Professional Documents
Culture Documents
Ded Kandang Sapi Desa Darawati 2024 - 1
Ded Kandang Sapi Desa Darawati 2024 - 1
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
KOORDINAT
7°40'32"S 108°3'50"E
PETA
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
SAWAH Farming System in Upland Areas
Project (UPLAND)
1059
8170
BAK FERMENTASI
1
1
MATA AIR 120x220 MINISTRY OF AGRICULTURE
1
KEBUN MILIK WARGA
Directorate General of Agricultural
2
87
Infrastructure and Facilities
14
1
1
PEKERJAAN
1
BIODIGESTER KANDANG SAPI
1
JALAN TANAH BIASA
1469
3918
HEAD OF AGRICULTURE
-0.050
KM/WC
±0.000
GUDANG ±0.000
R.KANTOR
DEPARTEMENT
KEBUN MILIK WARGA
9
8
0
42
91
Tasikmalaya Regency
11
9298
00
90
18000
+0.00
ATAS CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
JALAN COR
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SITE PLAN
Scale: 1: 150 SITE PLAN
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
1000
1000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
2000
BAK FERMENTASI
1 1 1 1 1 1 1
PEKERJAAN
HEAD OF AGRICULTURE
2000
6000
8000
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
2000
1 1 1 1 1 1
1000
1000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
DENAH
SCALE Drawn by :
DENAH Checked by :
SKALA 1 : 100 Approved by :
CODE DRAWING NO. 02
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
8000
BIODIGESTER KANDANG SAPI
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DENAH ATAP
DENAH ATAP
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 03
DATE
SHOP DRAWING
BALOK 10/10
+4.600
BALOK 10/10
GORDING 5/10
ASBES GELOMBANG
27°
+2.800 Farming System in Upland Areas
Project (UPLAND)
RING BALOK RING BALOK
15/20
15/20
KOLOM 150 X 150 cm
+1.800 OWNER
TALANG PAKAN TALANG PAKAN
+1.200
+0.800
SLOOF 15/15
PONDASI BATU KALI ± 0.000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
-1.000
Infrastructure and Facilities
PEKERJAAN
2000 2000 2000
BIODIGESTER KANDANG SAPI
6000
NOK/BUBUNGAN
TALANG PAKAN
Ir.Haris Prastyo,MT
+1.200
Team Leader
+0.800
SLOOF 15/15 DRAWING NAME
PONDASI BATU KALI ± 0.000
POTONGAN A-A,B-B
-1.000
3000 3000 SCALE Drawn by :
9000 Checked by :
Approved by :
POTONGAN A-A CODE DRAWING NO. 04
SKALA 1 : 100
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
27°
Project (UPLAND)
RING BALOK
RING BALOK
15/20 15/20 OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 05
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
RING BALOK
15/20
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 06
DATE
SHOP DRAWING
PROJECT
TABEL PENULANGAN KOLOM
15X15 The Development of Integrated
Farming System in Upland Areas
K1 Project (UPLAND)
TULANGAN
BEGEL
4 Ø 10
Ø 6 - 200
Besi 10 mm Full
Besi 6 mm Full
OWNER
4 MINISTRY OF AGRICULTURE
K1 K1 K1 K1
Directorate General of Agricultural
Infrastructure and Facilities
2000
PEKERJAAN
2000
6000
Tasikmalaya Regency
2
K1 K1 K1 K1 Nuraedidin,SIP
NIP.19650540 198403 1 001
2000
1
K1 K1 K1 K1
CONSULTING SERVICES FOR DESIGN AND
3000 3000 3000
SUPERVISION CONSULTANT (DSC)
9000
A B C D
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
TABEL PENULANGAN SLOOF
15X15 Farming System in Upland Areas
Project (UPLAND)
S1
OWNER
TULANGAN 4 Ø 10 Besi 10 mm Full
BEGEL Ø 6 - 200 Besi 6 mm Full
MINISTRY OF AGRICULTURE
4
S1 S1 S1 Directorate General of Agricultural
Infrastructure and Facilities
2000
S1 S1 S1 S1
PEKERJAAN
2000
6000
S1 S1 S1 S1 Tasikmalaya Regency
2 Nuraedidin,SIP
NIP.19650540 198403 1 001
2000
S1 S1 S1 S1
1
CONSULTING SERVICES FOR DESIGN AND
3000 3000 SUPERVISION CONSULTANT (DSC)
3000
9000
A B C D Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
TABEL PENULANGAN RING BALOK
15X20
Farming System in Upland Areas
Project (UPLAND)
RB
OWNER
TULANGAN 4 Ø 10 Besi 10 mm Full
BEGEL Ø 8 - 200 Besi 8 mm Full
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
4 Infrastructure and Facilities
RB RB RB
PEKERJAAN
2000
RB RB RB RB
BIODIGESTER KANDANG SAPI
3 HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
2000
6000
RB RB RB RB
Nuraedidin,SIP
2 NIP.19650540 198403 1 001
2000
RB RB RB RB
RB RB RB
1 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
3000 3000
3000
9000
Ir.Haris Prastyo,MT
A B D
Team Leader
C
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
2000
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
3
BIODIGESTER KANDANG SAPI
2000
6000
