Repainting of School Premises 2024

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 230

MASTER

SUPPLIER PALOMO CONSTRUCTION


ADDRESS DAYHAGON SIGMA, CAPIZ
TIN 266-218-160-000
Purpose BEAUTIFICATION OF FRONT OF ADMIN. BUILDING.
BIDDER 1 UNIQUE TILES CORPORATION
BIDDER 2 LJ CONSTRUCTION SUPPLY
Requested By HERNANDO M. PRECIOSA, JR.
Position Teacher I/Des. School Physical Fa
Approved By QUINTO L. TAGOC JR., EdD
Position School Principal IV
Name of Project BEAUTIFICATION OF FRONT OF ADMIN. BUILDING.
Project Location MALONOY NHS
Project Proponent ADMINISTRATION
Project Beneficiaries STUDENTS AND STAFF
Source Of Funds JUNIOR HS MOOE
Time Frame 2ND QUARTER
Budget Proposal ₱ 9,500.00
SUMMARY

Quantity Unit

5 cubic meter

5 cubic meter
TOTAL = (A+B)
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Labor and Wages of Each Program or Project


Project Location : Gulayan sa Paaralan
Project Proponent : TVL. Crop. Production
Project Beneficiaries : TVL. Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : Project
Budget Proposal : Drip Inrigation Installation
Repair of Entrance Gate
SUMMARY Construction of 100meter
Concreted Pathway
A
B
C

SUB TOTAL:

Prepared by:

Grand Total: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Procurement of Medical Kit


Project Location : Every Classroom
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 4,000.00

A. Materials
Quantity
4
SUB TOTAL: Prepared by:

Grand Total: ROGIE E. PARO, SR.


Focal Person
SDRRMC

Region VI-Western Visayas


Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK
Name of Project : Improvement of Vermi Composting Facility
Project Location : Gulayan sa Paaralan
Project Proponent : TVL. Crop. Production
Project Beneficiaries : TVL. Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 15,000.00

A. Materials
Quantity
10
6
4
100
8
10
SUB TOTAL:

Prepared by:

Grand Total: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : 100mm Contreted Pathway


Project Location : Gulayan sa Paaralan
Project Proponent : TVL. Crop. Production
Project Beneficiaries : TVL. Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 10,000.00

A. Materials
Quantity
10
5
4
8
100
2
SUB TOTAL:

Prepared by:

Grand Total: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Repair of Entrance Gate


Project Location : Gulayan sa Paaralan
Project Proponent : TVL. Crop. Production
Project Beneficiaries : TVL. Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 20,000.00

A. Materials
Quantity
16
6
4
200
8
6
20
12
SUB TOTAL:

Prepared by:

Grand Total: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK
SY. 2017-2018

Name of Project : Chicken House Construction


Project Location : Senior High School
Project Proponent : TVL. Animal Production
Project Beneficiaries : TVL. Animal Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php. 10,000.00

A. Materials
Quantity
30
600
2
2
2
2
100
2
5
SUB TOTAL:

Prepared by:

Grand Total: CHRISTOPHER G. FABREAG


Teacher
TVL. Animal Production
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK
SY. 2017-2018

Name of Project: Water System Installation


Location: Gulayan sa Paaralan
Phase: II
Cost: 28,228.00 Quantity
Source: SHS MOOE 15
2
4
Stock 4
1
2
3
4
SUB TOTAL:

B. LABOR: Prepared by:

Grand Total: RODRIGO O. BUIZON


Chairman, Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Phase II Additional Five Spans of Perimeter Fence in the Garden
Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri Crop Production
Project Beneficiaries : TVL-Agri-Crop Students
Source : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Quantity
29
198
A. Materials: 4
2
2

SUB TOTAL:

B. LABOR:

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Phase II Installation of Fifteen pcs. Culvert in the Deepwell.


Project Location : Senior High School
Project Proponent : Senior High School
Project Beneficiaries : Three Hundred Senior High School Students and Teachers
Source Of Funds : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Quantity
15
2
A. Materials: 4
Stock 4
1
2
3
4
SUB TOTAL:

B. LABOR:

Grand Total: RODRIGO O. BUIZON


Chairman
Prepared by: Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Greehouse Improvement


Project Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri-Crop Producrion
Project Beneficiaries : TVL-Agri-Crop Students
Source Of Funds : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Quantity
100
30
A. Materials: 100
Stock 100
1 15
2
3
4
5
SUB TOTAL:

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Labor and Wages for the Maintenance of the Garden (Clearing, Weeding, Planting)
Project Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri-Crop Producrion (Gulayan sa Paaralan)
Project Beneficiaries : TVL-Agri-Crop Students and Teachers
Source Of Funds : SHS MOOE 2017
Time Frame : July to September, 2017
Budget Proposal : Php. 10,800.00

No. of Laborer : 2
Rate per Day : 250
No. of Days Work : 21.6 days
21.6DAYS X 250X2 = Php. 10,800.00

ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Drip Irrigation Installation


