Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Hi All,

We tested the PO 4151446517

Before the fix the transaction date in FOP PROD 1 was not container received date .

that is 8th Feb 2023 , please find the screen snip of the XML and the ARSTOCK file
After the mapping was corrected in LAT1 , for the same PO (4151446517) the transaction dates in rcv tables is coming as the
container received date i.e, 8th FEB 2023 , we were also able to receive the PO’s successfully with the normal process .

Pasting screen snips for reference .

You might also like