Dimensions Checklist TK-17

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 13

REPLAMCEMENT OF OIL STORAGE TANKS NO.

01 & 17
AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 15
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/5/2023
Description: Dimensions check Page: 1/1
Drawings: 16372T-AD-156 Sheet: 1 OF 3
TEST PREPARATION AND EXECUTION DETAILES
GPS Model: SunNav S26 1230600085/1230508190
Station Model: Kloda KTS-442R15U SN°: K163256
Certifcate Calibration N°: Date of Expiry

TK-17 NOZZLE ORIENTATION


No. Name Easting Northing Angle Dist.(MTR)
1 M4 239048.959 3389541.124 207° 15,250
2 M5 239048.882 3389564.828 309° 15,250
3 M6 239072.542 3389559.007 55° 15,250

M5 M6

270° 90°

M4

180°

Surveyor QA/QC Inspector QA/QC coordinator WOC Surveyor WOC


Name : Youssef Fraj Saleh Ghaith ALIBI Ramzi GHARBI

Date :

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 16
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/3/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
00 DSC-00 Truss (36) 08
01 DSC-01 Truss (33) 24

Drawing Details
RESULTS Comments
*Measured Value :5471mm Conforme
*Measured Value :886mm Conforme
*Measured Value :982mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/3/2023 12/3/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 17
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/5/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-02 Truss (30) 30

Drawing Details
RESULTS Comments
*Measured Value :5472mm Conforme
*Measured Value :886mm Conforme
*Measured Value :790mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/5/2023 12/5/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 18
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/10/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-03 Truss (27) 45

Drawing Details
RESULTS Comments
*Measured Value :5472mm Conforme
*Measured Value :693mm Conforme
*Measured Value :790mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/10/2023 12/10/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 19
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/13/2023
Description: Deck Structure Installation Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Installation of Deck Structure fisrt & second Ring /TK-17
No. Ring No. QTY
01 Ring plate (8) 01
02 Ring plate (7a,7b) 04
03 DSC-00 Truss (33) 08
04 Compart plate (14b) 20

Drawing Details
* Ring Plate (7a/7b) thichness 5mm Yes
*Ring Plate (8) thichness 5mm Yes
*Vertical plate Ring plate Yes
*Deck Structure Fabricated according to Drawing API 650 Yes
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Yes
Remarks:

QA/QC Inspector QA/QC coordinator C&M WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/13/2023 12/13/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 20
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/14/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-04 Truss (24) 60

Drawing Details
RESULTS Comments
*Measured Value :5472mm Conforme
*Measured Value :693mm Conforme
*Measured Value :790mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/14/2023 12/14/2023

Signature :
REPLAMCEMENT OF DAMAGED OIL TANKS NO.1
AND NO. 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 21
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/15/2023
Description: Deck Structure Installation Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Installation of Deck Structure fisrt & second Ring /TK-17
No. Ring No. QTY
01 Ring plate (6a,6b) 07
02 DSC-01 Truss (33) 20
03 DSC-02 Truss (30) 30
04 Compart plate (14a) 06

Drawing Details
* Ring Plate (6a/6b) thichness 5mm Yes
*Ring Plate (8) thichness 5mm Yes
*Deck Structure Fabricated according to Drawing API 650 Yes
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Yes
Remarks:

QA/QC Inspector QA/QC coordinator C&M WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/15/2023 12/15/2023

Signature :
REPLAMCEMENT OF DAMAGED OIL TANKS NO.1
AND NO. 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 22
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/18/2023
Description: Intermediate Wind Girder Installation Page: 1/1
Drawings: 16372T-AD-161 Sheet: 1 OF 3
Installation of Intermediate wind girder /TK-17
No. Ring No. QTY
01 Int Wind girder 42

Drawing Details
*Measured Value :800mm Yes
*Thickness Plate: 8mm Yes
*Deck Structure Fabricated according to Drawing API 650 Yes
*Deck Structure Fabricated according to Drawing 16372T-AD-179 & 16372T-AD-179 Yes
Remarks:

