22,375,961
1.1.1 ALC Block (Supply & Install) ALC BLOCKS, THK100~200MM M2 980 234,464,216 795 239,249 190,227,039 (184.90) (44,237,177)
1.1.2 MORTAR W/URETHANE RUBBER WATER PROOF WALL, Up To 1.2m M2 205 52,465,322 258 255,928 66,106,306 53.30 13,640,984
1.1.3 PLASTERING CEMENT MORTAR INT, 18mm M2 175 15,442,928 1,590 88,245 140,327,676 1,415.20 124,884,749
1.1.7 DRY WALL[EW2] WALL, C-STEEL STUD+GYPSUM BOARD 12t M2 480 97,029,090 884 202,144 178,609,734 - - 403.58 81,580,644
1.1.7 DRY WALL[EW2]ADDITIONAL OFFICE WALL, C-STEEL STUD+GYPSUM BOARD 12t M2 - 17 202,144 3,396,018 - - 16.80 3,396,018
1.1.7 DRY WALL[EW2]REINSTALL HALL-1 WALL, C-STEEL STUD+GYPSUM BOARD 12t M2 - 4 232,775 938,081 - - 4.03 938,081
1.1.8 DRY WALL[FW3] WALL, C-STEEL STUD+GYPSUM BOARD 12t M2 432 87,326,181 - - - - (432.00) (87,326,181)
1.1.10 DRY WALL ADDITIONAL-1 WALL, HOLLOW 40X20 STUD+GYPSUM BOARD 12t M2 - 73 202,144 14,786,829 - - 73.15 14,786,829
1.1.11 GYPSUMP BOARD SURFACE TREATMENT WALL M2 1,919 70,612,484 3,340 36,797 122,901,333 1,421.03 52,288,849
1.1.12 CERAMIC WALL TILE (SUPPLY & INSTALL) Size : 300*600 M2 464 182,856,461 1,159 394,087 456,615,834 694.67 273,759,373
CERAMIC WALL POINT TILE (SUPPLY &
1.1.13 INSTALL) Size : 75x250 M2 - 16 736,360 11,702,822 15.89 11,702,822
1.1.14 CERAMIC WALL TILE MOLDING Size : 15mmx15mm X 1mm SUS HAIR LINE 304 M - 105 150,000 15,750,000 105.00 15,750,000
1.1.15 CERAMIC WALL TILE CORNER GUARD Size : 15mmx20mm X 1mm SUS HAIR LINE 304 M - 18 53,000 954,000 18.00 954,000
1.1.16 WATER BASED PAINT INT-WALL, 3TIME, Gypsum Board & ALC Block M2 3,192 558,426,100 3,938 174,946 689,008,477 746.42 130,582,377
THK : 12mm, Artificial marble, On window ledge, top of
1.1.17 ARTIFICIAL MARBLE
Urinoir & Closet
M2 15 38,546,820 24 2,569,788 60,463,000 8.53 21,916,180
W : 1,370mm, Light Gray Color Model No. BIJOU_J61203,
1.1.18 FABRIC
installed at VIP Room & Excevutive Office
M2 79 127,154,576 191 1,609,552 308,206,598 - - 112.49 181,052,021
1.1.23 SKIRTING WOODEN (SUPPLY & INSTALL) H=100 M 21 2,206,796 839 105,086 88,135,261 817.70 85,928,466
1.1.24 SKIRTING VYNIL (SUPPLY & INSTALL) H=100 M 698 83,993,481 - 120,335 - (698.00) (83,993,481)
1.1.25 GLASS PARTIITON Tempreded Glass 10T, Sus pipe 2", Curtion Vinyl M2 - 7 1,555,200 10,777,536 6.93 10,777,536
1.1.26 GLASS BLACKBOARD Back paint Glass 6mm + molding, 2400x1200 M2 - 26 1,749,600 45,349,632 25.92 45,349,632
1.2.1 PVC TILE Size : 600x600x3T,Waxing 1 Time M2 813 386,881,985 920 475,870 437,954,690 107.32 51,072,705
1.2.2 PORCELAIN TILE( Hall 1,2) THK ; 10mm, Non - Slip Type M2 345 128,360,355 112 372,059 41,521,784 - - (233.40) (86,838,571)
1.2.3 PORCELAIN TILE( Canteen) Size : 600x600, Light Beige Color M2 - 79 360,927 28,621,511 - - 79.30 28,621,511
