Quantity Unit
15 pcs.
30 pcs.
3 pcs.
1 box
2 pcs.
TOTAL = (A+B)
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
SUB TOTAL:
Prepared by:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials
Quantity
4
SUB TOTAL: Prepared by:
PROGRAM OF WORK
Name of Project : Improvement of Vermi Composting Facility
Project Location : Gulayan sa Paaralan
Project Proponent : TVL. Crop. Production
Project Beneficiaries : TVL. Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 15,000.00
A. Materials
Quantity
10
6
4
100
8
10
SUB TOTAL:
Prepared by:
PROGRAM OF WORK
A. Materials
Quantity
10
5
4
8
100
2
SUB TOTAL:
Prepared by:
PROGRAM OF WORK
A. Materials
Quantity
16
6
4
200
8
6
20
12
SUB TOTAL:
Prepared by:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
SY. 2017-2018
A. Materials
Quantity
30
600
2
2
2
2
100
2
5
SUB TOTAL:
Prepared by:
PROGRAM OF WORK
SY. 2017-2018
PROGRAM OF WORK
Name of Project : Phase II Additional Five Spans of Perimeter Fence in the Garden
Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri Crop Production
Project Beneficiaries : TVL-Agri-Crop Students
Source : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Php. 21 Quantity
29
198
A. Materials: 4
2
2
SUB TOTAL:
B. LABOR:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
B. LABOR:
PROGRAM OF WORK
PROGRAM OF WORK
Name of Project : Labor and Wages for the Maintenance of the Garden (Clearing, Weeding, Planting)
Project Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri-Crop Producrion (Gulayan sa Paaralan)
Project Beneficiaries : TVL-Agri-Crop Students and Teachers
Source Of Funds : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Php. 10,800.00
No. of Laborer : 2
Rate per Day : 250
No. of Days Work : 21.6 days
21.6DAYS X 250X2 = Php. 10,800.00
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
PROGRAM OF WORK
Unit
Unit
Ream
Ream
SUB TOTAL:
Grand Total:
ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
30
600
2
2
2
2
100
2
5
SUB TOTAL:
Labor: 35%
PROGRAM OF WORK
A. Materials:
Quantity
25
5
5
27
20
3
1
1
SUB TOTAL:
Labor: 35%
PROGRAM OF WORK
A. Materials:
Quantity
25
5
3
1
1
Labor: 35%
Grand Total: ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
10
5
4
8
100
2
Labor: 35%
PROGRAM OF WORK
A. Materials:
Quantity
8
3
2
100
4
3
10
6
Labor: 35%
PROGRAM OF WORK
A. Materials:
Quantity
10
2
2
5
84.375
Labor: 35%
Grand Total: ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
12
4
3
100
8
8
Labor: 35%
PROGRAM OF WORK
A. Materials:
Quantity
20
4
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
30
50
5
2
1
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
2
2
4
4
Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
50
15
15
15
Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
53
10
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
650
4
4
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
16
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
24
6
1
3
6
15
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
15
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
20
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
MALONOY NATIONAL HIGH SCHOOL
Malonoy, Dao, Capiz
PROGRAM OF WORK
A. Materials:
Quantity
20
100
100
4
32
60
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
1
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
2
4
2
2
6
1
6
2
1
1
2
2
2
Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz
A. Materials:
Quantity
2¾
4
Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz
A. Materials:
Quantity
100
2
2
8
5
5
Labor 35%
B.
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
80
1
1
6
4
4
2
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
50
50
4
2
2
2
2
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
3
1
1
8
5
5
5
10
4
Labor 35%
B.
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
350
4
4
20
15
5
8
Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
350
4
4
20
15
5
8
Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
A. Materials:
Quantity
350
4
4
20
15
5
8
Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
30
600
2
2
2
2
100
2
5
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
25
5
5
27
20
3
1
1
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
Name of Project : Drip Irrigation Phase II
Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,014.00
A. Materials:
Quantity
25
5
3
1
1
Labor 35%
B.
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
10
5
4
8
100
2
Labor 35%
B.
Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
8
3
2
100
4
3
10
6
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
Name of Project : Repair of Entrance Gate Phase II
Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,500.00
A. Materials:
Quantity
8
3
2
100
4
3
10
6
Labor 35%
B.
Grand Total:
PROGRAM OF WORK
A. Materials:
Quantity
10
2
2
5
84.375
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
12
4
3
100
8
8
Labor 35%
B.
