlet of 10-16A/ 1p,7740 20 + 77 40 No 43.00 43.00 88.15 3,790.45
12.7.2 Flush mounting socket outlet of 10-16A/ 1p twin, + 7740 25 + No 44.00 44.00 164.84 7,252.96
12.7.3 Flush mounting socket outlet of 20A / 1p. No 2.00 2.00 350.79 701.58
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
MESUREMENT CERTIFICATE NO FINAL
Block: SEM-156 page___11________
Contracter_________________________ Supervisor_______________
Daniel zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL
Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL
8 1.40 F1 516.80
1.40
15.68 m2 574.90
14 1.70 F2
1.70
40.46 m2
16 2.00 F3
2.00
64.00 m2
2 0.80 F4
0.80
1.28 m2
121.42 m2 TOTAL
Contracter_________________________ Supervisor___________________
4.61
1.12 8 1.40
5.16 m2 1.40
0.35
4.61 5.49
3.70
17.06 m2 14 1.70
1.70
4 4.51 b/n axis B & C 0.50
3.81 20.23
68.73 m2
16 2.00
4 4.46 2.00
3.86 0.55
68.86 m2 35.20
1 4.61 2 0.80
3.86 0.80
17.79 m2 0.20
0.26
61.17
Contracter_________________________ Supervisor___________________
2.43 m3 TOTAL
3 43.49 C) in Greade Beam 4 4.46
0.30 3.91
0.50 GB1 69.75
19.57 m3
2 14.63 GB2 2 4.51
0.30 3.91
0.50 m3 35.27
4.39
2 9.52 GB3 4.61
0.30 1.48
0.50 6.82
2.86
Contracter_________________________ Supervisor___________________
1 5.56
4.61 36.69
25.63 m2
516.80 m2 TOTAL
1 43.49
2.03 Form Work 0.50
8 5.60 a) in Footing 21.75
0.35 F1
15.68 m2 5 41.49
0.50
14 6.80 F2 103.73
0.50
47.60 m2
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
0.47 m3 5 14.23
4.61
2 5.71 RB8 on axis 5 &6 328.00
0.30 1 11.53
0.20 4.61
0.69 m3 53.15
10.97 m3 TOTAL 1 10.22
4.61
d) In 150mm thick suspended 47.11
2 4.61 solid slab
4.01
1041.31
36.97 m2 TOTAL
e) 40mm thick tread& landing
2 4.30 over the channel 76 1.20
1.50 2.61
12.90 m2
32 1.50 238.03
0.30 m2 35 1.20
14.40 2.61
27.30 m2 TOTAL 109.62
347.65
Contracter_________________________ Supervisor___________________
0.88 On axis B
16.23 36 0.20
2 4.61 to FB-2' 0.20
0.73 On axis B 1.44
6.73 30 0.40
4 13.83 to FB-3 0.20
0.88 On axis A 2.40
48.68 342.57
4 9.94 to FB-4
0.88 On axis 1 & 10
34.99 43.49
8 13.43 to FB-5 0.30
0.60 On axis 3,4,7 & 8
64.46 13.05
4 14.15 to FB-6
0.60 On axis 5 & 6 1 43.09
33.96 0.30
4 14.15 to FB-7 12.93
0.60 On axis 2 & 9 1 41.49
33.96 0.20
2 4.61 to FB-8 8.30
0.88 On axis 1 19.04
8.11 0.40
Addition to 7.62
External Side Part 1 18.44
4 2.70 to FB-6 0.20
0.28 On axis 5 & 6 3.69
3.02 2 19.14
4 3.81 to FB-7 0.30
0.28 On axis 2 & 9 11.48
4.27 2 19.04
to all external beam column
40 0.20 connection 0.30
0.48 11.42
3.84 2 18.44
16 0.40 0.20
0.48 7.38
3.07
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL
14.43 ml TOTAL
Contracter_________________________ Supervisor___________________
5.02 Doors
14 D6=770x1800mm
2 MD1=1570x2540mm 2 6.73 13.46
2 9.27 18.54
Window Doors 5 4.95 24.75
4 DW1=1570x2740mm 1 11.11 11.11
2 DW2=770x2740mm 1 4.95 4.95
2 4.36 8.72
5.04 Balcony steel balustarde
1000mm high 2 14.60 29.20
8 3.00 24.00 on flight 1 14.60 14.60
2 4.15 8.30 on landing 2 4.29 8.58
4 1.50 6.00 on landing 133.91
3 0.85 2.55 on landing 3.49
1 2.70 2.70 second floor stair side 466.73
2 4.61 9.22 on Axis D,first & second floor
52.77 ml TOTAL
Contracter_________________________ Supervisor___________________
b)222x40x40x3mm
b) 222x40x40x3mm (arround landing)
1 26.72 L=2*7.36+8*1.5=26.72
0.38
0.003
0.03
0.03 m3
7850.00 kg/m3
240.38 kg TOTAL
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
2732.55 m2 total
Contracter_________________________ Supervisor___________________
921.23
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM-156 Takeoff Sheet No.: FINAL
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
Contracter_________________________ Supervisor___________________
3.00
2.00
11.1.9 Kitchen sink with double bowl 5.00
size=1500x600mm 1.00
2.00
Contracter_________________________ Supervisor___________________
11.3.3.Clean outs
1.00 dia.110mm
Contracter_________________________ Supervisor___________________
60.00
1.00
Contracter_________________________ Supervisor___________________
CTOR
ON PROJECT
page___1________
Description
1.07.Fill around foundation&building
m3 total pit excav.