1.2.4 CERAMIC TILE (Toilet) Size : 600x600, Light Beige Color M2 97 35,009,919 178 360,927 64,389,377 - - 81.40 29,379,458
1.2.5 CERAMIC TILE (Stair) Size :300x600 + 600x600, Wooden Color M2 - 54 360,927 19,625,045 - - 54.37 19,625,045
1.2.6 EPOXY PAINT M2 778 173,829,318 702 223,431 156,879,842 - - (75.86) (16,949,476)
1.2.8 GRANITE FLOOR, GRANITE 30mm, MORTAR 20mm M2 75 94,363,515 0 - - - (75.00) (94,363,515)
1.2.9 GRANITE FLOOR, GRANITE 20mm, MORTAR 30mm M2 - 20 1,258,180 25,163,604 - - 20.00 25,163,604
1.2.10 GRANITE DOOR SEAL FLOOR, GRANITE 30mm, MORTAR 20mm Block color M2 - 4 1,258,180 4,560,903 - - 3.63 4,560,903
1.2.11 MORTAR W/URETHANE RUBBER WATER PROOF FLOOR M2 121 16,943,098 167 140,026 23,415,081 46.22 6,471,983
1.2.12 ACCESSFLOOR 600x600, H=300, adjustable and conductive tile M2 82 194,312,120 - (82.00) (194,312,120)
1.2.13 ACCESSFLOOR 600x600, H=400, adjustable and conductive tile M2 - 42 2,548,900 107,053,800 42.00 107,053,800
1.2.14 ACCESSFLOOR(HOLE) 600x600, H=300, adjustable and conductive tile EA - 17 1,632,547 27,753,299 17.00 27,753,299
1.2.15 STAIR FLOOR SURFACE TREATMENT Grouting Floor M2 - 14 734,000 10,393,440 14.16 10,393,440
1.3.3 MF ACOUSTIC CEILING TILE Hanger Bolt demolition M2 - 229 165,000 37,785,000 229.00 37,785,000
1.3.8 GYPSUMP BOARD SURFACE TREATMENT CEILING M2 316 11,627,694 524 36,797 19,263,704 - - 207.52 7,636,010
1.3.9 WATER BASED PAINT 3 times, Color shall be decided by Contractor M2 38 6,725,286 363 176,981 64,283,119 325.22 57,557,832
1.3.10 VINYL PAINT 3 times, Color shall be decided by Contractor M2 278 22,541,602 160 81,085 12,997,909 (117.70) (9,543,693)
1.3.11 CURTAIN BOX Size : 230*250, Static Particle paint on THK 1.2 Steel Plate M 52 27,842,818 84 535,439 44,816,228 - - 31.70 16,973,410
W : 20mm,Dark Gray Color , installed at VIP Room &
1.3.12 FABRIC MOLDING
Excevutive Office
M - 80 135,000 10,808,100 - - 80.06 10,808,100
1.4.4 URINAL SCREEN W:500*H1330,FROST GLASS EA 6 5,889,827 7 981,638 6,871,465 1.00 981,638
1.5 MISCELLANEOUS ITEMS WORKS - - 0.00 0
Ø165 SSTL Pipe THK 3MM. H:1200, with SSTL Plate THK
1.5.1 BOLLARD(POST/TYPE-A)
9mm, Anti-Corrosive paint, paint finish (yellow)
EA 28 41,695,360 (28.00) (41,695,360)
Ø125 SSTL Pipe THK 3MM. H:1000, with SSTL Plate THK
1.5.2 BOLLARD(POST/TYPE-A)
9mm, Anti-Corrosive paint, paint finish (yellow)
EA - 36 1,389,120 50,008,320 36.00 50,008,320
1.5.3 BOLLARD(CORNER GUARD/TYPE-B) L.100*100*7T H.850 M 214 156,570,489 406 731,638 297,044,947 - - 192.00 140,474,458
Size : 5127+800+2925, Galv. Steel ISA 65*65*6+Galv. Steel
1.5.4 SST'L CAGED LADDER(100-A-309)
Round BarØ18@250+F.B-50*5 (Caged)
EA 1 6,782,225 - (1.00) (6,782,225)
1.5.6 STAINLESS STEEL HAND RAIL(B-TYPE) 50*25 RECTANGULAR+50*8t 2PLY+Ø12.7t*5ea, H:1100 M 49 116,634,827 55 2,380,303 130,916,643 6.00 14,281,816