Location : Greenhouse
Project Proponent : TVL-Agri Crop Production (Gulayan sa Paaralan)
Project Beneficiaries : TVL-Agri-Crop Students
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Quantity
50
10
A. Materials: 5
Stock 27
1 20
2 6
3 2
4 2
5
6
7
8
SUB TOTAL:

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Storage Facility for Tools and Concoctions


Location : Gulayan sa Paaralan
Project Proponent : TVL-Agri Crop Production
Project Beneficiaries : TVL-Agri-Crop Students
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Quantity
10
2
A. Materials: 2
Stock 5
1 84.375
2
3
4
5
SUB TOTAL:

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

LIST OF OTHER SUPPLIES

Name of School : MALONOY NATIONAL HIGH SCHOOL


District : Dao
For the Month of : October to December, 2017

Unit
Unit
Ream
Ream
SUB TOTAL:

Grand Total:
ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Chicken House Construction


Location : Senior High School
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
30
600
2
2
2
2
100
2
5
SUB TOTAL:

Labor: 35%

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Drip Irrigation Phase 1


Location : Green House
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.13,980.00

A. Materials:
Quantity
25
5
5
27
20
3
1
1
SUB TOTAL:

Labor: 35%

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Drip Irrigation Phase II


Location : Green House
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.13,014.00

A. Materials:
Quantity
25
5
3
1
1

Labor: 35%
Grand Total: ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : 100m Concreted Pathway Phase I


Location : Gulayan sa Paaralan
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
10
5
4
8
100
2

Labor: 35%

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Repair of Entrance Gate Phase II


Location : Gulayan sa Paaralan
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
8
3
2
100
4
3
10
6

Labor: 35%

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Storage Facility for Toals and Concoctions


Location : Gulayan sa Paaralan
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.6,750.00

A. Materials:
Quantity
10
2
2
5
84.375

Labor: 35%
Grand Total: ROGIE E. PARO, SR.
Manager
Prepared by: Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Improvement of Vermi Composting Facility


Location : Gulayan sa Paaralan
Source : SHS MOOE 2017
Time Frame : October to December, 2017
Budget Proposal : Php.14,715.00

A. Materials:
Quantity
12
4
3
100
8
8

Labor: 35%

Grand Total: ROGIE E. PARO, SR.


Manager
Prepared by: Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 1,720.00

A. Materials:
Quantity
20
4

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 14,160.00

A. Materials:
Quantity
30
50
5
2
1
Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Phase I Water Supply Installation


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 7,900.00

A. Materials:
Quantity
2
2
4
4

Grand Total:

RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Water Supply Installation


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 7,610.00

A. Materials:
Quantity
50
15
15
15

Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 10,400.00
A. Materials:
Quantity
4
4
400

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 14,625.00

A. Materials:
Quantity
53
10

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 13,850.00

A. Materials:
Quantity
650
4
4

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 14,400.00

A. Materials:
Quantity
16

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 13,004.00

A. Materials:
Quantity
24
6
1
3
6
15

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Water Supply Installation


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017

Budget Proposal : Php. 14,850.00

A. Materials:
Quantity
15

Grand Total:

Prepared by: RODRIGO O. BUIZON


Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Perimeter Fence


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php. 1,660.00

A. Materials:
Quantity
20

Grand Total:

Prepared by: ROGIE E. PARO, SR.


Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz
MALONOY NATIONAL HIGH SCHOOL
Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Installation of Water System


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php.13,760.00

A. Materials:
Quantity
20
100
100
4
32
60

Grand Total:

Prepared by: RODRIGO O. BUIZON


Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Installation of Water System


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php.8,000.00

A. Materials:
Quantity
1

Grand Total:

Prepared by: RODRIGO O. BUIZON


Chairman
Physical Facility Committee
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Installation of Water System


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php.2,606.00

A. Materials:
Quantity
2
4
2
2
6
1
6
2
1
1
2
2
2

Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz
PROGRAM OF WORK

Name of Project : Installation of Water System


Project Location : Senior High School Bldg.
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : January to June 2017
Budget Proposal : Php.493.00

A. Materials:
Quantity

4

Grand Total:
RODRIGO O. BUIZON
Prepared by: Chairman
Physical Facility Committee

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz
PROGRAM OF WORK

Name of Project : Hands/Foot Wash Stand


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php. 8,954.55

A. Materials:
Quantity
100
2
2
8
5
5

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Products Washing Facility


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.9,258.30

A. Materials:
Quantity
80
1
1
6
4
4
2

Labor 35%
B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Plants Nursery Repair


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.8,437.50

A. Materials:
Quantity
50
50
4
2
2
2
2

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Comfort Room Repair


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,207.05

A. Materials:
Quantity
3
1
1
8
5
5
5
10
4

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : 20m Concrete Drainage Phase 3


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.14,910.00

A. Materials:
Quantity
350
4
4
20
15
5
8
Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : 20m Concrete Drainage Phase 1


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.14,910.00

A. Materials:
Quantity
350
4
4
20
15
5
8

Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz
PROGRAM OF WORK

Name of Project : 20m Concrete Drainage Phase 2


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.14,910.00

A. Materials:
Quantity
350
4
4
20
15
5
8

Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Chicken House Construction


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
30
600
2
2
2
2
100
2
5

Labor 35%

B.
Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Drip Irrigation Phase I


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,986.00

A. Materials:
Quantity
25
5
5
27
20
3
1
1

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK
Name of Project : Drip Irrigation Phase II
Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,014.00

A. Materials:
Quantity
25
5
3
1
1

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : 100m Concreted Pathway Phase I


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
10
5
4
8
100
2

Labor 35%

B.