m3 TOTAL
m3 TOTAL
1.09.Cart away
m3 site clear
m3 Bulk excav.in ordinay soil
m3 Bulk excav. In soft rock
m3 Bulk excav. In rock
m3 Fill around foundation & building
or___________________________
CTOR
ON PROJECT
page___2________
Description
under GFB-4
under GFB-5
under GFB-6
under GFB-7
CTOR
ON PROJECT
page___3________
Description
b/n axis C & D
m2
m2
m2
m2 TOTAL
C) under masonry
m2 TOTAL
F2
m3
F2
m3
F3
m3
F4
m3 TOTAL
or___________________________
CTOR
ON PROJECT
page___4________
Description
GB4
m3
GB5
m3
GB6
m3
GB7
m3
GB
m3 STR 1
m3 TOTAL
m2
m2
m2
or___________________________
CTOR
ON PROJECT
page___5________
Description
F3
m2
F4
m2
m2 TOTAL
b) in foundation column
m2
m2
m2
m2
m2
m2
m2
m2 TOTAL
C ) to gread Beams
GB1
m2
m2
or___________________________
CTOR
ON PROJECT
page___6________
Description
to GFS-2
to GFS-3
3. MASONRY WORK
3.01.400mm thick stone masonry
blow NGL
av.d=0.4m
m3 TOTAL
or___________________________
CTOR
ON PROJECT
page___7________
Description
FB5 at 1st &2nd on axis 3,4,7 & 8
m3
m3
m3
m3
m3 TOTAL
C) In Roof Beams
RB1 on axis D
m3
RB2 on axis C
m3
RB3 on axis B
m3
or___________________________
CTOR
ON PROJECT
page___8________
Description
1.02 Rebbed slab for suspended
solid slab
1-2 /B-D & 9-10/B-D
5-6 /B'-D
6-7 /B'-D
First Floor
1-2 /B-D & 9-10/B-D
5-6 /B'-D
6-7 /B'-D
m3 TOTAL
1.03 FORM WORK
a) Elevation Column
C1,C2 &C3 at G+0 &G+1
m2
C1,& C2 G+2
m2
m2 TOTAL
or___________________________
CTOR
ON PROJECT
page___9________
Description
m2 TOTAL
c) To ROOF BEAMS
RB1 on axis D
m2
m2
m2
RB2 on axis C
m2
m2
RB1 on axis B
m2
m2
m2
or___________________________
CTOR
ON PROJECT
page___10________
Description
RB8 on axis 5 &6
m2
m2
m2 TOTAL
m2 TOTAL
1.04 Pre Cast Element
PCS TOTAL
or___________________________
CTOR
ON PROJECT
page___11________
Description
D5=770X2740mm
DW1=
a) W1 = 4570 x 1340 mm
b) W2 = 1770 x 410 mm
b) First Floor
on axis D
on axis C
on axis B
on axis A
on axis 1
on axis 2
on axis 3
On axis 4
On axis 5,6
On axis 7
or___________________________
CTOR
ON PROJECT
page___12_________
Description
c) Second Floor
on axis D
on axis C
on axis B
on axis A
on axis 1&10
on axis 2
On axis 4
On axis 5,6
On axis 7
On axis 8
On axis 9
or___________________________
CTOR
ON PROJECT
page___13_________
Description
Second Floor
b/n axis C&B
Deduction
D5=770X2740mm
D6=770X1800mm
Louver wall
m2 TOTAL
or___________________________
CTOR
ON PROJECT
page___14_________
Description
m2 TOTAL
4.CARPENTRY&JONERY
4.01 fix 8mm thick chip
wood ceiling semminar room
Assembly
Office
Balcony
Office
Seminar Room
Seminar Room
Pool Office
Store
WC
Office
Pool Office
Circulation
CTOR
ON PROJECT
page___15_________
Description
6.STEEL STRUCTURE
6.1 RHS TRUSS
6.1.1 Upper and lower chord
a) (60x60x3mm)
Upper
on T-2
on T-3
Lower
on T-2
on T-3
Vertical(60x60x3mm)
on T-2
