1.2 Main DB (AC Board) & DB Box Completion Installation & Termination Photo.
Installation RFDB Box Inside Riser Room Block A Level Installation Meter Panel Inside Riser Room Block A Level
20 20
Location Termination Inside Main DB at Riser Room Location Grounding Termination Inside Riser Room
Level 20 Block ALevel 20
AMI SITE CONSTRUCTION COMPLETION DOCUMENT:
SITE ID: RPTR_WKLB56_009
SITE NAME: SENADA BLOCK A ROOFTOP
1.3 Electrical Works Completion Photo (Cable & Pvc Pipe Route & Termination).
Termination Inside Main DB at Riser Room Level 20 Termination Inside RFDB Box Inside Riser Room
Block A Level 20
Termination at Meter Panel Inside Riser Room Block Cable Route at Rooftop Level 20
A Level 20
AMI SITE CONSTRUCTION COMPLETION DOCUMENT:
SITE ID: RPTR_WKLB56_009
SITE NAME: SENADA BLOCK A ROOFTOP
Cable Route outside Riser Room Level 21 Cable Route inside Riser Room Level 20
Cable Route Inside Riser Room Level 18 Cable Route Inside Riser Room Level 18
Installation Tagging Inside Main DB at Riser Room Block A Installation Tagging Inside DB Box at Riser Room Level 20
Level 20
Installation Sticker at DB Box Inside Riser Room Block A Installation Tagging at Nan Antenna Inside Riser Room
Level 20 Block A Level 20
Name
Designation