ACHIEVEMENT CHART

QUALIFICATION: EVENTS MANAGEMENT SERVICES NCIII

PLAN AND DEVELOP DEVELOP SELECT DEVELOP AND PROVIDE ON- DEVELOP AND MANAGE
DEVELOP AN EVENT EVENT UPDATE EVENT SITE EVENT UPDATE CONTRACTORS
NAME OF TRAINEES EVENT EVENT PROGRAM VENUE AND INDUSTRY MANAGEMENT KNOWLEDGE ON FOR INDOOR
PROPOSAL OR CONCEPT SITE KNOWLEDGE SERVICES PROTOCOL EVENTS
BID
C 1 2 3 4 C 1 2 C 1 2 3 C 1 2 3 C 1 2 3 4 C 1 2 3 4 C 1 2 2 3 C 1 2 2 3

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
LEGEND:

PLAN AND DEVELOP AN DEVELOP EVENT SELECT EVENT DEVELOP AND PROVIDE ON-SITE DEVELOP AND MANAGE
DEVELOP EVENT EVENT CONCEPT PROGRAM VENUE AND SITE UPDATE EVENT EVENT UPDATE CONTRACTORS
PROPOSAL OR BID INDUSTRY MANAGEMENT KNOWLEDGE ON FOR INDOOR
KNOWLEDGE SERVICES PROTOCOL EVENTS
MANAGE
CONTRACTORS
FOR INDOOR
EVENTS
1.1 Contents of the event 1.1. Key objectives and 1.1 Overall context and 1.1 Event-specific venue 1.1 Sources of information 1.1 Plans for on-site 1.1 Sources of accurate 1.1 Event staging
brief are accurately components of the event scope of the conference are or site requirements are on the event industry are management are information on protocol are requirements are
interpreted and the are identified, clarified and identified. analyzed based on identified correctly. developed in accordance identified. analyzed based on
company’s capacity to agreed in consultation detailed review of all with agreed procedures detailed review of all
meet stated requirements with the stakeholder. aspects of the proposed for the meeting or event. aspects of the proposed
is assessed. 1.2. Key information is event, including 1.2 Materials are created event with multiple
analyzed and stakeholders multiple components. and collated to facilitate components.
are consulted to determine 1.2 Accurate and effective on-site
the scope of the event. complete venue or site management.
1.3. Internal and specifications are 1.3 Accurate briefing is
external factors which developed to facilitate the provided to operational
may impact on the event research process. staff and contractors
are analyzed. 1.3 Needs of all prior to the meeting or
stakeholders, including event in an appropriate
those with disabilities, format including
are integrated into venue clarification of roles and
or site specifications. responsibilities.
2.1 Details for inclusion in 2.4. Summary of key 2.2 Relevant components 2.1 Potential venues or 2.1 Information on legal and 2.1 All aspects of the 2.1 Areas of work activity 2.1 Appropriate
the proposal/bid are logistical requirements is for the program are sites are researched, ethical issues are obtained event or meeting set up and/or functions that contractors are
developed after developed based on the identified, designed and using appropriate to assist effective work are checked against the require appropriate use of identified and sourced to
consultation with overall concept, theme and integrated. information sources performance. pre-arranged agreements protocol are identified in a provide services for the
suppliers and other format. 2.6 Business program and research methods. 2.2 Day-to-day event 2.2 Any deficiencies and timely manner. event.
relevant agencies. based on principles of adult organization activities are discrepancies are 2.2 Correct use of protocol 2.2 Accurate briefings or
learning is developed to conducted in accordance with identified and prompt is integrated into work specifications on
incorporate an appropriate legal obligations and ethical action is taken to rectify activities. precise staging
range of activities. industry practices. the situation. requirements are
2.3 Additional on-site staff provided to contractors.
are briefed on the full
details of the meeting or
event operation including
communication and
control mechanisms.
3.1 Bid materials are 3.1 Proposed event program 3.1 Venue or site 3.1 Information on current 3,1 Sessions and activities 3.1 Opportunities to update 3.1 Progress, including
prepared within the is presented to the arrangements are and emerging technologies are monitored throughout protocol knowledge are safety issues, is
designated time lines in appropriate people within accurately confirmed in that impact on the event the meeting or event identified and used. monitored at regular
accordance with the required timeframe. writing when the organization process are through observation and intervals through
requirements of the brief. selection process is obtained. appropriate reporting ongoing liaison with
finalized. processes. contractors and other
stakeholders.
4.1 The proposal/bid is 4.1 A range of opportunities 4.1 Breakdown of the
delivered within the is identified and used to meeting or event is
prescribed time line. update knowledge of the checked to ensure it is
events industry. completed in accordance
with agreements.