on T-3
total ml
kg/ml
kg TOTAL
b)40x40x3mm
Upper
on T-1
on T-1
on T-3
on T-4
on T-4
on T-5
Lower 40x40x3mm
on T-1
on T-4
on T-5
total ml
kg/ml
kg TOTAL
or___________________________
CTOR
ON PROJECT
page____16_______
Description
Vertical LP-1
ml on T-3
ml on T-2
ml on T-1
Diagonal LP-1
ml on T-3
ml on T-2
ml on T-1
Upper Lp-2
ml on T-3
ml on T-5
Lower LP-2
ml on T-3
ml on T-5
Vertical LP-2
ml on T-3
ml on T-5
Diagonal LP-2
ml on T-3
ml on T-5
Upper Lp-3
ml on T-1
ml on T-1
Lower LP-3
ml on T-1
ml on T-1
Vertical LP-3
ml on T-1
ml on T-1
Diagonal LP-3
ml on T-1
ml on T-1
total ml
kg/ml
kg TOTAL
or___________________________
CTOR
ON PROJECT
page____17_______
Description
c) 300x60x40x3mm(trade)
kg/m3
kg TOTAL
m2 TOTAL
CTOR
ON PROJECT
page___18_________
Description
M.WC
T.WC
Ddt
W1 = 4570 x 1340 mm
W2 = 1770 x 410 mm
D1=1570X2540mm
D2=1170X2740mm
D3=970X2740mm
D4=870X2740mm
D5'=770X2540mm
D5=770X2740mm
D6 = 770x1800 mm
D6 = 770x1800 mm
m2 sub total
or___________________________
CTOR
ON PROJECT
page___19________
Description
Language lab.
office
Corridor
F.WC
M.WC
Ddt
W1 = 4570 x 1340 mm
W2 = 1770 x 410 mm
or___________________________
CTOR
ON PROJECT
page___20________
Description
Office Pool
Store
Office
Office Pool
Corridor
F.WC
M.WC
Ddt
W1 = 4570 x 1340 mm
or___________________________
CTOR
ON PROJECT
page___21________
Description
On 1st Floor
on axis D
Balcony
Balcony
On 2nd Floor
on axis D
Balcony
Balcony
Deduction
a) W1 = 4570 x 1340 mm
DW1=1574x2740mm
DW2=1774x2740mm
Rear elevation
On Ground Floor
on axis A
On 1st Floor
on axis A
on axis B
or___________________________
CTOR
ON PROJECT
page___22________
Description
Right Elevation
On Ground Floor
on axis 9
On 1st Floor
on axis 10
on axis 9
Balcony
Balcony
On 2nd Floor
on axis 10
on axis 9
Deduction
D1=1570X2540mm
D4'=870X2540mm
on axis 1 & 10
on axis 2 & 8
on axis 4 & 7
Deduction
On axis A
Louvered Wall
Total Parapet External Plastering
or___________________________
CTOR
ON PROJECT
page___23________
Description
male and female WC
WC Corridor
office
office
office
Store
Store
Store
Corridor
Aound stair case
On axis B
On axis A
On axis 1 & 10
On axis 3
On axis 4
or___________________________
CTOR
ON PROJECT
page___24________
Description
On axis 4
On axis 7
On axis 8
On axis 5 & 6
On axis 2
On axis 9
On Stair case
On 2nd Floor
On axis D
On axis B
Column
On Ground Floor
On axis D
On axis C
or___________________________
CTOR
ON PROJECT
page___25________
Description
Ddt
D6 = 770x1800 mm
T.WC
Ddt
D6 = 770x1800 mm
1st floor
F.WC
Ddt
D6 = 770x1800 mm
M.WC
Ddt
D6 = 770x1800 mm
2nd floor
F.WC
Ddt
D6 = 770x1800 mm
M.WC
Ddt
D6 = 770x1800 mm
or___________________________
CTOR
ON PROJECT
page____26_______
Description
1st floor
Language lab.
Server room
Comp. Room
Teachers rest room
Balcony
Comp. Room
Language lab.
