PS14 - 02 of 04

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

M13

M9
M14
660

M10
DETAIL OF - M13

330
300

600
324

M13
DETAIL OF - M9

660
600
M9
DETAIL OF - M14
M10 M14

740 336
750

DETAIL OF - M10

NOTES:
1.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2.ALL MATERIALS FOR PIPE SUPPORTS SHALL BE A36 / S275JR / S355JR / EQ UNLESS
OTHERWISE MENTIONED IN THE DRAWING.
3. ALL PIPE SUPPORT DRAWING SHALL BE PREPARED AS PER THE EXCEL SHEET DIMENSIONS
SUPPORT ID QTY(NOS) SUPPORT ID QTY(NOS) & DOCUMENT-301-00-PI-SPC-00057.
POS-0008-304-99-AP-17501 POS-0015-304-99-GNI-17510 4. ALL WELDS ARE "BUTT WELD" AND CONTIINUOUS WELD UNLESS
1 1 OTHERWISE INDICATED
POS-0001-304-99-GNI-17511 1 FOR FILLET WELDS SEE DETAILS BELOW

BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 2

Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) mm (kg) Qty. (kg) Mark Assembly (kg/m) mm (kg) Qty. (kg) WELD ON BOTH SIDES WELD ON ONE SIDE
M9 1 L100X10 15.10 600.00 9.06 1 9.06 S275 M13 2 L120X12 21.6 660.00 14.25 2 28.5 S275 a =0.5 X E min a =0.7 X E min
M10 1 HEB100 20.4 740.00 15.09 1 15.09 S275 M14 2 HEB100 20.4 324.00 6.60 2 13.2 S275
Total 24.96 Total 41.7
REFERENCE DRAWING

S.NO DOC.NO REMARKS


M11
1 301-00-PI-SPC-00057

0 ISSUED FOR APPROVAL INB 19.01.2024 SA 19.01.2024

M15 REV By Date By Date


M12 MARK
DESCRIPTION
CREATED CHECKED

M16 PROJECT TITLE :


250
North Field East Project
DETAIL OF - M15
150

Onshore LNG Facilities


300
M11

85

250
M15

M12 CONTRACTOR :
M16
1060 139
147
DETAIL OF - M16

SUB CONTRACTOR :
ALMANA STEEL STRUCTURES CO W.L.L
P.O.BOX NO.40990
SUPPORT ID QTY(NOS) SUPPORT ID QTY(NOS) DOHA-QATAR
PH:+974-4600809
300 POS-0002-305-171-BT-16307 1 POS-0001-304-171-PP-15382 1
1050 EMAIL : almanagroup@almanagroup.com
web:www.almanagroup.com
DETAIL OF - M11 DETAIL OF - M12

SCALE : PROJECT NO. : J812


BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1
PROJECT SUPPORT MARK SHT SIZE REVISION
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) mm (kg) Qty. (kg) Mark Assembly (kg/m) mm (kg) Qty. (kg)
NFE1 PS14 02/04 A2 0
M11 1 L100X10 15.10 300.00 4.53 1 4.53 S275 M15 1 L80X8 9.7 250.00 2.42 1 2.42 S275
M12 1 L100X10 15.10 1050.00 15.85 1 15.85 S275 M16 1 L80X8 9.7 139.00 1.34 1 1.34 S275
Total 20.38 Total 3.76 Ope. Center Doc No.

You might also like