THE UTILIZATION OF BINARY CYCLE POWERPLANT IN MANGGARAI TIMUR, NTT FOR IMPROVING THE NUMBER OF ELECTRICITY POWER

FROM RENEWABLE ENERGY IN INDONESIA

KEY ACTIVITIES CUSTOMER COSTUMER


KEY PARTNERS VALUE
RELATIONSHIPS SEGMENTS
PROPOSITIONS
GENERATING THE A LONG-TERM
COOPERATING WITH ELECTRICITY BY USING RELATIONSHIP
SOME LOCAL THE BINARY CYCLE IN WHICH MAKES THE
THE AMOUNT OF PT. PLN
ENTERPRISES WITHIN GEOTHERMAL POWER DEVELOPER KEEP
POWER NEEDED (PERSERO) AS A
ONE BIG CONSORTIUM PLANT THE STABILITY OF
BY PLN (BUYER) SINGLE
IN ORDER TO DEVELOP VALUE GIVEN TO
THE GEOTHERMAL PURCHASER AND
BUYER DISTRIBUTOR OF
RESOURCES
ELECTRICITY IN
KEY RESOURCES CHANNELS
INDONESIA

UTILIZING THE PLN GET THE


PERFORMING SOME UNUSED WARM ELECTRICITY
ROUTINE RESEARCHES WATER FROM DIRECTLY FROM
TOGETHER WITH BPTT MAIN POWER DEVELOPER’S
FOR THE POWER PLANT POWERPLANT
PLANT ADVANCEMENT

COST STRUCTURE REVENUE STREAMS


THE COST WILL DEPEND ON OPERATION AND PLN WILL BE OBLIGED TO PAY BASED OF THE
MAINTENANCE DURING THE GENERATION OF AMOUNT, RATIFIED IN THE BIDDING, ANNUALLY
ELECTRICITY