Special purpose
Computer & Accesary room
Language lab.
office
Tea preparation room
WC Corridor
office
office
office
Store
Store
Store
Corridor
Aound stair case
2nd floor
Assembly
Office
Balcony
Office
Seminar Room
Seminar Room
Pool Office
Store
Office
Pool Office
Aound stair case
Corridor
or___________________________
CTOR
ON PROJECT
page____27_______
Description
DW2=770x2740mm
MD1
Wooden doors
D1=1570X2540mm
D1'=1570X2740mm
D2=1170X2740mm
D2'=1170X2740mm
D3=970X2740mm
D3'=970X2540mm
D4=870X2740mm
D4'=870X2540mm
D5=770X2740mm
D5'=770X2540mm
m2 total
or___________________________
CTOR
ON PROJECT
page____28_______
Description
Janitary Room
Store
Aound stair case
F.WC
M.WC
T.WC
Deduction
D1
D2
D3
D4
D5
D5'
D6
DW1
1st floor
Language lab.
Server room
Comp. Room
Teachers rest room
Balcony
Comp. Room
Language lab.
Special purpose
Computer & Accesary room
Language lab.
office
Tea preparation room
office
office
office
Store
Store
Store
Aound stair case
F.WC
M.WC
or___________________________
CTOR
ON PROJECT
page____29_______
Description
or___________________________
CTOR
ON PROJECT
page____30_______
Description
11.1.10 ditto to item 11.1.9
Janitor sjnk
or___________________________
CTOR
ON PROJECT
page____31_______
Description
12.3. Distribution Board
12.3.1flush mounting distribution
board,MDB-SA
1pcs main ACB of 63A/3p
1pcs ACB of 32A/3p
1 pcs ACB of 25A/3p
4 pcs ACB of 16A/1p
10 pcs ACB of 10A/1p
25% resrve pitch
or___________________________
CTOR
ON PROJECT
page____32_______
Description
12.9.4MODUS TU136K+
RFTUB136+1xT836w/840lamp.
12.10. Low voltage system earthing
12.10.1 Low voltage system earthing
1x16mm2(16m) bare copper
Conductor
or___________________________
Daniel Zegeye GENERAL CONTRACTOR
ADIGRAT UNIVERSITY BUILDING CONSTRUCTION PROJECT
TAKEOFF SHEET
Block: SEM_156 Takeoff Sheet No.: FINAL page___1_________
No of Bars
Bar Dia.
Loction No Shape Mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
Sub structure
F1 1 10 1.80 18.00 8.00 144.00 259.20
F2 2 12 2.40 18.00 14.00 252.00 604.80
F3 3 12 2.80 26.00 16.00 416.00 1164.80
F4 4 10 0.90 10.00 2.00 20.00 18.00
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
GFB1 14 8.10 3.00 3.00 9.00
axis B,C & D 14 10.40 9.00 3.00 27.00
14 8.10 3.00 3.00 9.00
14 5.50 3.00 3.00 9.00
14 10.00 9.00 3.00 27.00
14 10.30 3.00 3.00 9.00
ST 8 1.40 207.00 3.00 621.00 869.40
on 1st Floor
C1 20 4.00 8.00 6.00 48.00
6 1.20 14.00 6.00 84.00 100.80
C2 20 4.00 10.00 29.00 290.00
6 1.20 14.00 29.00 406.00 487.20
C3 20 3.20 8.00 3.00 24.00
6 1.20 14.00 3.00 42.00 50.40
on 2nd Floor
C1 20 3.00 6.00 6.00 36.00
6 1.20 14.00 6.00 84.00 100.80
C2 20 3.00 6.00 29.00 174.00
6 1.20 14.00 29.00 406.00 487.20
TOTAL LENGTH 1864.80 0.00 0.00 0.00
Weigth Per Meter (Kg/m) 0.222 0.395 0.617 0.888
TOTAL WEIGTH In Kg 413.99 0.00 0.00 0.00
No of Bars
Bar Dia
Loction No Shape mm Length(m) Each Member Total 6.00 8.00 10.00 12.00
FB1 14 8.10 2.00 2.00 4.00
14 10.40 6.00 2.00 12.00
14 8.10 2.00 2.00 4.00
