Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MALITH NIMESHA

Quantity Surveyor/Cost Controller/ Estimator

Bachelors Quantity Surveying (BSc. Hon) from


Birmingham City University, United Kingdom

Experienced and professional Quantity Surveyor, providing high-quality service


with over Five years of experience, with expertise in Pre-contract, and post-
Contact contract. Mainly cover, Post-contract activities in civil and structural (Buildings)
and Infrastructure(Water Supply project). As also, have experience in Structural,
Interior fit-outs, Joinery works, and Landscaping as a Quantity Surveyor.
Visa Status
Own Visa Overall career Experience
Phone
Post contract Activities
+971 55 532 0069
Preparing the Interim Payment Applications (IPA)
Preparing WIP Report with all cost analyses of the project
Email
Preparing subcontractor bills and machinery bills
Making relevant changes in cost, material, etc., as per the variations in the project
malithnimesha@gmail.com
Preparing Monthly Target and Progress reports for the Project
Placing requests for all purchasing materials for the project, considering urgency, importance,
Linkedin and cost factors
Preparing variation proposals
http://linkedin.com/in/malith-nimesha-
Preparing cost proposals and value engineering reports
1b973119b Support Head office officials in preparing EOT

Residential Address Pre contract Activities


Preparing price estimates for projects
Al Barsha 1, Dubai, UAE Take off the measurement (Civil & MEP) for the project (Highrise Buildings)
Preparing BOQs and ensuring the accuracy of bills of quantities by coordinating all related
parties.

Education Assist in costing, pricing, and analysis of direct and indirect costs for the BOQ items.
Scrutinize, and review tender drawings/documents for discrepancies, and additional BOQ
items/scope and incorporate them within the tender offer
Preparing project budget
2019 Preparing Rate breakdowns
Determining total cost for raw materials, equipment, and utilities.
Bachelors Quantity Surveying (BSc. Hon) Determining total cost for raw materials, equipment, and utilities.
Preparing and completing Tender documents
Birmingham City University, United Analyse and compare quotations received at the bid stage.
Kingdom
Employment History
2015
Gulf Experience - Horizon Contracting Co LLC
Higher National Diploma in Quantity
Quantity Surveyor/Estimator
Surveying and Build Environment
2023-2024
Cardiff Metropolitan, United Kingdom ACHIEVEMENTS
Take off the measurement of civil work, facade works, and interior finishes work (Joinery
work) using Planswift and Autocade.

Professional Take off quantities for new tenders


Preparing BOQ based on POMI, NRM2 and CESSM3

Qualifications Preparing IPA (Interim Payment Application)


Preparing subcontractor bills based on drawings
Preparing equations for finishing works
Preparing cashflow
Draughtsman Course (CD1) – German New budget proposals for ongoing projects

Technical College, Moratuwa,Sri Lanka


2020-2023

Diploma in ICT – IDM Sri Lanka Micro Constructions (Pvt) Ltd

Quantity Surveyor
Expertise PROJECTS
1. Sri Lanka Forestry Institute (Nuwara Eliya - Central Province) - This is a contract project with a 202
Bill of Quantities & Estimation mn sum (cost), a collaboration with the Forest Department
Project planning.
Site organization. 2 . Nayabedda Water Supply Project – (Nayabedda - CentralProvince)
Interim valuations. This contract project has a 70 mn sum (cost) in collaboration with the National Water Supply and
Variations & extra work. Drainage Board.
Building and interior technologies.
Procurement procedure. ACHIEVEMENTS
Progress monitoring. Preparing the Interim Payment Applications (IPA) of the project compiling all monthly bills
Measurements. Preparing WIP Report with all cost analyses of the project and sharing the same with the Finance
Site documentation. Division
Material reconciliation reports. Preparing subcontractor bills and machinery bills
Sub-Contractor Agreements & bills. Responsible for making relevant changes in cost, material, etc., as per the variations in the project
Financial controlling
Responsible for preparing Monthly Target and Progress reports of the Project
Cashflow statements
Responsible for placing requests for all purchasing materials for the project, considering urgency,
importance, and cost factors
Language Responsible for smooth work handling with the Consultant of the Project
Preparing variation proposals
English Preparing cost proposals and value engineering reports
Support Head office officials in preparing EOT
Sinhala Handling all relevant documents and support to the administrative works

Computer Literacy
Microsoft word 2019-2020
Microsoft Excel
Microsoft Project Wajira House Builders
AutoCAD Quantity Surveyor/ Cost Controller
PlanSwift
Responsible Sites (Provinces)
Candy
North, Central, North Central, Sabaragamuwa, Northwest

Familiar documents ACHIEVEMENTS


Conditions of Contract Responsible for joining with Engineer for site visits and construction quality inspections
•FIDIC Conditions of Contract 1999 & 2017 Responsible for taking measurements relevant to payments
•ICTAD Conditions of Contract (SBD 2) Preparing monthly valuation/Certifying IPA
•ICTAD Conditions of Contract (SBD 4) Responsible for coordinating with external parties (Clients/suppliers/subcontractors)
Preparing progress reports and cash flow reports
Method of measurements
•Civil Engineering Standard Methods of 2017-2019
Measurements (CESMM 4)
•Sri Lankan Standard Methods of
Engineering Service Department of National Housing
Measurements (SLS 573) Development Authority
•New Rules of Measurements (NRM2)
Assistant Quantity Surveyor
Schedule of Rates (Sri Lanka) ACHIEVEMENTS
•Building Schedule of Rate (BSR)
Take off the measurement (Civil & MEP) for the housing project (Highrise Apartments)

Reference Responsible for preparing BOQ and ensuring the accuracy of BOQs
Responsible for certifying IPC
Mr.Chamara Bandara Responsible for preparing price estimates for housing projects
Responsible for handling the process of price escalation
Quantity Surveyor Responsible for coordinating with insurance companies and guarantees
Gulf Asia Contracting LLC Responsible for take-off measurements and joined measurements for payments
Responsible for certifying payment certificates
Phone: +971 55 533 0454 Responsible for joining site visits with the engineering team
Documentation and other Administration duties of projects of NHDA
Email : kmchamarabandara@gmail.com
2017-2017

Ms. Piumi Ayesha Vonland (Pvt) Ltd

Senior Executive – Legal & Company Trainee Quantity Surveyor


Secretary
A Baur & Co (Pvt) Ltd
I do hereby certify that the above information is accurate and correct to the best of my
knowledge.
Phone: +94 712515832

Email : piumi@baurs.com

You might also like