Grand Total:
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
A. Materials:
Quantity
5
10
3
2
2
Grand Total:
Prepared by:
RODRIGO O. BUIZON
Chairman, Physical Facility Committee
MASTER LIST
SUMMARY
Description
* Medical Kit Package
With:
a. Gauge Bandage
b. Inhaler
c. Ethel Alcohol
d. Bethadine
e. Paracetamol
f. Loperamide
g. Mask
h. Flash Light
i. Merthiolate
j. Thermometer
k. Pin
l. Elastic Bandage
m. Scissor
n. Cotton Buds
o. Cotton Applicator
p. Foreclip
q. Hot water bag system
r. Ice holder
S. Surgical Scissor
t. Hand globs
u. Burn Ointment
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
ting Facility
Description
Cement
Sand
Gravel
CHB
RSB 18mm
RSB 10mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
FABREAG
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Tabay
Cement
Sand
Gravel
GO O. BUIZON
hysical Facility Committee
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
ans of Perimeter Fence in the Garden
Description
Cement
CHB
Cyclone Wire 5x2x2x6m
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Chicken Dunges
Animal (Carabao) Waste
Rice Hull
Carbonized Rice Hull
Vermi-Cost (Compost)
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
ance of the Garden (Clearing, Weeding, Planting)
an sa Paaralan)
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
layan sa Paaralan)
Description
PVC Pipe ½
Teflon
Solvent
Elbow ½
Others
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
nd Concoctions
Description
Bamboo
CW#3
CW#2
Plywood ¼x4x8
2x2x8=32 wood
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Quantity
1
7
6
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
Nipa
CW#4
CW#3
CW#1
G.I Wire #18
CHB
Cement
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Pvc Pipe ½
Teflon
Solvent
Elbow ½
Others
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Pvc Pipe ½
Teflon
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
RSB 10mm
CHB
G.I Wire #18
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire # 18
G.I Corr 6x8
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Concoctions
Description
Bamboo
CW#3
CW#2
Plywood ¼xxx8
2x2x8=32 wood
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
osting Facility
Description
Cement
Sand
Gravel
CHB
RSB 8mm
RSB 10mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 8mm
Sand
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 8mm
Cement
CW #4
CW # 2½
CW # 1
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Sand
Gravel
PVC Drum
CW #18
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB
Cement
RSB 10mm
RSB 9mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Sand
Gravel
CHB
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 10mm
Cyclone Wire
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
G.I Pipe 1¼x6m S-40
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
2x2x8=64 wood
Marine Plywood ¼ x 4 x 8
G'.I Pipe 1¼ x6m S-40
Barbed Wire Large
G.1 Pipe #1x6m S-40
G.I Wire #16
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Description
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Unicon PDX #10
China Duplex # 6
P.E. Pipe ½
G.I Wire #18
RSB 12mmx60mm
P.E. Pipe 1
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Safety Breaker 30A
G.I Paucet ¾
PVC Ball Value 1"
Clayton Foot Valve
PVC Male 1"
Solvent
PVC Elbow ½
PVC Reducer 1x½
Teflon ½
Electric Tape Big
PVC Ball Valve ½
Lenox Blade
Plug Electric
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Flatcord #16
Jopex Faucet ½
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB#4
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB#4
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement
Plastic Drum
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
bamboo
Fine net
Com. Nail #4
Com. Nail #3
U Nails
Com. Nails #2
Tie wire #6
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Plastic Drum
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement
½ inch Atlanta pipe
½ elbow
faucet
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
Nipa
CW #4
CW #4
CW #1
G.I Wire #18
CHB
Cement
RSB
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
PVC Pipe ½
Teflon
Solvent
Elbow ½
others
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
PVC Pipe ½
Teflon
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
RSB 10mm
CHB
G.I Wire #18
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
G.I Cor 6x4
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
G.I Cor 6x4
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
CW #3
CW #2
Plywood ¼x4x8
2x2x8=32 wood
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 8mm
RSB 10mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 12 mm
RSB 9 mm
Welding Rod
Washed Sand
Washed Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
. Property Custodian
OC JR., EdD
M. PRECIOSA, JR.
chool Physical Facilities Chairman
. Property Custodian
UNIQUE TILES
Total LJ CONSTRUCTION SUPPLY
CORPORATION
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
16,200.00
16,200.00
Noted:
Unit Cost
1,000.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
900.00
230.00
500.00
900
Approved by:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
240.00
13.00
900.00
550.00
900.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
900.00
230.00
500.00
900.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
50.00
20.00
20.00
300.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32/bd.bt.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
6,800.00
252.49
250.30
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
230.00
500.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32bd.ft.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
78.00
40.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
78.00
230.00
38.00
42.00
46.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
500.00
900.00
1200.00
75.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
250.00
127.00
87.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
500.00
800.00
13.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
125.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
550.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
900.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
26.00
300.00
900.00
1,450.00
600.00
46.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
990.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
83.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
58.00
18.00
18.00
50.00
85.00
48.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
8,000.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
320.00
178.00
110.00
195.00
20.00
13.00
32.00
50.00
78.00
45.00
18.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
85.00
102.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
230.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
230.00
1200.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
40.00
70.00
70.00
70.00
120.00
70.00
75.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
1200.00
500.00
850.00
96.00
143.00
230.00
70.00
25.00
400.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
500.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
230.00
500.00
800.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32/bd.ft.
