GENERAL INFORMATION
North
20000
South
756
6500 384 12
FL
1200
NOTE:
TYPICAL ELEVATION
OF STRUCTURE All installations are to be done
considering true south ,shadow
ARRANGEMENT
5000 free available,panel room location
for optimized cable usage and
other site conditions.
8000
SA 4
400
2826
NOTE:
RIGHT TO CHANGE OF THE MATERIAL, DESIGN AND ALIGNMENT
820 BASED ON AVAILIBILTY OF MATERIALS AND SITE CONDITIONS.
9540
600 PROJECT
653
SITE DETAILS
EPC CONTRACTOR :
36492
DETAIL:A
FOUNDATIONS
DIMENSIONS IN MM