THE UTILIZATION OF BINARY CYCLE POWERPLANT IN MANGGARAI TIMUR, NTT FOR IMPROVING THE NUMBER OF ELECTRICITY POWER
FROM RENEWABLE ENERGY IN INDONESIA
KEY ACTIVITIES CUSTOMER COSTUMER
KEY PARTNERS VALUE RELATIONSHIPS SEGMENTS PROPOSITIONS GENERATING THE A LONG-TERM COOPERATING WITH ELECTRICITY BY USING RELATIONSHIP SOME LOCAL THE BINARY CYCLE IN WHICH MAKES THE THE AMOUNT OF PT. PLN ENTERPRISES WITHIN GEOTHERMAL POWER DEVELOPER KEEP POWER NEEDED (PERSERO) AS A ONE BIG CONSORTIUM PLANT THE STABILITY OF BY PLN (BUYER) SINGLE IN ORDER TO DEVELOP VALUE GIVEN TO THE GEOTHERMAL PURCHASER AND BUYER DISTRIBUTOR OF RESOURCES ELECTRICITY IN KEY RESOURCES CHANNELS INDONESIA
UTILIZING THE PLN GET THE
PERFORMING SOME UNUSED WARM ELECTRICITY ROUTINE RESEARCHES WATER FROM DIRECTLY FROM TOGETHER WITH BPTT MAIN POWER DEVELOPER’S FOR THE POWER PLANT POWERPLANT PLANT ADVANCEMENT
COST STRUCTURE REVENUE STREAMS
THE COST WILL DEPEND ON OPERATION AND PLN WILL BE OBLIGED TO PAY BASED OF THE MAINTENANCE DURING THE GENERATION OF AMOUNT, RATIFIED IN THE BIDDING, ANNUALLY ELECTRICITY