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
210.00
105.00
120.00
550.00
850.00
Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Department of Education
Region VI-Western Visayas
Division of Capiz
PROGRAM OF WORK
SUMMARY
Quantity Unit Description Unit Cost Total
0 0 - -
PURCHASE REQUEST
G.I. CORRUGATED
1 pcs. SHEET 4X8 FT. 15 ₱ 450.00 6,750.00
2 pcs. MARINE PLYWOOD 1/4 30 ₱ 575.00 17,250.00
3 pcs. WALL ANGLE 3 ₱ 75.00 225.00
4 box BLIND RIVET 1 ₱ 500.00 500.00
5 pcs. DRILL BIT 2 ₱ 90.00 180.00
6 0 - 0 ₱ - -
7 0 - 0 ₱ - -
- TOTAL ₱ 24,905.00
Purpose:
FOR REHABILITATION OF GRADE 8 CLASSROOM(ROOFING AND CEILING)
Signature :
Printed Name : HERNANDO M. PRECIOSA, JR. QUINTO L. TAGOC JR., EdD
Designation : Teacher I/Des. School Physical Facilities Chairman School Principal IV
Department of Education
Region VI – Western Visayas
DIVISION OF CAPIZ
Date: ___________________
CANVASS PAPER
Please quote your price for furnishing and delivering immediately the following supplies and materials and/or articles needed by
the office of the ______________________________________ for ________________________ under Req. and Issue Vouchers dated _____________.
QOUTATION
QUANTITY UNIT ARTICLES
UNIT PRICE TOTAL PRICE
0 0 -
0 0 -
0 0 -
0 0
0 0
0 0
0 0
It is requested that the quotation by you be actually your lowest price and should include delivery of supplies/Materials and/articles
to the site of work. Failure on the part of the deliver the supplies, materials/ or articles within ten (10) days from the date of the award,
a fine equivalent to 1/10 or 1% of the total valued of the said supplies, materials and/or articles will be imposed on the bidder from each day of delay.
It is requested that your proposal be enclosed in a sealed envelope and delivered to this Office to be opened at 9:00
o’clock A.M./P.M. on ___________________.
I hereby certify that the price above are the lowest price and that if acceptable by the government the supplies/materials and/or articles
shall be delivered immediately.
__________________________________________
Name and Signature of the Bidder
Department of Education
Region VI – Western Visayas
DIVISION OF CAPIZ
Roxas City
Abstract of Bids for furnishing _________________ for use in the office of the _________________ which was
Opened in the Office of the Supply Officer of the Malonoy National High School on __________ at ________.
BIDDERS PRICE
UNIQUE TILES
ARTICLES PALOMO CONSTRUCTION LJ CONSTRUCTION SUPPLY
CORPORATION
- ₱ - ₱ - ₱ -
- ₱ - ₱ - ₱ -
- ₱ - ₱ - ₱ -
- ₱ - ₱ - ₱ -
- ₱ - ₱ - ₱ -
- ₱ - ₱ - ₱ -
₱ - ₱ - ₱ -
₱ - ₱ -
₱ - ₱ -
0.00 -
We hereby certificate to the correctness of the above quotation of prices as per attached proposal of the above named bidders which were opened
in the presence of:
PURCHASE ORDER
MALONOY NATIONAL HIGH SCHOOL
Entity Name
7 0 - 0 ₱ - ₱ -
8 0 - 0 ₱ - ₱ -
9 0 - 0 ₱ - ₱ -
10 0 - 0 ₱ - ₱ -
11 0 - 0 ₱ - ₱ -
(Total Amount in Words) TWENTY FOUR THOUSAND NINE HUNDRED FIVE PESOS ONLY ₱ 24,905.00
In case of failure to make the full delivery within the time specified above, a penalty of one-tenth (1/10) of one percent for every day of delay shall be imposed on the
undelivered item/s.
INSPECTION ACCEPTANCE
Department of Education
MALONOY NATIONAL HIGH SCHOOL
0 0 -
0 0 -
0 0 -
0 0 -
0 0 -
0 0 -
-
Received by: Received from:
Teacher I/Des. School Physical Facilities Chairman Teacher II/Des. Property Custodian
Position/Office Position/Office
07/02/2021 07/02/2021
REQUISITION AND ISSUE SLIP
MALONOY NATIONAL HIGH SCHOOL
Agency
Purpose: Procurement of Senior HS printing materials for module production and other school documents.
List of Expenditures
Repair of School Facilities (see attached program of works) PHP 156,404.00
Repair of School Equipment
Office Supplies and Equipment (see attached list) PHP 126,449.82
Other Supplies (see attached list)
Printing and Publication
Water
Electricity PHP 20,040.00
Communication
Contract of Service (Janitorial and Security)
Travel
Others, please specify (attach separate sheet)
Labor and Wages PHP 54,735.40
Insurance Subscription PHP 11,680.00
TOTAL PHP 369,309.22
Requested by: Recommending Approval:
I hereby certify that I have checked the budgetary request and it is in
consonance with its School's AIP/APP.
this is to certify that the budgetary request have been decided collectively by the School Head, President of the
Teacher's Association and President of the Parents and Teachers Association (PTA)