Grand Total:
ROGIE E. PARO, SR.
Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Repair of Entrance Gate Phase I


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
8
3
2
100
4
3
10
6

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK
Name of Project : Repair of Entrance Gate Phase II
Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.13,500.00

A. Materials:
Quantity
8
3
2
100
4
3
10
6

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Storage Facility for Tools and Concoctions


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.6,750

A. Materials:
Quantity
10
2
2
5
84.375

Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Improvement of Vermi Composting Facility


Project Location : Gulayan sa Paaralan
Project Proponent : Senior High School
Project Beneficiaries : Senior High School Students
Source Of Funds : SHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.14,715.00

A. Materials:
Quantity
12
4
3
100
8
8
Labor 35%

B.

Grand Total:

ROGIE E. PARO, SR.


Prepared by: Manager
Gulayan sa Paaralan

Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

PROGRAM OF WORK

Name of Project : Water Tank Stand (Phase I)


Project Location : Gulayan sa Paaralan
Project Proponent : Junior High School
Project Beneficiaries : Malonoy National High School Students
Source Of Funds : JHS MOOE 2017
Time Frame : October to December 2017
Budget Proposal : Php.5,260.00

A. Materials:
Quantity
5
10
3
2
2

Grand Total:

Prepared by:

RODRIGO O. BUIZON
Chairman, Physical Facility Committee
MASTER LIST

F FRONT OF ADMIN. BUILDING.


PORATION

Acceptance: MARIA C. BALAGAY


Position Teacher II/Des. Property Custodian
Inspection: QUINTO L. TAGOC JR., EdD
Position School Principal IV
F FRONT OF ADMIN. BUILDING.
Received by HERNANDO M. PRECIOSA, JR.
Teacher I/Des. School Physical Facilities Chairman
Received From MARIA C. BALAGAY
Teacher II/Des. Property Custodian

SUMMARY

Description Unit Cost

WASHED GRAVEL 1,100.00

WASHED SAND 800.00


ch Program or Project
Cost of Materials
Php. 20,000.00
Php.20,000.00
Php.10,000.00

LARRY P. CASTILLO, M. Ed.


Secondary School Principal III

Description
* Medical Kit Package
With:
a. Gauge Bandage
b. Inhaler
c. Ethel Alcohol
d. Bethadine
e. Paracetamol
f. Loperamide
g. Mask
h. Flash Light
i. Merthiolate
j. Thermometer
k. Pin
l. Elastic Bandage
m. Scissor
n. Cotton Buds
o. Cotton Applicator
p. Foreclip
q. Hot water bag system
r. Ice holder
S. Surgical Scissor
t. Hand globs
u. Burn Ointment

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Composting Facility

Description
Cement
Sand
Gravel
CHB
RSB 18mm
RSB 10mm

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18

LARRY P. CASTILLO, M. Ed.


Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
G.I Corr.6x4
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
N.pa
CW.#4
CW.#3
CW # 1
G.I Wire #8
CHB
Cement
RSB 8mm

FABREAG

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Tabay
Cement
Sand
Gravel

GO O. BUIZON
hysical Facility Committee

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
ve Spans of Perimeter Fence in the Garden

Description
Cement
CHB
Cyclone Wire 5x2x2x6m
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

of Fifteen pcs. Culvert in the Deepwell.

High School Students and Teachers


Description
Culvert (Tabay)
Cement
Sand
Gravel

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Chicken Dunges
Animal (Carabao) Waste
Rice Hull
Carbonized Rice Hull
Vermi-Cost (Compost)

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Maintenance of the Garden (Clearing, Weeding, Planting)

(Gulayan sa Paaralan)
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

on (Gulayan sa Paaralan)
Description
PVC Pipe ½
Teflon
Solvent
Elbow ½
Others
Cement
Sand
Gravel

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
ools and Concoctions

Description
Bamboo
CW#3
CW#2
Plywood ¼x4x8
2x2x8=32 wood

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
L HIGH SCHOOL
Quantity
1
7
6
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
Nipa
CW#4
CW#3
CW#1
G.I Wire #18
CHB
Cement
RSB 8mm

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Pvc Pipe ½
Teflon
Solvent
Elbow ½
Others
Cement
Sand
Gravel

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Pvc Pipe ½
Teflon
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

way Phase I

Description
Cement
Sand
Gravel
RSB 10mm
CHB
G.I Wire #18

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire # 18
G.I Corr 6x8
RSB 8mm

