WORK METHODOLOGY

INDEX
1. INTRODUCTION
1.1 GENERAL
1.2 DESCRIPTION O F ACTIVITY

2. SCOPE OF WORKS
2.1 GROUND FLOOR LEVEL
2.2 FIRST F LOOR LEVEL

3. MOBILIZATION
3.1 RESPONSIBILITIES
3.2 EQUIPMENT
3.3 TRAFFIC MANAGEMENTS

4. IMPLEMENTATION PLAN & OBJECTIVES


4.1 IMPLEMENTATION METHODS
4.2 IMPLEMENTATION ACTIVITIES
4.3 MONITORING A ND EVALUATION PROCESS
1. INTRODUCTION

1.2 GENERAL

ALL WORKS WILL BE CARRIED OUT IN ACCORDANCE WITH INSTRUCTIONS TO TENDERER’S AND IN CONSTANT
COORDINATION WITH THE CLIENT’S REPRESENTATIVE. THE METHOD OF STATEMENT TO BE FOLLOWED WILL MAINTAIN
COST SCHEDULE RESOURCE EQUILIBRIUM AND CONSIDER AND COMMUNICATE IT ’S IMPACT ON THE SOCIAL LIFE OF THE
STAFF WORKING AROUND THE PROJECT SITE.

1.3 DESCRIPTION OF ACTIVITY

TO ENSURE THAT THE MATERIALS AND RELATED ACTIVITIES ARE EXECUTED SAFETY AND IN ACCORDANCE WITH THE
CONTRACT REQUIREMENTS AND THAT ALL QUALITY ASSURANCE / CONTROL ACTIVITIES ARE CONDUCTED IN A
SYSTEMATIC MANNER. TO ENSURE THAT WORKS ARE INSPECTED, CONFORMANCE IS VERIFIED AND DOCUMENTED.

2. SCOPE OF WORKS

2.1 GROUND FLOOR LEVEL


A. ADMIN MALE TOILET WITH DISABLED TOILET
A.1 REMOVAL, SUPPLY & INSTALLATION OF NEW FLOOR AND WALL TILES
A.2 REMOVAL, SUPPLY & INSTALLATION OF NEW VANITY GRANITE COUNTERTOP WITH COMPLETE PROVISION
FOR WASH BASINS
A.3 REMOVAL, SUPPLY & INSTALLATION OF NEW 60 X 60 CM PLANE METAL CEILING INCLUDING REPLACEMENT
OF FRAMES, CHANNELS AND MEP PROVISIONS.
A.4 REMOVAL AND REFURBISHED TOILET DOORS
A.5 TEMPORARY REMOVAL OF WATER CLOSET CUBICLES AND PLACE IN THE DESIGNATED STORE ROOM.
A.6 RE-INSTALL THE WC CUBICLE AFTER THE INSTALLATION OF WALL AND FLOOR TILES, INCLUDING WC.
A.7 REMOVAL, SUPPLY & INSTALLATION OF NEW COMPLETE SANITARY FIXTURES AND ACCESSORIES.
A.8 SITE PROVISIONS OF ALL NECESSARY PLUMBING PIPE LINES AND SEWERAGE LINE AS PER STANDARD
METHODS.

B. TYPICAL MALE TOILET


B.1 REMOVAL, SUPPLY & INSTALLATION OF NEW FLOOR AND WALL TILES
B.2 REMOVAL, SUPPLY & INSTALLATION OF NEW VANITY GRANITE COUNTERTOP WITH COMPLETE PROVISION
FOR WASH BASINS
B.3 REMOVAL, SUPPLY & INSTALLATION OF NEW 60 X 60 CM PLANE METAL CEILING INCLUDING REPLACEMENT
OF FRAMES, CHANNELS AND MEP PROVISIONS.
B.4 REMOVAL AND REFURBISHED TOILET DOORS
B.5 TEMPORARY REMOVAL OF WATER CLOSET CUBICLES AND PLACE IN THE DESIGNATED STORE ROOM .
B.6 RE-INSTALL THE WC CUBICLE AFTER THE INSTALLATION OF WALL AND FLOOR TILES, INCLUDING WC.
B.7 REMOVAL, SUPPLY & INSTALLATION OF NEW COMPLETE SANITARY FIXTURES AND ACCESSORIES.
B.8 SITE PROVISIONS OF ALL NECESSARY PLUMBING PIPE LINES AND SEWERAGE LINE AS PER STANDARD
METHODS.

2.2 FIRST FLOOR LEVEL


C. TYPICAL MALE TOILET
C.1 REMOVAL, SUPPLY & INSTALLATION OF NEW FLOOR AND WALL TILES
C.2 REMOVAL, SUPPLY & INSTALLATION OF NEW VANITY GRANITE COUNTERTOP WITH COMPLETE PROVISION
FOR WASH BASINS
C.3 REMOVAL, SUPPLY & INSTALLATION OF NEW 60 X 60 CM PLANE METAL CEILING INCLUDING REPLACEMENT
OF FRAMES, CHANNELS AND MEP PROVISIONS.
C.4 REMOVAL AND REFURBISHED TOILET DOORS
C.5 TEMPORARY REMOVAL OF WATER CLOSET CUBICLES AND PLACE IN THE DESIGNATED STORE ROOM .
C.6 RE-INSTALL THE WC CUBICLE AFTER THE INSTALLATION OF WALL AND FLOOR TILES, INCLUDING WC.
C.7 REMOVAL, SUPPLY & INSTALLATION OF NEW COMPLETE SANITARY FIXTURES AND ACCESSORIES.
C.8 SITE PROVISIONS OF ALL NECESSARY PLUMBING PIPE LINES AND SEWERAGE LINE AS PER STANDARD
METHODS.

