TRAINING ACTIVITY MATRIX Group 4(5 members)

EPDLC NC II

Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area
Prayer
Trainees report in
LCD Projector
Recap of Activities 8:00 AM to 8:30 the lecture room for
All trainees Speaker Lecture Room
AM the opening prayer
Microphone
Unfreezing and attendance
Activities

Read contents 1.1-


1 to 1.1-3 Secure
and interpret job
requirement,
Identify OSH PPE, Equipment,
requirements and Devices, Projector, Workstation 1
John Please make sure to
Request for tools, Speaker, Laptop Install Single phase 8:30 AM to 4:30
Michael answer self-checks
Equipment and Site Work Area. consumer service PM
Felix and request for
devices and Work Plan connection facility
Rionell feedback from your
perform all relevant Manual
Charles trainer
tasks

Workstation 1 and
Housekeeping Cleaning materials 4:30 to 5:00
LRA
TRAINING ACTIVITY MATRIX Group 2(5 members)

EPDLC NC II

Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area

Prayer
Trainees report in
LCD Projector
Recap of Activities 8:00 AM to 8:30 the lecture room for
All trainees Speaker Lecture Room
AM the opening prayer
Microphone
Unfreezing and attendance
Activities

Read contents 2.1-


1 to 2.1-4 OSH Various PPE,
Requirements, Equipment,
Materials for Devices, Projector,
erecting post, Speaker, Laptop Please make sure to
Jacob
Assembly and Dennis Workstation 2 answer self-checks
Site Work Area. 8:30 AM to 4:30
perform all tasks Mark and request for
Erect post PM
involved Christopher Work Plan feedback from your
Allen Manual trainer

Post

Workstation 2 and Return all materials


Housekeeping Cleaning materials 4:30 to 5:00
DLA to storage
TRAINING ACTIVITY MATRIX Group 3(5 members)

EPDLC NC II

Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area

Prayer

LCD Projector Trainees report in


8:00 AM to 8:30 the lecture room for
Recap of Activities All trainees Speaker Lecture Room
AM the opening prayer
Unfreezing Microphone and attendance

Activities

Read contents 3.1- Various PPE,


1 to 3.1-4 OSH Sherwin Equipment,
Standards, Install Devices, Projector, Workstation 3 Please make sure to
double phase, Basic Alvin Speaker, Laptop
Install Double answer self-checks
Electrical Safety 8:30 AM to 4:30
Peter Site Work Area. phase consumer and request for
PM
service connection feedback from your
Patrick Work Plan
facility trainer
Manual
James
Post

Workstation 3 and Return all materials


Housekeeping Cleaning materials 4:30 to 5:00
Comlab to storage
TRAINING ACTIVITY MATRIX Group 4(5 members)

EPDLC NC II

Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area

Prayer
LCD Projector Trainees report in
8:00 AM to 8:30 the lecture room for
All trainees Speaker Lecture Room
Recap of Activities AM the opening prayer
Unfreezing Microphone and attendance
Activities
Read contents 4.1-
1 to 4.1-4 OSH Various PPE,
Standards, Install Equipment, Please make sure to
double phase, Basic Manny Workstation 4
Devices, Projector, answer self-checks
Electrical Safety Speaker, Laptop 8:30 AM to 4:30
Daniel Handle Off Premise and request for
Site Work Area. PM
Repairs feedback from your
Ferdi Work Plan trainer
Manual
Post

Chum IA Tools Return all


Institutional Core 4 Institutional
Log book 9:00 to 4:00 resources after the
evaluation Harry Assessment Area
IA resources evaluation

Workstation 4 and Return all materials


Housekeeping Cleaning materials 4:30 to 5:00
Comlab to storage
TRAINING ACTIVITY MATRIX Group 5(5 members)

EPDLC NC II

Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area

Prayer All trainees Lecture Room

LCD Projector Trainees report in


8:00 AM to 8:30 the lecture room for
Recap of Activities Speaker
AM the opening prayer
Unfreezing Microphone and attendance

Activities

Various PPE, Learning Resource


Equipment, Area/ Quality
Maintaining all Carlo Devices, Projector, Control Area/
EPDLC Equipment Speaker, Laptop Support Service
Carrie Please observe
Area
Site Work Area. 8:30 AM to 4:30 proper handling
Gab
PM and transporting of
Work Plan
Mitch equipment
Manual
Sandy
Post

Manual

Housekeeping Cleaning materials Contextual 4:30 to 5:00 Return all materials


Learning Area/ to storage properly
Quality Control and dispose waste
Venue Work
Training Activity Trainee Resources Date and Time Remarks
Station Area

and Support according to


Service Area company policy

Prepared by: