04/11/2023, 14:54 SPP - UAP SPLE 2024

NAME :

CLASS :
SPP - UAP SPLE 2024
DATE :
25 Questions

1. The Recommended Professional Fee (RPF) for Fulltime Construction Supervision


Services

A 1% to 2% B 1% to 1.5%

C 2% to 3% D 1.5% to 2%

2. Recommended Professional Fee (RPF) for Detailed Architectural Design Services


(DADS) of Exceptional Character

A 4.2% B 6%

C 7% D 3.6%

3. Shall refer solely to the National Government of the Republic of the Philippines.

A State B Country

C Nation D Government

4. Under Group 3 Project Classification

A Police Stations B Townhouses

C Mortuaries D Schools

5. The Recommended Professional Fee (RPF) for Project Manager

A 3% to 6% B 1% to 3%

C 2% to 5% D 4% to 6%

https://quizizz.com/print/quiz/65462ef68e268552b53049e5 1/6
04/11/2023, 14:54 SPP - UAP SPLE 2024

6. Recommended Professional Fee (RPF) for Detailed Architectural and Engineering


Design Services (DAEDS) of Simplest utilization and character

A 6% B 5%

C 3.6% D 3%

7. What does PRC stands for?

A Professional Regulation Commission B Probable Recommended Cost

C Professional Regulatory Commission D Professional Recommended Cost

8. P.A.C.S.

Professional Architectural Professional Architectural


A B
Consultancy Services Consultation and Services

Professional Architectural Professional Architectural Consulting


C D
Consultation Services Services

9. An amount equivalent to _ of the agreed Professional Fee shall be paid by the


Owner as engagement fee or as the acceptance fee of the Architect that shall
cover the mobilization component of the sevices.

A 5% B 15%

C 10% D PHP 20,000

10. Buildings of the simplest utilization and character which shall include but not be
limited to the following EXCEPT:

A Hangars B Shopping Centers

C Public Markets D Industrial Plants

11. Group 5 - Monumental buildings and other facilities except:

A Marinas and Resort Complexes B Museums

C Specialized Decorative Buildings D Exposition & Fair Buildings

https://quizizz.com/print/quiz/65462ef68e268552b53049e5 2/6
04/11/2023, 14:54 SPP - UAP SPLE 2024

12. How much is the RPF for Architect's Liability under the Civil Code?

A 10% B 15%

C 5% D 20%

13. The Recommended Professional Fee (RPF) per hectare for the first five (5 has.)
hectares net to the architect.

A P50,000.00 B P100,000.00

C P10,000.00 D P20,000.00

14. For alterations, renovations, rehabilitations, retrofit and expansion/additions to


existing buildings belonging to Groups 1 to 5 enumerated above, the
compensation of services should be increased to fifty percent (50%) or a total of

A 100% B 75%

C 125% D 150%

15. SPP is a required document under Sec. 41 of R.A. No. 9266 (The Architecture Act
of 2004) and its lmplementing Rules and Regulations (lRR) SPP means?

Standards of Professional Standards of Professional Practice


A B
Practitioners

C Standards of Practical Professionals D Standards for Practicing Professional

16. Recommended Professional Fee (RPF) for Detailed Architectural Design Services
(DADS) of Residential Projects

A 7.5% B 12%

C 10% D 6%

17. Group 4 - Residential EXCEPT

A Single-Attached B Single-Detached

C Shop-houses D Multi-Storey Apartments

https://quizizz.com/print/quiz/65462ef68e268552b53049e5 3/6
04/11/2023, 14:54 SPP - UAP SPLE 2024

18. Upon completion and submission of the documents under Contract Document
Phase as stipulated in the Service Agreement, the Owner shall pay the Architect a
sum equal to __ of the Professional Fee

A 90% B 20%

C 15% D 50%

19. Recommended Professional Fee (RPF) for Detailed Architectural and Engineering
Design Services (DAEDS) of Monumental Projects

A 6% B 7.5%

C 10% D 12%

20. Under Group 3 the Recommended Professional Fee (RPF) for Detailed
Architectural and Engineering Design Services (DAEDS) with Over P50.0 million
to P100.0 million

P3,500,000 plus 5% of excess of P P3,500,000 plus 6% of excess of P


A B
50.0 million 50.0 million

P3,500,000 plus 7% of excess of P P3,500,000 plus 4% of excess of P


C D
50.0 million 50.0 million

21. Under POST-CONSTRUCTION SERVICES (SPP Doc. 205), the Recommended


Professional Fee (RPF) based on value-pricing is from ___ of gross rental.

A 3% to 6% B 4% to 6%

C 1% to 3% D 2% to 5%

22. The Architect is engaged to render opinion or give advice, clarifications or


explanation on technical matters pertaining to architectural works. RPF for
Arbitration (as Expert Witness)

A PHP 1,000 B PHP 5,000

C PHP 500 D PHP 2,000

https://quizizz.com/print/quiz/65462ef68e268552b53049e5 4/6
04/11/2023, 14:54 SPP - UAP SPLE 2024

23. The Recomnrended Professional Fee (RPF) for an Architect doing Design-Build
Services on a Guaranteed Maximum Cost

A 3% B 7%

C 15% D 10%

24. The Recomrnended Protsssional Fee (RPF) for an Architect doing Design-Build
Services by Administration

A 3% B 10%

C 7% D 2%

25. The services of the Architect as Construction Manager can be compensated by a


Recommended Professional Fee (RPF) of ____ of the Project Construction Cost
(PCC).

A 1.5% to 3% B 1% to 2%

C 1.5% to 2% D 2% to 3%

https://quizizz.com/print/quiz/65462ef68e268552b53049e5 5/6
04/11/2023, 14:54 SPP - UAP SPLE 2024

Answer Key

1. b 2. a 3. a 4. c

5. c 6. b 7. a 8. d

9. a 10. b 11. a 12. c

13. a 14. d 15. b 16. d

17. d 18. d 19. d 20. b

21. b 22. b 23. d 24. c

25. a