SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
KOORDINAT
7°40'32"S 108°3'50"E
PETA

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
SAWAH Farming System in Upland Areas
Project (UPLAND)

KEBUN MILIK WARGA OWNER

KEBUN MILIK WARGA

1059
8170

BAK FERMENTASI

1
1
MATA AIR 120x220 MINISTRY OF AGRICULTURE

1
KEBUN MILIK WARGA
Directorate General of Agricultural

2
87
Infrastructure and Facilities

14
1

1
PEKERJAAN

1
BIODIGESTER KANDANG SAPI

1
JALAN TANAH BIASA

1469
3918

HEAD OF AGRICULTURE
-0.050
KM/WC
±0.000
GUDANG ±0.000
R.KANTOR

DEPARTEMENT
KEBUN MILIK WARGA

9
8

0
42

91
Tasikmalaya Regency
11

9298

KEBUN MILIK WARGA Nuraedidin,SIP


KEBUN MILIK WARGA NIP.19650540 198403 1 001
00
70

00
90
18000

+0.00
ATAS CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
JALAN COR

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

SITE PLAN
Scale: 1: 150 SITE PLAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

1000

1000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

2000
BAK FERMENTASI
1 1 1 1 1 1 1
PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE

2000

6000

8000
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

2000
1 1 1 1 1 1

1000

1000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

1000 1500 1500 1500 1500 1500 1500 2000 1000

1000 9000 2000 1000 Ir.Haris Prastyo,MT


Team Leader
13000
DRAWING NAME

DENAH

SCALE Drawn by :
DENAH Checked by :
SKALA 1 : 100 Approved by :
CODE DRAWING NO. 02

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

8000
BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

13000 CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH ATAP
DENAH ATAP
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 03

DATE
SHOP DRAWING

BALOK 10/10
+4.600
BALOK 10/10

GORDING 5/10

ASBES GELOMBANG

BALOK 6/12 PROJECT


The Development of Integrated

27°
+2.800 Farming System in Upland Areas
Project (UPLAND)
RING BALOK RING BALOK
15/20
15/20
KOLOM 150 X 150 cm
+1.800 OWNER
TALANG PAKAN TALANG PAKAN
+1.200

+0.800
SLOOF 15/15
PONDASI BATU KALI ± 0.000

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
-1.000
Infrastructure and Facilities

PEKERJAAN
2000 2000 2000
BIODIGESTER KANDANG SAPI
6000

POTONGAN B-B HEAD OF AGRICULTURE


SKALA 1 : 100
DEPARTEMENT
Tasikmalaya Regency

NOK/BUBUNGAN

RENG SIMETRIS 0.45


Nuraedidin,SIP
KANAL C TRUSS C75x35x0.75mm
NIP.19650540 198403 1 001
+4.600

CONSULTING SERVICES FOR DESIGN AND


+2.800 SUPERVISION CONSULTANT (DSC)

KOLOM 150 X 150 cm +1.800

TALANG PAKAN
Ir.Haris Prastyo,MT
+1.200
Team Leader
+0.800
SLOOF 15/15 DRAWING NAME
PONDASI BATU KALI ± 0.000

POTONGAN A-A,B-B
-1.000
3000 3000 SCALE Drawn by :

9000 Checked by :
Approved by :
POTONGAN A-A CODE DRAWING NO. 04
SKALA 1 : 100

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas

27°
Project (UPLAND)
RING BALOK
RING BALOK
15/20 15/20 OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI


TAMPAK SAMPING KANAN
SKALA 1 : 100

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

TAMPAK SAMPING KANAN


TAMPAK MEMANJANG DAN TAMPAK MEMANJANG
SKALA 1 : 100

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 05

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

RING BALOK
15/20

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

TAMPAK SAMPING KIRI


SKALA 1 : 100 HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

TAMPAK SAMPING KIRI DAN


TAMPAK BELAKANG TAMPAK BELAKANG
SKALA 1 : 100

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 06

DATE
SHOP DRAWING

PROJECT
TABEL PENULANGAN KOLOM
15X15 The Development of Integrated
Farming System in Upland Areas
K1 Project (UPLAND)