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
als and Concoctions

Description
Bamboo
CW#3
CW#2
Plywood ¼xxx8
2x2x8=32 wood
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Composting Facility
Description
Cement
Sand
Gravel
CHB
RSB 8mm
RSB 10mm

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 8mm
Sand

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 8mm
Cement
CW #4
CW # 2½
CW # 1
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Sand
Gravel
PVC Drum
CW #18

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB
Cement
RSB 10mm
RSB 9mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
Sand
Gravel
CHB

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
RSB 10mm
Cyclone Wire

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
G.I Pipe 1¼x6m S-40
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
2x2x8=64 wood
Marine Plywood ¼ x 4 x 8
G'.I Pipe 1¼ x6m S-40
Barbed Wire Large
G.1 Pipe #1x6m S-40
G.I Wire #16

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description

RC Pipe (Tabay) 36x20


LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Unicon PDX #10
China Duplex # 6
P.E. Pipe ½
G.I Wire #18
RSB 12mmx60mm
P.E. Pipe 1

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description

Pedrollo Electric Motor I HP

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Safety Breaker 30A
G.I Paucet ¾
PVC Ball Value 1"
Clayton Foot Valve
PVC Male 1"
Solvent
PVC Elbow ½
PVC Reducer 1x½
Teflon ½
Electric Tape Big
PVC Ball Valve ½
Lenox Blade
Plug Electric

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Flatcord #16
Jopex Faucet ½

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB#4
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB#4
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement
Plastic Drum
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
bamboo
Fine net
Com. Nail #4
Com. Nail #3
U Nails
Com. Nails #2
Tie wire #6
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Plastic Drum
Sand
Gravel
Cor. Bar 9mm
Cor. Bar 10mm
Cement
½ inch Atlanta pipe
½ elbow
faucet

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
CHB #4
Sand
Gravel
9mm cor. Bar
10mm cor. Bar
Tie Wire #18
2x2x8 cocolumber

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Bamboo
Nipa
CW #4
CW #4
CW #1
G.I Wire #18
CHB
Cement
RSB
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
PVC Pipe ½
Teflon
Solvent
Elbow ½
others
Cement
Sand
Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
PVC Pipe ½
Teflon
Cement
Sand
Gravel

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
RSB 10mm
CHB
G.I Wire #18
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
G.I Cor 6x4
RSB 8mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Description
Cement
Sand
Gravel
CHB
RSB 10mm
G.I Wire #18
G.I Cor 6x4
RSB 8mm

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
and Concoctions

Description
Bamboo
CW #3
CW #2
Plywood ¼x4x8
2x2x8=32 wood
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

mposting Facility

Description
Cement
Sand
Gravel
CHB
RSB 8mm
RSB 10mm
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

School Students

Description
RSB 12 mm
RSB 9 mm
Welding Rod
Washed Sand
Washed Gravel
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
. Property Custodian
OC JR., EdD

M. PRECIOSA, JR.
chool Physical Facilities Chairman

. Property Custodian

UNIQUE TILES
Total LJ CONSTRUCTION SUPPLY
CORPORATION

5,500.00 1,200.00 6,000.00 1,300.00 6,500.00

4,000.00 900.00 4,500.00 1,000.00 5,000.00

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -
- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

₱ 9,500.00 10,500.00 11,500.00


Labor
7,000.00
7,000.00
2,200.00

16,200.00

16,200.00

Noted:

LARRY P. CASTILLO, M. Ed.


Secondary School Principal III

Unit Cost
1,000.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00

Noted:

LARRY P. CASTILLO, M. Ed.


Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
900.00
230.00
500.00
900

Approved by:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
240.00
13.00
900.00
550.00
900.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
900.00
230.00
500.00
900.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
50.00
20.00
20.00
300.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
800.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32/bd.bt.

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
6,800.00
252.49
250.30

Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
800.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
230.00
500.00
800.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32bd.ft.
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
78.00
40.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
78.00
230.00
38.00
42.00
46.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
500.00
900.00
1200.00
75.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
250.00
127.00
87.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
500.00
800.00
13.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
125.00
800.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
550.00
800.00

Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
900.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
26.00
300.00
900.00
1,450.00
600.00
46.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost

990.00

Noted:
LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
83.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
58.00
18.00
18.00
50.00
85.00
48.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
8,000.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
320.00
178.00
110.00
195.00
20.00

13.00
32.00
50.00
78.00
45.00
18.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
85.00
102.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
230.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
230.00
1200.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
40.00
70.00
70.00
70.00
120.00
70.00
75.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
1200.00
500.00
850.00
96.00
143.00
230.00
70.00
25.00
400.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
13.00
500.00
850.00
96.00
143.00
75.00
25/bd.ft.