1.5.7 STAINLESS STEEL HAND RAIL(A-TYPE) Ø42.4+30*30+Ø21.4, H:1100 M 68 139,534,980 - (68.00) (139,534,980)
1.5.10 COLUMN NUMBER SIGN RC Column EA 52 15,365,264 43 295,486 12,705,891 - - (9.00) (2,659,373)
1.5.11 GUARD COLUMN Rubber 90mm x 90mm x 1000mm EA - 47 276,000 12,972,000 - - 47.00 12,972,000
1.5.12 STANDING LINE Sus pol , FIXing Floor , Anchore Bolt , Base plate M - 35 933,000 32,655,000 - - 35.00 32,655,000
TKH 4mm Hollow 75 x 75 x 3mm ,Sealant, casket,
1.5.13 ALUMINIUM COMPOSITE PANEL
equipment
M2 - 370 2,880,000 1,065,600,000 - - 370.00 1,065,600,000
1.5.14 ALUMINIUM COMPOSITE PANEL TKH 4mm Sealant, casket M2 - 5 995,000 4,527,250 - - 4.55 4,527,250
1.5.15 ALUMINIUM COMPOSITE PANEL TKH 4mm Sealant, casket reinstall M2 - 3 995,000 2,985,000 - - 3.00 2,985,000
1.5.16 COVER OUTLET SUS 8mm ,SUS Mesh 500x500x500 M2 - 10 1,300,000 13,000,000 - - 10.00 13,000,000
L2140*W750*H850+L2140*W350*H750, Wooden
Furniture, TOP Furniture Finishing with interior finishing film
Ex. LX HAUSYS Model CW615 (LIGHT WOOD), and
1.6.2 SINK BUILT-IN FURNITURE[IF-03,AM-01] furniture body finishing with Interior finishing film Ex. LX EA 1 52,959,627 - (1.00) (52,959,627)
HAUSYS Model RS124 (WHITE), Artificial Marble
finishing on Sink Table & Wall, including Top & Bottom
Drawer, sink & Faucet and built in indirect light
L3630*W750*H750 +L3630*W600*H600 +
L630*W900*H2500 Wooden Furniture, TOP Furniture
Finishing with interior finishing film Ex. LX HAUSYS Model
CW615 (LIGHT WOOD), and furniture body finishing with
1.6.3 SINK BUILT-IN FURNITURE-1(CANTEEN)
Interior finishing film Ex. LX HAUSYS Model RS124
EA - 1 123,520,906 123,520,906 1.00 123,520,906
(WHITE), Artificial Marble finishing on Sink Table & Wall,
including Top & Bottom Drawer, sink & Faucet and built in
indirect light
L3630*W750*H750 +L3630*W600*H600 Wooden
Furniture, TOP Furniture Finishing with interior finishing film
Ex. LX HAUSYS Model CW615 (LIGHT WOOD), and
1.6.4 SINK BUILT-IN FURNITURE-2(PANTRY) furniture body finishing with Interior finishing film Ex. LX EA - 1 99,088,947 99,088,947 1.00 99,088,947
HAUSYS Model RS124 (WHITE), Artificial Marble
finishing on Sink Table & Wall, including Top & Bottom
Drawer, sink & Faucet and built in indirect light
0 - 0.00 0
SUB TOTAL 5,132,586,844.95 516,358,100.59 7,801,160,680.11 0.00 0.00 0.00 2,668,573,835.16
- - 0.00 0
2. SECURITY OFFICE - - 0.00 0
2.1.2 ALC Block (Supply & Install) ALC BLOCKS, THK100~200MM M2 46 11,005,463 66 239,249 15,727,285 19.74 4,721,822
2.1.3 MORTAR W/URETHANE RUBBER WATER PROOF WALL M2 8 2,047,427 16 255,928 4,125,566 8.12 2,078,139
2.1.4 PLASTERING CEMENT MORTAR INT, 18mm M2 45 3,971,039 99 88,245 8,701,340 - - 53.60 4,730,301
Subcon's Request(B) HEC's Review(C) Difference(B-C)
Q'ty Amount Remarks
Q'ty U/P Amount Q'ty U/P Amount Q'ty Amount
