PS12 - 21 of 21

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

B3 B3

B1 B1

B4 B2

1085
1860 75 550 75

B4 DETAIL OF - B1
DETAIL OF - B3
100 550 100

B2

750

B3

B3
700

DETAIL OF - B4

1225
2000
DETAIL OF - B2 NOTES:

B1
B1
1.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
2.ALL MATERIALS FOR PIPE SUPPORTS SHALL BE A36 / S275JR / S355JR / EQ UNLESS
OTHERWISE MENTIONED IN THE DRAWING.
3. ALL PIPE SUPPORT DRAWING SHALL BE PREPARED AS PER THE EXCEL SHEET DIMENSIONS
& DOCUMENT-301-00-PI-SPC-00057.
4. ALL WELDS ARE "BUTT WELD" AND CONTIINUOUS WELD UNLESS
OTHERWISE INDICATED

FOR FILLET WELDS SEE DETAILS BELOW

SUPPORT ID QTY(NOS)
POS-0011-310-129C-VR-00012 1 SUPPORT ID QTY(NOS)

POS-0113-310-129C-VR-00015 1
POS-0114-310-129C-VR-00015 1
WELD ON BOTH SIDES WELD ON ONE SIDE
POS-0115-310-129C-VR-00015 1
a =0.5 X E min a =0.7 X E min

BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 3

Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material REFERENCE DRAWING
Mark Assembly (kg/m) (mm) (kg) Qty. (kg) Mark Assembly (kg/m) (mm) (kg) Qty. (kg) DOC.NO
S.NO REMARKS
B3 2 HEB120 26.7 1860.00 49.66 2 99.32 S275 B1 2 HEB140 33.7 1085.00 36.564 6 219.39 S275
1 301-00-PI-SPC-00057
B4 1 HEB140 33.7 700.00 23.59 1 23.59 S275 B2 1 HEB140 33.7 750.00 25.275 3 75.83 S275

Total 122.91 Total 295.22 0 ISSUED FOR APPROVAL INB 19.01.2024 SA 19.01.2024

Z1 Z1 REV By Date By Date


Z3 Z4 DESCRIPTION
MARK CREATED CHECKED
Z2
Z4
PROJECT TITLE :
401 North Field East Project
100 275 100
DETAIL OF - Z1
150 465 150 Onshore LNG Facilities
CONTRACTOR :
400
Z4
475
Z2 DETAIL OF - Z3

500
DETAIL OF - Z2
501

Z3

Z3
Z1

Z1

SUB CONTRACTOR :
ALMANA STEEL STRUCTURES CO W.L.L
P.O.BOX NO.40990
765 DOHA-QATAR
QTY(NOS) PH:+974-4600809
SUPPORT ID
SUPPORT ID QTY(NOS) EMAIL : almanagroup@almanagroup.com
POS-0007-999-175-WU-2018 1 DETAIL OF - Z4 web:www.almanagroup.com
POS-0105-999-175-WU-2012 1
SCALE : PROJECT NO. : J812
BILL OF MATERIALS ASSY QTY : 1 BILL OF MATERIALS ASSY QTY : 1
PROJECT SUPPORT MARK SHT SIZE REVISION
Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly (kg/m) (mm) (kg) Qty. (kg) Mark Assembly (kg/m) (mm) (kg) Qty. (kg)
NFE1 PS12 21/21 A2 0
Z1 2 HEB100 20.4 401.00 8.18 2 16.36 S275 Z3 2 HEB100 20.4 400.00 8.16 2 16.32 S275
Z2 1 HEB100 20.4 475.00 9.69 1 9.69 S275 Z4 1 HEB100 20.4 765.00 15.60 1 15.60 S275
Total 26.05 Total 31.93 Ope. Center Doc No.

You might also like