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
50.00
10.00
46.00
48.00
50.00
30.00
13.00
230.00
78.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
300.00
30.00
50.00
10.00
10.00
230.00
500.00
500.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
300.00
30.00
230.00
500.00
800.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
75.00
13.00
50.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
230.00
500.00
800.00
13.00
230.00
30.00
230.00
75.00

Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Unit Cost
30.00
48.00
50.00
361.00
32/bd.ft.
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
230.00
500.00
800.00
13.00
75.00
230.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III

Unit Cost
210.00
105.00
120.00
550.00
850.00
Noted:

LARRY P. CASTILLO,M.Ed.
Secondary School Principal III
Republic of the Philippines
Department of Education
Region VI - Western Visayas
SCHOOLS DIVISION OF CAPIZ
District of Dao

'Project: REPAINTING OF PLANT BOXES, STAIRS AND OUTSIDE OF FACULTY ROOM.


Location: MALONOY, DAO, CAPIZ
Name of School: MALONOY NATIONAL HIGH SCHOOL

ACTUAL ADDITIONAL UNIT COST TOTAL COST


ITEM NO. DESCRIPTION UNIT SUB-TOTAL
DELIVERED ORDER MATERIAL MATERIAL
1STY1CL DepEd Standard School Building / Building No.6
I Painting Works
SKIM COAT bag 1 - 1 577.00 577.00
RAW SIENNA LATEX PAINT liters 6 2 8 160.00 1,280.00
HANZA YELLOW LATEX PAINT liters 4 2 6 175.00 1,050.00
THOLUDINE RED LATEX PAINT liters 4 2 6 175.00 1,050.00
THALO BLUE LATEX PAINT liters 4 2 6 175.00 1,050.00
LAMP BLACK LATEX PAINT liters 4 - 4 160.00 640.00
VENETIAN RED LATEX PAINT liters 2 - 2 175.00 350.00
ACRYLIC EMULSION gallon 1 1 2 650.00 1,300.00
ROYAL BLUE ENAMEL liter 1 - 1 285.00 285.00
LEMON YELLOW ENAMEL liter 1 - 1 285.00 285.00
PAINT THINNER gallon 1 - 1 400.00 400.00
WATER PROOFING PAINT gallon 3 3 790.00 2,370.00
FLAT LATEX pail 2 2 2,785.00 5,570.00
6" PAINT ROLLER pcs. 2 2 90.00 180.00
BABY ROLLER pcs. 3 3 60.00 180.00
4" PAINT BRUSH pcs. 2 2 130.00 260.00
2" PAINT BRUSH pcs. 2 2 55.00 110.00
PAINT PALETTE pc. 1 1 195.00 195.00
PAINT SCRAPER pcs. 2 2 195.00 390.00

Sub-total 17,522.00
II Labor Cost
No. of
Manpower No. of Days Labor Rate
Workers
Painter 1 5.00 700.00 3,500.00
Laborer 2 5.00 350.00 3,500.00
Sub-total 7,000.00

III DIRECT COST 24,522.00

Prepared by: Validated by:

HERWINA JOY P. DEL ROSARIO ENGR. MARLON V. CLARITO


Physical Facilities Coordinator DepED Division Engineer

Noted by: Approved by:

QUINTO L. TAGOC JR., EdD EDNA B. AZCARRAGA, PhD


School Head SGOD, Chief
Republic of the Philippines
Department of Education
Region VI - Western Visayas
SCHOOLS DIVISION OF CAPIZ
District of Dao

'Project: REPAINTING OF PLANT BOXES, STAIRS AND OUTSIDE OF FACULTY ROOM.


Location: MALONOY, DAO, CAPIZ
Name of School: MALONOY NATIONAL HIGH SCHOOL

ACTUAL ADDITIONAL UNIT COST TOTAL COST


ITEM NO. DESCRIPTION UNIT SUB-TOTAL
DELIVERED ORDER MATERIAL MATERIAL
1STY1CL DepEd Standard School Building / Building No.6
I Painting Works
SKIM COAT bag 1 - 1 577.00 577.00
RAW SIENNA LATEX PAINT liters 6 2 8 160.00 1,280.00
HANZA YELLOW LATEX PAINT liters 4 2 6 175.00 1,050.00
THOLUDINE RED LATEX PAINT liters 4 2 6 175.00 1,050.00
THALO BLUE LATEX PAINT liters 4 2 6 175.00 1,050.00
LAMP BLACK LATEX PAINT liters 4 - 4 160.00 640.00
VENETIAN RED LATEX PAINT liters 2 - 2 175.00 350.00
ACRYLIC EMULSION gallon 1 1 2 650.00 1,300.00
ROYAL BLUE ENAMEL liter 1 - 1 285.00 285.00
LEMON YELLOW ENAMEL liter 1 - 1 285.00 285.00
PAINT THINNER gallon 1 - 1 400.00 400.00
WATER PROOFING PAINT gallon 3 3 790.00 2,370.00
FLAT LATEX pail 2 2 - -
6" PAINT ROLLER pcs. 2 2 90.00 180.00
BABY ROLLER pcs. 3 3 60.00 180.00
4" PAINT BRUSH pcs. 2 2 130.00 260.00
2" PAINT BRUSH pcs. 2 2 55.00 110.00
PAINT PALETTE pc. 1 1 195.00 195.00
PAINT SCRAPER pcs. 2 2 195.00 390.00