2.1.8 GYPSUMP BOARD SURFACE TREATMENT WALL M2 65 2,391,773 95 36,797 3,483,451 29.67 1,091,679
2.1.9 CERAMIC WALL TILE (SUPPLY & INSTALL) Size : 300*600 M2 22 7,940,394 35 360,927 12,704,630 - 13.20 4,764,236
2.1.10 CERAMIC WALL TILE MOLDING Size : 15mmx15mm X 1mm SUS HAIR LINE 304 M - 3 150,000 480,000 3.20 480,000
THK : 12mm, Artificial marble, On window ledge, top of
2.1.11 ARTIFICIAL MARBLE
Urinoir & Closet
M2 1 1,285,155 1 1,285,155 1,285,155 0.00 0
2.1.12 WATER BASED PAINT INT-WALL, 3TIME, Gypsum Board & ALC Block M2 101 17,875,103 112 176,981 19,884,548 11.35 2,009,445
2.1.13 WATER BASED PAINT EXT-WALL, 3TIME, con'c·mortar M2 10 1,769,812 14 176,981 2,442,341 3.80 672,529
2.1.14 SKIRTING VYNIL (SUPPLY & INSTALL) H=100 M 44 5,201,368 - - - (44.00) (5,201,368)
2.1.15 SKIRTING WOODEN (SUPPLY & INSTALL) H=100 M - 40 105,086 4,203,420 40.00 4,203,420
THK : 12mm, Artificial marble, On window ledge, top of
2.1.16 ARTIFICIAL MARBLE
Urinoir & Closet
M2 - 3 2,569,788 8,480,300 3.30 8,480,300
2.2.1 PVC TILE Size : 600x600x3T,Waxing 1 Time M2 36 17,131,306 41 475,870 19,510,654 5.00 2,379,348
2.2.2 PORCELAIN TILE THK ; 10mm, Non - Slip Type M2 4 1,488,236 5 372,059 1,860,295 - - 1.00 372,059
2.2.3 MORTAR W/URETHANE RUBBER WATER PROOF FLOOR M2 4 960,102 5 240,026 1,200,128 - - 1.00 240,026
2.2.4 GRANITE FLOOR, GRANITE 20mm, MORTAR 30mm M2 - 27 1,258,180 33,467,593 - - 26.60 33,467,593
2.3.4 VINYL PAINT 3 times, Color shall be decided by Contractor M2 4 324,340 4 81,085 324,340 - - 0.00 0
2.3.5 CURTAIN BOX Size : 150*170, Static Particle paint on THK 1.2 Steel Plate M 1 446,199 12 446,199 5,354,388 - 11.00 4,908,189
2.5.3 COVER OUTLET SUS 8mm ,SUS Mesh 400x400x500 M2 - 2 1,000,000 2,000,000 - - 2.00 2,000,000
SUB TOTAL 172,656,022.78 26,838,095.84 719,907,255.90 0.00 0.00 0.00 547,251,233.12
- - 0.00 0
3.1.1 SURFACE TREATMENT RC WALL & COLUMN M2 69 5,100,791 69 73,925 5,100,791 0.00 0
3.1.2 WATER BASED PAINT INT-WALL, 3TIME, con'c·mortar M2 33 5,840,380 33 176,981 5,840,380 - 0.00 0
3.1.3 WATER BASED PAINT EXT-WALL, 3TIME, con'c·mortar M2 36 6,371,324 36 176,981 6,371,324 0.00 0
4.1.1 SURFACE TREATMENT RC WALL & COLUMN M2 269 19,885,691 269 73,925 19,885,691 - 0.00 0
4.1.2 WATER BASED PAINT INT-WALL, 3TIME, con'c·mortar M2 180 31,856,620 180 176,981 31,856,620 0.00 0
4.1.3 WATER BASED PAINT EXT-WALL, 3TIME, con'c·mortar M2 89 15,751,329 89 176,981 15,751,329 0.00 0
4.2.1 SURFACE TREATMENT RC Slab M2 133 9,831,959 133 73,925 9,831,959 - - 0.00 0
4.2.3 EPOXY COATINGPAINT Clear Color M2 - 133 223,431 29,716,323 - - 133.00 29,716,323
5. EMPLOYEE GATE 0
5.1 FLOOR WORKS 0
5.1.1 GRANITE FLOOR, GRANITE 30mm, MORTAR 20mm M2 35 44,036,307 35 1,258,180 44,036,307 0.00 0
5.2.3 COVER OUTLET SUS 8mm ,SUS Mesh 400x400x500 M2 - 1 1,000,000 1,000,000 - - 1.00 1,000,000
6. SEWAGE PIT