TULANGAN
BEGEL
4 Ø 10
Ø 6 - 200
Besi 10 mm Full
Besi 6 mm Full
OWNER

4 MINISTRY OF AGRICULTURE
K1 K1 K1 K1
Directorate General of Agricultural
Infrastructure and Facilities

2000
PEKERJAAN

BIODIGESTER KANDANG SAPI


3
K1 K1 K1 K1
HEAD OF AGRICULTURE
DEPARTEMENT

2000

6000
Tasikmalaya Regency

2
K1 K1 K1 K1 Nuraedidin,SIP
NIP.19650540 198403 1 001

2000
1
K1 K1 K1 K1
CONSULTING SERVICES FOR DESIGN AND
3000 3000 3000
SUPERVISION CONSULTANT (DSC)
9000

A B C D
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH KOLOM DENAH KOLOM DAN TABEL


SKALA 1 : 100
PENULANGAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
TABEL PENULANGAN SLOOF
15X15 Farming System in Upland Areas
Project (UPLAND)
S1

OWNER
TULANGAN 4 Ø 10 Besi 10 mm Full
BEGEL Ø 6 - 200 Besi 6 mm Full

MINISTRY OF AGRICULTURE
4
S1 S1 S1 Directorate General of Agricultural
Infrastructure and Facilities

2000
S1 S1 S1 S1
PEKERJAAN

BIODIGESTER KANDANG SAPI


3
HEAD OF AGRICULTURE
DEPARTEMENT

2000

6000
S1 S1 S1 S1 Tasikmalaya Regency

2 Nuraedidin,SIP
NIP.19650540 198403 1 001

2000
S1 S1 S1 S1

1
CONSULTING SERVICES FOR DESIGN AND
3000 3000 SUPERVISION CONSULTANT (DSC)
3000
9000

A B C D Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH SLOOF DENAH SLOOF DAN TABEL


SKALA 1 : 100 PENULANGAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
TABEL PENULANGAN RING BALOK
15X20
Farming System in Upland Areas
Project (UPLAND)
RB

OWNER
TULANGAN 4 Ø 10 Besi 10 mm Full
BEGEL Ø 8 - 200 Besi 8 mm Full

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
4 Infrastructure and Facilities
RB RB RB

PEKERJAAN

2000
RB RB RB RB
BIODIGESTER KANDANG SAPI

3 HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

2000

6000
RB RB RB RB

Nuraedidin,SIP
2 NIP.19650540 198403 1 001

2000
RB RB RB RB

RB RB RB
1 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
3000 3000
3000
9000

Ir.Haris Prastyo,MT
A B D
Team Leader
C
DRAWING NAME

DENAH RING BALK DENAH RING BALK DAN


SKALA 1 : 100 TABEL PENULANGAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE

2000
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN
3
BIODIGESTER KANDANG SAPI

2000

6000
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
2

2000
Nuraedidin,SIP
NIP.19650540 198403 1 001

3000 3000 CONSULTING SERVICES FOR DESIGN AND


3000 SUPERVISION CONSULTANT (DSC)
9000
A B C D

Ir.Haris Prastyo,MT
Team Leader
DENAH PONDASI DRAWING NAME
SKALA 1 : 100

DENAH PONDASI

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

700
OWNER

3000 3000

6000 MINISTRY OF AGRICULTURE


Directorate General of Agricultural
Infrastructure and Facilities
TAMPAK DEPAN
SKALA 1 : 100 PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
2000

BAK FERMENTASI
Nuraedidin,SIP
NIP.19650540 198403 1 001

700
6000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
DENAH
SKALA 1 : 100 2000

TAMPAK SAMPING KIRI Ir.Haris Prastyo,MT


SKALA 1 : 100
Team Leader
DRAWING NAME

DENAH DAN TAMPAK BAK


FERMENTASI

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 07

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

PASIR URUG HEAD OF AGRICULTURE


±0.00 ±0.00 DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
TANAH URUG NIP.19650540 198403 1 001