Sub-total 11,952.00
II Labor Cost
No. of
Manpower No. of Days Labor Rate
Workers
Painter 1 5.00 700.00 3,500.00
Laborer 2 5.00 350.00 3,500.00
Sub-total 7,000.00

III DIRECT COST 18,952.00

Prepared by: Validated by:

HERWINA JOY P. DEL ROSARIO ENGR. MARLON V. CLARITO


Physical Facilities Coordinator DepED Division Engineer

Noted by: Approved by:

QUINTO L. TAGOC JR., EdD EDNA B. AZCARRAGA, PhD


School Head SGOD, Chief
PALOMO CONSTRUCTION
TIN: 266-218-160-000

GROSS AMOUNT (A) 11,952.00


Comp.
(Grossx100)/112 (B) 10,671.43
1601-E WC640 (C) 1% 106.71
1600 WV010 (D) 5% 533.57
TOTAL TAX (E) 640.29

(A-E) ADA PAYMENT 11,311.71


Republic of the Philippines
Department of Education
Region VI - Western Visayas
SCHOOLS DIVISION OF CAPIZ
District of Dao

Project: REPAINTING OF PLANT BOXES, STAIRS AND OUTSIDE OF FACULTY ROOM.


Location: MALONOY, DAO, CAPIZ
Name of School: MALONOY NATIONAL HIGH SCHOOL

UNIT COST TOTAL COST


ITEM NO. DESCRIPTION UNIT QTY
MATERIAL MATERIAL
I Painting Works
SKIM COAT bag 1 577.00 577.00
RAW SIENNA LATEX PAINT liters 8 160.00 1,280.00
HANZA YELLOW LATEX PAINT liters 6 175.00 1,050.00
THOLUDINE RED LATEX PAINT liters 6 175.00 1,050.00
THALO BLUE LATEX PAINT liters 6 175.00 1,050.00
LAMP BLACK LATEX PAINT liters 4 160.00 640.00
VENETIAN RED LATEX PAINT liters 2 175.00 350.00
ACRYLIC EMULSION gallon 2 650.00 1,300.00
ROYAL BLUE ENAMEL liter 1 285.00 285.00
LEMON YELLOW ENAMEL liter 1 285.00 285.00
PAINT THINNER gallon 1 400.00 400.00
WATER PROOFING PAINT gallon 3 790.00 2,370.00
FLAT LATEX pail 2 2,785.00 5,570.00
6" PAINT ROLLER pcs. 2 90.00 180.00
BABY ROLLER pcs. 3 60.00 180.00
4" PAINT BRUSH pcs. 2 130.00 260.00
2" PAINT BRUSH pcs. 2 55.00 110.00
PAINT PALETTE pc. 1 195.00 195.00
PAINT SCRAPER pcs. 2 195.00 390.00

Sub-total 17,522.00
II Labor Cost
No. of
Manpower No. of Days Labor Rate
Workers
Painter 1 5.00 700.00 3,500.00
Laborer 2 5.00 350.00 3,500.00
Sub-total 7,000.00

III DIRECT COST 24,522.00

Prepared by: Validated by:

HERWINA JOY P. DEL ROSARIO ENGR. MARLON V. CLARITO


Physical Facilities Coordinator DepED Division Engineer

Noted by: Approved by:

QUINTO L. TAGOC JR., EdD EDNA B. AZCARRAGA, PhD


School Head SGOD, Chief
Republic of the Philippines
Department of Education
Region VI - Western Visayas
SCHOOLS DIVISION OF CAPIZ
District of Dao

Project: Provision/Enhancement of Faculty Room, Plant Boxes and Waiting Shed


Location: Dao, Capiz
Name of School: DAO ES

ITEM NO. DESCRIPTION UNIT QTY

I. School Grounds & Perimeter


Painting Works

Sub-total

II. Workers Wages


No. of
Manpower No. of Days
Workers
Carpenter
Painter
Laborer
Sub-total

III. DIRECT COST

Prepared by:
Physical Facilities Coordinator

Noted by:

School Head
on
Z

MATERIALS COST
Unit Cost Total Cost

-
-
-
-
-
-
-
-
-
-
-
0.00 0.00

LABOR COST

Labor Rate Total Labor Rate

500.00 -
500.00 -
400.00 -
0.00 0.00

Validated by:

ENGR. MARLON V. CLARITO


DepED Division Engineer

Approved by:

SGOD, Chief
Department of Education
Region VI-Western Visayas
Division of Capiz

MALONOY NATIONAL HIGH SCHOOL

PROGRAM OF WORK

Name of Project : BEAUTIFICATION OF FRONT OF ADMIN. BUILDING.