14 5.50 2.00 2.00 4.00
14 10.00 6.00 2.00 12.00
14 10.30 2.00 2.00 4.00
stirup 8 1.36 207.00 2.00 414.00 563.04
139.20
841.00
69.60
11.20
48.60
48.60
33.00
61.80
71.10
71.10
1173.00 0.00 0.00
1.209 1.579 2.467
1418.16 0.00 0.00
age___3_________
57.60
43.80
43.80
55.20
53.40
48.00
39.60
59.40
17.40
17.40
age___4_________
age___5_________
192.00
1160.00
96.00
192.00
1160.00
76.80
108.00
522.00
age___6_________
45.60
45.60
64.80
64.80
44.00
82.40
age___7_________
22.80
22.80
266.40 209.60 0.00
1.209 1.579 2.467
322.08 330.96 0.00
age___8_________
153.60
116.80
25.60
54.40
22.40
116.80
110.40
age___9_________
23.00
23.00
46.00 390.40 188.00
1.209 1.579 2.467
55.61 616.44 463.80
ge___10_________
ge___11_________
31.60
22.40
31.60
40.40
40.40
249.60 0.00 0.00
1.209 1.579 2.467
301.77 0.00 0.00
ge___12_________
45.80
45.80
22.60
22.60
19.80
19.80
ge___13_________
ge___14_________
Rock excavation up to
between 1.5m & 3.0m
Rock excavation up
excavation between
excavation in meter
excavation (up to
1.5m from RGL)
Rock excavation
Rock excavation
to NGL in meter
Ordinary soil
square meter
in meter
from RGL
from RGL
from RGL
Item No
in meter
RGL
Location
up
1 1B 0.19 1.10 2.40 0.91 1.30 0.20 0.60 0.50 3.61 0.72 2.17 1.80
2 1C 0.67 1.10 2.40 0.43 1.30 0.20 0.40 0.70 4.84 0.97 1.94 3.39
3 1D 0.80 1.10 2.40 0.30 1.30 0.40 0.20 0.70 3.61 1.44 0.72 2.53
4 2A 0.00 1.10 2.30 1.10 1.20 0.30 0.90 3.61 0.00 1.08 3.25
5 2B 0.40 1.10 2.30 0.70 1.20 0.45 0.75 6.25 0.00 2.81 4.69
6 2C 0.68 1.10 2.30 0.42 1.20 0.40 0.80 6.25 0.00 2.50 5.00
7 2D 0.76 1.10 2.30 0.34 1.20 0.40 0.10 0.70 4.84 1.94 0.48 3.39
8 3A 0.06 1.10 2.30 1.04 1.20 0.20 1.00 4.84 0.00 0.97 4.84
9 3B 0.30 1.10 2.30 0.80 1.20 0.20 1.00 6.25 0.00 1.25 6.25
10 3C 0.70 1.10 2.30 0.40 1.20 0.20 1.00 6.25 0.00 1.25 6.25
11 3D 0.73 1.10 2.40 0.37 1.30 0.35 0.15 0.80 4.84 1.69 0.73 3.87
12 4A 0.12 1.10 2.30 0.98 1.20 0.20 1.00 4.84 0.00 0.97 4.84
13 4B 0.38 1.10 2.30 0.72 1.20 0.20 1.00 6.25 0.00 1.25 6.25
14 4C 0.70 1.10 2.30 0.40 1.20 0.20 1.00 6.25 0.00 1.25 6.25
15 4D 0.70 1.10 2.40 0.40 1.30 0.30 0.00 1.00 4.84 1.45 0.00 4.84
16 5A 0.19 1.10 2.30 0.91 1.20 0.20 1.00 3.61 0.00 0.72 3.61
17 5B 0.38 1.10 2.20 0.72 1.10 0.60 0.50 6.25 0.00 3.75 3.13
18 5C 0.63 1.10 2.30 0.47 1.20 0.70 0.50 6.25 0.00 4.38 3.12
19 5D 0.50 1.10 2.30 0.60 1.20 0.40 0.30 0.50 4.84 1.94 1.45 2.42
20 STR1 F4 0.30 1.10 2.10 0.80 1.00 0.40 0.30 0.30 1.44 0.58 0.43 0.43
21 STR1 F4 0.30 1.10 2.20 0.80 1.10 0.40 0.30 0.40 1.44 0.58 0.43 0.58
foot wash,
Super hand wash
Sub structure structure Precast and washing Total
(kg) (kg) beam(kg) basin(kg) (kg)
Dia.6mm plain bar 71.04 2002.21 2933.26 5006.51
Dia.8mm deformed bar 2361.63 1188.11 0.00 3549.74
Dia.10mm deformed bar 171.03 1163.11 0.00 1334.14
Dia.12mm deformed bar 1598.31 1886.82 1827.20 5312.33
Dia.14mm deformed bar 2407.60 2511.33 4590.47 9509.40
Dia.16mm deformed bar 0.00 2786.62 0.00 2786.62
Dia.20mm deformed bar 2617.49 10705.79 0.00 13323.28
SE-M1-156
6,567.85
1,375,861.98