3. MOBILIZATION
- ALL CONTRACTOR’S LABOUR AND MACHINERY WILL BE PRESENTED ON SITE IN SUFFICIENCY TO COMPLETE THE
WORKS ON TIME.

3.1 RESPONSIBILITIES
A. THE PROJECT MANAGER OF CONSTRUCTION MANAGER SHALL BE RESPONSIBLE FOR THE OVERALL
IMPLEMENTATION OF THIS PROCEDURE FOR SUSPENDED CEILING WORKS, ENSURING THE WORKS DESCRIBED IN
THIS STATEMENT ARE CONDUCTED TO REQUIRED CODES, STANDARDS AND BEST PRACTICES IN CONFORMANCE
WITH APPROVED DRAWINGS AND SPECIFICATIONS.
B. SITE ENGINEER ALONG WITH FOREMAN WILL ENSURE THAT THE WORKS ARE CARRIED OUT IN ACCORDANCE
WITH THE SPECIFICATIONS, APPROVED DRAWINGS AND IN ACCORDANCE WITH THIS METHOD STATEMENT .
C. SAFETY OFFICER SHALL ENSURE IMPLEMENTATION OF ALL SAFETY PROCEDURES AND REGULATIONS AS PER OUR
HSE PLAN AND IN ACCORDANCE WITH THE SAFETY PLAN SET BY CONTRACTOR, HE SHALL CONDUCT TRAINING
AND TOOL BOX TALKS ON THE HAZARDS, DANGERS AND CONTROLS BEFORE COMMENCEMENT OF WORKS. HE
SHALL OBSERVE AND ENSURE THAT QATAR REGULATIONS ARE COMPLIED WITH.

3.2 EQUIPMENT’S
- BELOW ARE THE EQUIPMENT’S AVAILABLE INVOLVED IN THE EXECUTION OF FIT-OUT WORKS:
A. SCAFFOLDING WITH FRAMES, BRACES AND WALK-BOARDS
B. SAND PAPER, SCRAPERS AND PAINTING TOOLS
C. POWER TOOLS SUCH AS CIRCULAR SAW, CORDLESS SCREW GUN, TILE CUTTER / SAW
D. LEVELING SPIRIT, CLAMPS, PLIERS, UTILITY KNIFE (BOARD CUTTER), TROWELS AND LEVELING TOOLS
E. GENERATORS AND CONSTRUCTION LIGHTING

3.3 TRAFFIC MANAGEMENT


- TO AVOID ACCIDENTS, WARNING AND SPEED LIMIT SIGNS WILL BE USED TO CONTROL TRAFFIC SPEED
THROUGHOUT WORK ENVIRONMENT. WE WILL PROVIDE THE FOLLOWING IF AWARDED THE CONTRACT :
A. WARNING SIGNS
B. TEMPORARY RESTRICTION SIGNS
C. ADVANCED WARNING SIGNS
D. BARRIER (OPTIONAL)

4. IMPLEMENTATION PLAN & OBJECTIVES

4.1 IMPLEMENTATION METHODS


- BEFORE STARTING THE WORKS, THE FOLLOWING WORKS NEED TO BE COMPLETED AND ASSESSED BY THE
QADC ENGINEER FROM ALL CONCERNED PARTIES:
A. DEMOLITION, CLEARING AND SITE CLEANING BEFORE INSTALLATION OF ALL APPROVED MATERIALS
B. CHECKING OF ALL MEP PROVISIONS, SERVICES SHOULD BE COMPLETED
C. ENSURING ALL PROTECTION ARE ASSIGNED
D. AN AREA OF MOCK UP WILL BE PREPARED FOR INSPECTION AND APPROVAL BEFORE PROCEEDING WITH
THE OVERALL INSTALLATION.

4.2 IMPLEMENTATION ACTIVITIES


TABLE 4.2 DEMOLITION, CLEARING AND CLEANING OF SITE

REQUIRED NUMBER OF
ACTIVITY ACTIVITY PARTY MAN-HOUR per DESIGNATED
NO. OF DAYS
ID DESCRIPTION RESPONSIBLE day AREAS
MANPOWER COMPLETED

Demolition of 8 – 10 hours/day
Engineer In-
Act.1 existing floor & 4 labors Starting at 3 PM
charge
wall tiles onwards
Removal of 8 – 10 hours/day
existing ceiling Engineer In-
Act. 2 Starting at 3 PM
tiles and charge
channels onwards

Act. 3

Overall Completion 90 working dates