QA/QC Inspector QA/QC coordinator C&M WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/19/2023 12/19/2023

Signature :
REPLAMCEMENT OF DAMAGED OIL TANKS NO.1
AND NO. 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 23
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 17/01/2024
Description: Deck Structure Installation Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Installation of Deck Structure fisrt & second Ring /TK-17
No. Ring No. QTY
01 Ring plate (4a,4b) 13
02 Ring plate (3a,3b) 15
03 Ring plate (2a,2b) 18
04 Ring plate (1a,1b) 20
05 DSC-03 Truss (04) 60
06 DSC-03 Truss (05) 75
07 DSC-03 Truss (06) 85
08 DSC-03 Truss (07) 95
09 Compart plate (12) 12
10 Compart plate (11) 15
11 Compart plate (10) 17
12 Compart plate (09) 19

Drawing Details
*Measured Value :180mm Yes
*Ring Plate (4a/4b)/(3a/3b)/(2a/2b) thickness 5mm /(1a/1b) thickness 6mm Yes
*Deck Structure Fabricated according to Drawing API 650 Yes
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Yes
Remarks:

QA/QC Inspector QA/QC Coordinator C&M WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 17/01/2024 17/01/2024

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 24
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/21/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-05 Truss 75

Drawing Details
RESULTS Comments
*Measured Value :5391mm Conforme
*Measured Value :600mm Conforme
*Measured Value :499mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/21/2023 12/21/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 25
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 12/27/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-06 Truss 85

Drawing Details
RESULTS Comments
*Measured Value :5470mm Conforme
*Measured Value :575mm Conforme
*Measured Value :500mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector QA/QC coordinator Representative WOC WOC


Name : Ghaith ALIBI Ramzi GHARBI
Date : 12/27/2023 12/27/2023

Signature :
REPLAMCEMENT OF OIL STORAGE TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 26
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 29/12/2023
Description: Deck Structure Page: 1/1
Drawings: 16372T-AD-179 Sheet: 1 OF 1
Deck Structure /TK-17
No. Ring No. QTY
01 DSC-07 Truss 100

Drawing Details
RESULTS Comments
*Measured Value :5470mm Conforme
*Measured Value :575mm Conforme
*Measured Value :650mm Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-179 Conforme
Remarks:

QA/QC Inspector Site Manager Representative WOC WOC


Name : Gharbi Ramzy Med Guidara
Date : 1/2/2024 1/2/2024

Signature :
REPLAMCEMENT OF DAMAGED OIL TANKS NO.01
& 17 AT ES-SIDER TANK FARM

CPPE ENTERPRISES QA/QC DEPARTMENT

DIMENSIONS CHEKLIST INSPECTION REPORT


Contract No. 1424 Report No.: 27
Client: AL WAHA Project : ES-SIDER TANK FARM
Location: OIL Storage Tank-17 Date: 10/02/2024
Description: Orientation of Roof Support Page: 1/1
Drawings: 16372T-AD-176 Sheet: 1 OF 1
Deck Structure /TK-17
No. QTY RIM
01 Roof Support 1(4) R 1369
02 Roof Support 2(8) R 6339
03 Roof Support 3(12) R 11814
04 Roof Support 4(18) R 17289
05 Roof Support 5(24) R 22764
06 Roof Support 6(30) R 28239
07 Roof Support 7(34) R 33714
08 Roof Support 8(40) R 38822

Drawing Details
RESULTS Comments
*Measured Value : Angle (7°/15°/10°/15°/23°/18°) Conforme
*Deck Structure Fabricated according to Drawing API 650 Conforme
*Deck Structure Fabricated according to Drawing 16372T-AD-176 Conforme
Remarks:

QA/QC Inspector CPPE Surveyor WOC Surveyor WOC


Name : Ghaith ALIBI
Date : 10/02/2024

Signature :