Project Location : MALONOY NHS
Project Proponent : ADMINISTRATION
Project Beneficiaries : STUDENTS AND STAFF
Source Of Funds : JUNIOR HS MOOE
Time Frame : 2ND QUARTER
Budget Proposal : ₱ 11,500.00

SUMMARY
Quantity Unit Description Unit Cost Total

5 cubic meter WASHED GRAVEL 1,100.00 5,500.00


5 cubic meter WASHED SAND 800.00 4,000.00

0 0 - - -
0 0 - - -

0 0 - -

A. TOTAL MATERIALS ₱ 9,500.00


₱ -
B. LABOR COST: LABORER ( 5 days x P 400.00/day) ₱ 2,000.00
₱ -
TOTAL = (A+B) ₱ 11,500.00
.
Prepared by: Noted:

HERNANDO M. PRECIOSA, JR. QUINTO L. TAGOC JR., EdD


Teacher I/Des. School Physical Facilities Chairman School Principal IV
Appendix 60

PURCHASE REQUEST

Entity Name: MALONOY NATIONAL HIGH SCHOOL Fund Cluster: 01101101


Office/Section : PR No.: ______________ Date:

MALONOY NHS Responsibility Center Code : 0710906155


Stock/ Property
Unit Item Description Quantity Unit Cost Total Cost
No.

1 cubic meter WASHED GRAVEL 5 ₱ 1,100.00 5,500.00

2 cubic meter WASHED SAND 5 ₱ 800.00 4,000.00

- TOTAL ₱ 9,500.00
Purpose:
BEAUTIFICATION OF FRONT OF ADMIN. BUILDING.

Requested by: Approved by:

Signature :
Printed Name : HERNANDO M. PRECIOSA, JR. LEORICO G. FUNDAL
Designation : Teacher I School Principal IV
Department of Education
Region VI – Western Visayas
DIVISION OF CAPIZ

Date: ___________________

CANVASS PAPER
Please quote your price for furnishing and delivering immediately the following supplies and materials and/or articles needed by
the office of the ______________________________________ for ________________________ under Req. and Issue Vouchers dated _____________.

QOUTATION
QUANTITY UNIT ARTICLES
UNIT PRICE TOTAL PRICE

5 cubic meter WASHED GRAVEL


5 cubic meter WASHED SAND

0 0 -
0 0 -

0 0 -

0 0 -

0 0 -

0 0

0 0

0 0

0 0

It is requested that the quotation by you be actually your lowest price and should include delivery of supplies/Materials and/articles
to the site of work. Failure on the part of the deliver the supplies, materials/ or articles within ten (10) days from the date of the award,
a fine equivalent to 1/10 or 1% of the total valued of the said supplies, materials and/or articles will be imposed on the bidder from each day of delay.

It is requested that your proposal be enclosed in a sealed envelope and delivered to this Office to be opened at 9:00
o’clock A.M./P.M. on ___________________.

QUINTO L. TAGOC JR., EdD


School Principal IV

I hereby certify that the price above are the lowest price and that if acceptable by the government the supplies/materials and/or articles
shall be delivered immediately.

__________________________________________
Name and Signature of the Bidder
Department of Education
Region VI – Western Visayas
DIVISION OF CAPIZ
Roxas City

Abstract of Bids for furnishing _________________ for use in the office of the _________________ which was
Opened in the Office of the Supply Officer of the Malonoy National High School on __________ at ________.

BIDDERS PRICE
UNIQUE TILES
ARTICLES PALOMO CONSTRUCTION LJ CONSTRUCTION SUPPLY
CORPORATION

WASHED GRAVEL ₱ 1,100.00 ₱ 1,200.00 ₱ 1,300.00

WASHED SAND ₱ 800.00 ₱ 900.00 ₱ 1,000.00

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

- ₱ - ₱ - ₱ -

₱ - ₱ - ₱ -

₱ - ₱ -

₱ - ₱ -

0.00 -

We hereby certificate to the correctness of the above quotation of prices as per attached proposal of the above named bidders which were opened
in the presence of:

MARIA C. BALAGAY MA. RHEA M. BUIZON


School Property Custodian School Treasurer/ Disbursing Officer

APPROVED for the purpose, as checked above.

QUINTO L. TAGOC JR., EdD PALOMO CONSTRUCTION


School Head Name of Bidder Resident Auditor
Appendix 61

PURCHASE ORDER
MALONOY NATIONAL HIGH SCHOOL
Entity Name

Supplier : PALOMO CONSTRUCTION P.O. No. : ____________________________

Address : DAYHAGON SIGMA, CAPIZ Date : _______________________________


TIN : 266-218-160-000 Mode of Procurement : CASH
Gentlemen:
Please furnish this Office the following articles subject to the terms and conditions contained herein:

Place of Delivery : ___________________________________ Delivery Term : ________________________


Date of Delivery : ____________________________________ Payment Term : ________________________
Stock/ Property Payment Term : __
Unit Description Quantity Amount
No.

