SOP of Oxide Mill RP
SOP of Oxide Mill RP
3. Material Required-
Lead(99.99% Pure)
Water
4. Equipment-
Reaction Pot with Accessories
Lead Pot with Accessories
Hepa Filter
T.C.C with Accessories
Bag Filter
Silo Storage for oxide
Scoops for Oxide Sampling
Hoist with Accessories
Ladle for dross out
5. Set-up Verification-
Start the heating process of Reaction Pot and
Lead Pot Burner approx. 5 hours before start
of operation.
Ensure the temp of Lead Pot 440 +/- 30
DEG.C
Ensure the temp of Reaction Pot 360 +/- 20
DEG.C
Ensure the temp of Lead Pipe(Feed pipe) 400
+/- 20 DEG.C
Exhaust Fan, Vibrators, Lead Pump, Agitator
& Pulse Jets will start in Auto Mode when
pre-set temperature are achieved by
machines.
Open Exhaust Fan damper to approx. 50%
Ensure all the parameters are defined by
technician
6. Troubleshooting-
Insufficient Airflow rate coming from system fan or
ductwork system.
Actions-
o Check wiring
o Make Sure Motor leads are
attached to proper terminals
o Check Connections
o Ensure no extra material
deposited on fan.
Excessive Airflow Rate.
Actions-
o Check Settings and adjust.
o Evaluate the ductwork system.
o Close all pores and ensure they are
seal properly.
Common Baghouse issues such as higher
anticipated pressure drop and moisture in the bag
house.
Actions-
o Clean all the pressure taps, check
houses for leaks, for proper fluid
pressure in manometer.
o Rise the gas temperature.
Note:- Any general issues are alerted immediately on the UI display and
machine stops automatically.
7. Procedure-
9. Waste Management-
Residual waste after the process are sent for
recycling and reuse.
Hepa Filter is connected to bag house which
filters the air present in bag house and then
into atmosphere. (PbO particles get filtered).
Picture Description
Input of Lead Ingot into Lead Pot through
Conveyor Belt.
Bag House