PASANGAN BATU KALI

PASIR URUG
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DETAIL PONDASI

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

9000 PROJECT
The Development of Integrated
3000 3000 3000 Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
3000

Directorate General of Agricultural


Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI


6000

HEAD OF AGRICULTURE
DEPARTEMENT
1500

Tasikmalaya Regency

R.KANTOR GUDANG
±0.000 ±0.000 Nuraedidin,SIP
NIP.19650540 198403 1 001
1500

KM/WC
-0.050

1250 2500 2250 CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH
1 DENAH
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

9000

3000 3000 3000


PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

3000 OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
6000

6000
PEKERJAAN

BIODIGESTER KANDANG SAPI


1500

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
1500

Nuraedidin,SIP
NIP.19650540 198403 1 001

1250 2500 2250 3000 CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Pas. Dinding 1/2 bata

Pas. Transram

Sloof 15/20
KERAMIK 40x40 cm Ir.Haris Prastyo,MT
SPESI
Lantai Keramik
±0.00
Lantai Keramik
±0.00
PASAR URUG
Team Leader

TANAH URUG
DRAWING NAME
PASANGAN BATU KALI

PASIR URUG

DENAH PONDASI

1 DENAH PONDASI SCALE Drawn by :


SKALA 1 : 100
DETAIL PONDASI FOOT PLATE Checked by :
DETAIL PONDASI
Scale: 1: 15
Scale: 1: 15 Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

9000

3000 3000 3000

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

R.UPPO
3000

±0.000

K1

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
6000

Infrastructure and Facilities

PEKERJAAN
1500

BIODIGESTER KANDANG SAPI

R.KANTOR GUDANG HEAD OF AGRICULTURE


±0.000 ±0.000 DEPARTEMENT
KM/WC
-0.050 Tasikmalaya Regency
1500

K1 K1
Torn 250Ltr
K1

Nuraedidin,SIP
NIP.19650540 198403 1 001
K1

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

1 DENAH POLA LANTAI


SKALA 1 : 100 Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

LEGENDA DENAH POLA LANTAI


NO KODE NAMA RUANGAN
1
SCALE Drawn by :
2 Checked by :
FLOOR SLAB BETON Approved by :
3 K1 R. UPPO, GUDANG DAN KANTOR
K 225 TEBAL 7CM
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
Kusen Pintu
Kusen Pintu
Kayu
Kayu The Development of Integrated
Daun Pintu
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN
1 KUSEN PINTU (P1) 2 BH 1 KUSEN PINTU (P2) 1 KUSEN PINTU (P3)
SKALA 1 : 20 SKALA 1 : 25 SKALA 1 : 25

BIODIGESTER KANDANG SAPI

Kusen Pintu (P1) Kusen Pintu (P2) Kusen Pintu (P3)


Lokasi
Bahan
Ruang Kantor dan Gudang
Kusen: Kayu, Daun Jendela Panel Kayu
Lokasi
Bahan
R. UPPO
Kusen: Besi Plat
Lokasi
Bahan
Toilet
Kusen: Kayu, Daun Pintu Lapis Galvalum
HEAD OF AGRICULTURE
Jumlah
Asesories
2 set
Engsel Pintu, Handle pintu
Jumlah
Asesories
1 set
Engsel Pintu, Handle pintu
Jumlah
Asesories
1 set
Engsel Pintu, Handle pintu DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

Kaca Kaca
Polos Polos
5 5
Kusen Jendela mm mm
Kayu

Daun Jendela
Double Teak Wood Kaca
Kaca Polos
Polos
5
mm
5
mm CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

1 KUSEN JENDELA (J1) 1 KUSEN JENDELA (J2)


SKALA 1 : 25
SKALA 1 : 25

Ir.Haris Prastyo,MT
Lokasi
Kusen Jendela (J1)
Ruang Kantor Lokasi
Kusen Jendela (J2)
Kamar Mandi
Team Leader
Bahan Kusen: Kayu, Daun Jendela Bahan Kusen: Kayu
Jumlah 1 set Jumlah 1 set
Asesories Engsel , Kait Angin Asesories DRAWING NAME