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
2
2000
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DENAH PONDASI DRAWING NAME
SKALA 1 : 100
DENAH PONDASI
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
700
OWNER
3000 3000
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
2000
BAK FERMENTASI
Nuraedidin,SIP
NIP.19650540 198403 1 001
700
6000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
DENAH
SKALA 1 : 100 2000
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 07
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
Nuraedidin,SIP
TANAH URUG NIP.19650540 198403 1 001
PASIR URUG
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DETAIL PONDASI
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
9000 PROJECT
The Development of Integrated
3000 3000 3000 Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
3000
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
1500
Tasikmalaya Regency
R.KANTOR GUDANG
±0.000 ±0.000 Nuraedidin,SIP
NIP.19650540 198403 1 001
1500
KM/WC
-0.050
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DENAH
1 DENAH
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
9000
3000 OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
6000
6000
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
1500
Nuraedidin,SIP
NIP.19650540 198403 1 001
Pas. Transram
Sloof 15/20
KERAMIK 40x40 cm Ir.Haris Prastyo,MT
SPESI
Lantai Keramik
±0.00
Lantai Keramik
±0.00
PASAR URUG
Team Leader
TANAH URUG
DRAWING NAME
PASANGAN BATU KALI
PASIR URUG
DENAH PONDASI
DATE
SHOP DRAWING
9000
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
R.UPPO
3000
±0.000
K1
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
6000
PEKERJAAN
1500
K1 K1
Torn 250Ltr
K1
Nuraedidin,SIP
NIP.19650540 198403 1 001
K1
DATE
SHOP DRAWING
PROJECT
Kusen Pintu
Kusen Pintu
Kayu
Kayu The Development of Integrated
Daun Pintu
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
1 KUSEN PINTU (P1) 2 BH 1 KUSEN PINTU (P2) 1 KUSEN PINTU (P3)
SKALA 1 : 20 SKALA 1 : 25 SKALA 1 : 25
Nuraedidin,SIP
NIP.19650540 198403 1 001
Kaca Kaca
Polos Polos
5 5
Kusen Jendela mm mm
Kayu
Daun Jendela
Double Teak Wood Kaca
Kaca Polos
Polos
5
mm
5
mm CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
Ir.Haris Prastyo,MT
Lokasi
Kusen Jendela (J1)
Ruang Kantor Lokasi
Kusen Jendela (J2)
Kamar Mandi
Team Leader
Bahan Kusen: Kayu, Daun Jendela Bahan Kusen: Kayu
Jumlah 1 set Jumlah 1 set
Asesories Engsel , Kait Angin Asesories DRAWING NAME
DETAIL PINTU
1 DETAIL KUSEN
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
11000
PROJECT
1000 9000 1000 The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
1000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
6000
8000
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
3 OWNER
K1 K1 K1 K1
3000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
6000
K1 K1 BIODIGESTER KANDANG SAPI
2
K1 K1 K1 HEAD OF AGRICULTURE
DEPARTEMENT
3000
Tasikmalaya Regency
K2 K1
Nuraedidin,SIP
NIP.19650540 198403 1 001
1
K1 K1 K1 K1 K1
1250 2500 2250 3000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
9000
Ir.Haris Prastyo,MT
A B C D E Team Leader
DRAWING NAME
DENAH KOLOM
1 DENAH KOLOM
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
3 Farming System in Upland Areas
S1 S1 S1 Project (UPLAND)
OWNER
3000
S1 S1
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
6000
Infrastructure and Facilities
S1 S1 S1 PEKERJAAN
2
BIODIGESTER KANDANG SAPI
3000
S1 S1 S1 S1 HEAD OF AGRICULTURE
S1 DEPARTEMENT
Tasikmalaya Regency
S1 S1 S1 S1
1 Nuraedidin,SIP
NIP.19650540 198403 1 001
9000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
A B C D E
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
RB RB RB
3
OWNER
RB RB
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
6000
PEKERJAAN
RB RB
2 BIODIGESTER KANDANG SAPI
RB HEAD OF AGRICULTURE
3000
DEPARTEMENT
RB Tasikmalaya Regency
RB RB RB
Nuraedidin,SIP
RB RB RB RB NIP.19650540 198403 1 001
1
1250 2500 2250 3000
A B C D E Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
B1 Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
TABEL PENULANGAN KOLOM Project (UPLAND)
15X15 OWNER
K1
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
TULANGAN 4Ø8 BESI 8 MM FULL
BEGEL Ø 6 - 200 BESI 6 MM FULL BIODIGESTER KANDANG SAPI
TABEL PENULANGAN KOLOM TABEL PENULANGAN BALOK TABEL PENULANGAN SLOOF Nuraedidin,SIP
