Waterproofing
Waterproofing
Waterproofing
thickness 25 mm thick in cement mortar 1:3 with addition of waterproofing compound and brickbat layer 75
Item No.:
mm thick, gaps filled with same mortar, using specialized material as per specialists specification including
A MATERIAL :
1 Cement Bag 1.41
2 River Sand Cum 0.30
3 Bricks Nos 480.00
Waterproofing Compound - 1 kg
4 Kg 1.41
per Bag
Wastage
> 3% on 1 0.03
@
Wastage
> 5% 0n 2 to 3 0.05
@
> VAT @
> Transp. @
Total Material Cost
> 1 Cum
Per :
Say
B LABOUR :
> Contract Labour :
Labour for Waterproofing 1 Cum 1.00
Analysis
1 Cum
for :
Rate Amount
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
700.00 700.00
700.00
700.00
10.00 10.00
10.00 10.00
20.00
20.00
TOTAL - Labour Cost 720.00
#REF!
#REF!
#REF!
#REF!
2 Aaiji Crystal Location : 2BHK CT
thickness 25 mm thick in cement mortar 1:3 with addition of waterproofing compound and brickbat layer 75
Item No.:
mm thick, gaps filled with same mortar, using specialized material as per specialists specification including
A MATERIAL :
1 Cement Bag 1.41
2 River Sand Cum 0.30
3 Bricks Nos 480.00
Waterproofing Compound - 1 kg
4 Kg 1.41
per Bag
Wastage
> 3% on 1 0.03
@
Wastage
> 5% 0n 2 to 3 0.05
@
> VAT @
> Transp. @
Total Material Cost
> 1 Cum
Per :
Say
B LABOUR :
> Contract Labour :
Labour for Waterproofing 1 Cum 1.00
Analysis
1 Cum
for :
Rate Amount
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
700.00 700.00
700.00
700.00
10.00 10.00
10.00 10.00
20.00
20.00
TOTAL - Labour Cost 720.00