1 cubic meter WASHED GRAVEL 5 ₱ 1,100.00 ₱ 5,500.00


2 cubic meter WASHED SAND 5 ₱ 800.00 ₱ 4,000.00
3 0 - 0 ₱ - ₱ -
4 0 - 0 ₱ - ₱ -
5 0 - 0 ₱ - ₱ -
6 0 - 0 ₱ - ₱ -

7 0 - 0 ₱ - ₱ -

8 0 - 0 ₱ - ₱ -

9 0 - 0 ₱ - ₱ -

10 0 - 0 ₱ - ₱ -

11 0 - 0 ₱ - ₱ -

(Total Amount in Words) NINE THOUSAND FIVE HUNDRED PESOS ONLY ₱ 9,500.00

In case of failure to make the full delivery within the time specified above, a penalty of one-tenth (1/10) of one percent for every day of delay shall be imposed on the
undelivered item/s.

Conforme: Very truly yours,

PALOMO CONSTRUCTION QUINTO L. TAGOC JR., EdD


Signature over Printed Name of Supplier Signature over Printed Name of Authorized Official
07/02/2021 School Principal IV
Date Designation

Fund Cluster : 01101101 ORS/BURS No. : ______________________


Funds Available : ₱ 9,500.00 Date of the ORS/BURS: _______________

MA. RUBY E. BRIÑOSA Amount : ₱ 9,500.00


Signature over Printed Name of Chief Accountant/Head of Accounting Division/Unit
INSPECTION AND ACCEPTANCE REPORT
Department of Education
(Agency)

Supplier PALOMO CONSTRUCTION IAR No.


PO No. _____________ Date ______________________ Invoice No.______________________ Date:
_________________
Requesting Office/Dept. Malonoy National High School___________________
Stock
Unit Description Quantity
No.
1 cubic meter WASHED GRAVEL 5
2 cubic meter WASHED SAND 5
3 0 - 0
4 0 - 0
5 0 - 0
6 0 - 0
7 0 - 0
8 0 - 0
9 0 - 0
10 0 - 0
11 0 - 0
-

INSPECTION ACCEPTANCE

Date Inspected: Date Received:


_____________________________
__________
Inspected, verified and found OK Complete ____________
as to quantity and specifications. Partial ____________
(Pls. Specify Quantity) ____________

QUINTO L. TAGOC JR., EdD


School Principal IV MARIA C. BALAGAY
Teacher II/Des. Property Custodian

For Property Office Use.


ACKNOWLEDGEMENT RECEIPT

Department of Education
MALONOY NATIONAL HIGH SCHOOL

Quantity Unit Description Property No.

5 cubic meter WASHED GRAVEL

5 cubic meter WASHED SAND

0 0 -

0 0 -

0 0 -

0 0 -

0 0 -

0 0 -

0 0 -

0 0 -

0 0 -

-
Received by: Received from:

HERNANDO M. PRECIOSA, JR. MARIA C. BALAGAY


Signature Over Printed Name Signature Over Printed Name

Teacher I/Des. School Physical Facilities Chairman Teacher II/Des. Property Custodian
Position/Office Position/Office

07/02/2021 07/02/2021
REQUISITION AND ISSUE SLIP
MALONOY NATIONAL HIGH SCHOOL
Agency

Malonoy National High School Responsibility Center No.


Dao, Capiz Code 070010906133 Date:
Requisition Issuance
Stock Unit Description Quantity Quantity Remarks
1 pcs. T664 YELLOW 3 3 complete
2 pcs. T664 MAGENTA 3 3 complete
3 pcs. T664 CYAN 3 3 complete

Purpose: Procurement of Senior HS printing materials for module production and other school documents.

Requested by: Approved by: Issued by: Received by:


Signature
Printed
Name BRENDA A. BAYLON LEORICO G. FUNDAL MARIA C. BALAGAY BRENDA A. BAYLON
Designation
Date T-II School Principal IV T-II/Des. Property Custodian T-II
Republic of the Philippines
Department of Education
Region VI-Western Visayas
DIVISION OF CAPIZ
Banica, Roxas City

MALONOY NATIONAL HIGH SCHOOL


Malonoy, Dao, Capiz

REQUEST FOR CASH ADVANCE


For the Month of October to December, 2017

List of Expenditures
Repair of School Facilities (see attached program of works) PHP 156,404.00
Repair of School Equipment
Office Supplies and Equipment (see attached list) PHP 126,449.82
Other Supplies (see attached list)
Printing and Publication
Water
Electricity PHP 20,040.00
Communication
Contract of Service (Janitorial and Security)
Travel
Others, please specify (attach separate sheet)
Labor and Wages PHP 54,735.40
Insurance Subscription PHP 11,680.00
TOTAL PHP 369,309.22
Requested by: Recommending Approval:
I hereby certify that I have checked the budgetary request and it is in
consonance with its School's AIP/APP.

LARRY P. CASTILLO, M.Ed. MARLON P. DESTREZA. Ed. D.


Secondary School Principal III Chief, School Governance and Operations Division

this is to certify that the budgetary request have been decided collectively by the School Head, President of the
Teacher's Association and President of the Parents and Teachers Association (PTA)

ROGIO E. PARO, SR. ANABELLA O. ERIBAL


President, Teacher's Association President, PTA
Approved:

MIGUEL MAC D. APOSIN, Ed. D., CESO V


Schools Division Superintendent

You might also like