NIP.19650540 198403 1 001
15X15 15X20 15X20
TULANGAN 4Ø8 BESI 8 MM FULL TULANGAN 4 Ø 10 BESI 10 MM FULL TULANGAN 4 Ø 10 BESI 10 MM FULL Ir.Haris Prastyo,MT
BEGEL Ø 6 - 200 BESI 6 MM FULL BEGEL Ø 6 - 200 BESI 6 MM FULL BEGEL Ø 6 - 200 BESI 6 MM FULL Team Leader
DRAWING NAME
1 TABEL PENULANGAN
NTS
TABEL PENULANGAN
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
B1 Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
DETAIL PONDASI Team Leader
Scale: 1: 15
DRAWING NAME
DETAIL PONDASI
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
DETAIL PONDASI
Team Leader
Scale: 1: 15
DRAWING NAME
DETAIL PONDASI
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
800 The Development of Integrated
300
Farming System in Upland Areas
Ø12-150 mm
Project (UPLAND)
A A
250
850
OWNER
Torn Kapasitas 500 Liter
300
Ø12-150 mm
1000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
TABEL PENULANGAN KOLOM TABEL PENULANGAN BALOK PEKERJAAN
150X150 150 x 150
BIODIGESTER KANDANG SAPI
HEAD OF AGRICULTURE
K1 B1 DEPARTEMENT
2500
Tasikmalaya Regency
TULANGAN 4 Ø 10 TULANGAN 4 Ø 10
Nuraedidin,SIP
BEGEL Ø 8 - 200 BEGEL Ø 8 - 200 NIP.19650540 198403 1 001
Ø8-150 mm
6Ø12 mm
SLOOF 15/20
K1
Ir.Haris Prastyo,MT
50 200 50
Team Leader
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
NOK BUBUNGAN
RING BALOK 15/20
KAKI KUDA-KUDA 10/10
GORDING 5/10 MINISTRY OF AGRICULTURE
BUBUNGAN Directorate General of Agricultural
+4.650 Infrastructure and Facilities
PEKERJAAN
Nuraedidin,SIP
NIP.19650540 198403 1 001
R.KANTOR GUDANG
±0.000 ±0.000 -0.200
LANTAI DASAR
±0.000 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
POTONGAN A-A
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
NOK
ASBES GELOMBANG ATAP
BALOK 10/10 +4.650
BALOK 10/10
BALOK 5/10 MINISTRY OF AGRICULTURE
BALOK 2X6/12
Directorate General of Agricultural
BALOK 10/10 Infrastructure and Facilities
PEKERJAAN
RING BALOK
+3.000
BIODIGESTER KANDANG SAPI
RB 15X20 cm
RB 15X20 cm
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
LANTAI DASAR
±0.000
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
1 POTONGAN B-B
SKALA 1 : 100
POTONGAN B-B
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
1 TAMPAK DEPAN
SKALA 1 : 100
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
TAMPAK DEPAN
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
1 TAMPAK BELAKANG
SKALA 1 : 100 Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
TAMPAK BELAKANG
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
1 TAMPAK SAMPING KANAN BIODIGESTER KANDANG SAPI
SKALA 1 : 100
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
Nuraedidin,SIP
NIP.19650540 198403 1 001
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
TAMPAK SAMPING
SCALE Drawn by :
Checked by :
Approved by :
1 TAMPAK SAMPING KIRI CODE DRAWING NO. 01
SKALA 1 : 100
DATE
SHOP DRAWING
PROJECT
JALUR DARI SUMUR/ MATA AIR The Development of Integrated
Farming System in Upland Areas
9000
Project (UPLAND)
±0.000 PEKERJAAN
K3
BIODIGESTER KANDANG SAPI
HEAD OF AGRICULTURE
DEPARTEMENT
6000
Tasikmalaya Regency
1500
Nuraedidin,SIP
NIP.19650540 198403 1 001
R.KANTOR GUDANG
±0.000 ±0.000
KM/WC
-0.050
1500
K3 K3
Torn 250Ltr
K2 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
K3
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
DATE
SHOP DRAWING
SUMUR RESEPAN
PROJECT
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
PEKERJAAN
R.UPPO
BIODIGESTER KANDANG SAPI
3000
±0.000
K3
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
6000
Nuraedidin,SIP
NIP.19650540 198403 1 001
R.KANTOR GUDANG
±0.000 ±0.000
KM/WC
-0.050
K3
K3 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
K2
K3 Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
KETERANGAN
DENAH AIR KOTOR
AIR DARI CLOSET PIPA 4"
DATE
SHOP DRAWING
PROJECT
The Development of Integrated
9000 Farming System in Upland Areas
Project (UPLAND)
3000 3000 3000
OWNER
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
R.UPPO Infrastructure and Facilities
3000
±0.000
PEKERJAAN
KETERANGAN
BIODIGESTER KANDANG SAPI
STOP KONTAK 200 W
PANEL LISTRIK
HEAD OF AGRICULTURE
6000
MCB 4A MCB
DEPARTEMENT
LAMPU
Tasikmalaya Regency
SAKLAR GANDA
SAKLAR TUNGGAL
Nuraedidin,SIP
NIP.19650540 198403 1 001
KM/WC
-0.050
R.KANTOR GUDANG
±0.000 ±0.000
Ir.Haris Prastyo,MT
PL - 1 Team Leader
DRAWING NAME
DATE