DETAIL PINTU
1 DETAIL KUSEN
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 DENAH ATAP DENAH ATAP


SKALA 1 : 100

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

11000
PROJECT
1000 9000 1000 The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER
1000

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
6000
8000

Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)
1000

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 DENAH RANGKA ATAP


SKALA 1 : 100 DENAH RANGKA ATAP

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)
3 OWNER
K1 K1 K1 K1

3000
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

6000
K1 K1 BIODIGESTER KANDANG SAPI
2
K1 K1 K1 HEAD OF AGRICULTURE
DEPARTEMENT

3000
Tasikmalaya Regency
K2 K1
Nuraedidin,SIP
NIP.19650540 198403 1 001
1
K1 K1 K1 K1 K1
1250 2500 2250 3000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
9000

Ir.Haris Prastyo,MT
A B C D E Team Leader
DRAWING NAME

DENAH KOLOM
1 DENAH KOLOM
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
3 Farming System in Upland Areas
S1 S1 S1 Project (UPLAND)

OWNER

3000
S1 S1

MINISTRY OF AGRICULTURE
Directorate General of Agricultural

6000
Infrastructure and Facilities
S1 S1 S1 PEKERJAAN
2
BIODIGESTER KANDANG SAPI

3000
S1 S1 S1 S1 HEAD OF AGRICULTURE
S1 DEPARTEMENT
Tasikmalaya Regency

S1 S1 S1 S1
1 Nuraedidin,SIP
NIP.19650540 198403 1 001

1250 2500 2250 3000

9000
CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

A B C D E
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 DENAH SLOOF DENAH SLOOF


SKALA 1 : 100

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

RB RB RB
3
OWNER

RB RB
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

6000
PEKERJAAN
RB RB
2 BIODIGESTER KANDANG SAPI

RB HEAD OF AGRICULTURE

3000
DEPARTEMENT
RB Tasikmalaya Regency
RB RB RB

Nuraedidin,SIP
RB RB RB RB NIP.19650540 198403 1 001
1
1250 2500 2250 3000

CONSULTING SERVICES FOR DESIGN AND


9000 SUPERVISION CONSULTANT (DSC)

A B C D E Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH RING BALOK


1 DENAH RING BALOK
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

TABEL PENULANGAN BALOK


15X20 MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT

B1 Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

TULANGAN 4 Ø 10 BESI 10 MM FULL


BEGEL Ø 6 - 200 BESI 6 MM FULL
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 TABEL PENULANGAN TABEL PENULANGAN


NTS

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
TABEL PENULANGAN KOLOM Project (UPLAND)
15X15 OWNER

K1
MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN
TULANGAN 4Ø8 BESI 8 MM FULL
BEGEL Ø 6 - 200 BESI 6 MM FULL BIODIGESTER KANDANG SAPI

1 TABEL PENULANGAN HEAD OF AGRICULTURE


NTS
DEPARTEMENT
Tasikmalaya Regency

TABEL PENULANGAN KOLOM TABEL PENULANGAN BALOK TABEL PENULANGAN SLOOF Nuraedidin,SIP
NIP.19650540 198403 1 001
15X15 15X20 15X20

K1 B1 S1 CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

TULANGAN 4Ø8 BESI 8 MM FULL TULANGAN 4 Ø 10 BESI 10 MM FULL TULANGAN 4 Ø 10 BESI 10 MM FULL Ir.Haris Prastyo,MT
BEGEL Ø 6 - 200 BESI 6 MM FULL BEGEL Ø 6 - 200 BESI 6 MM FULL BEGEL Ø 6 - 200 BESI 6 MM FULL Team Leader
DRAWING NAME
1 TABEL PENULANGAN
NTS

TABEL PENULANGAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

TABEL PENULANGAN BALOK


15X20 MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
B1 Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

TULANGAN 4 Ø 10 BESI 10 MM FULL


BEGEL Ø 6 - 200 BESI 6 MM FULL
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 TABEL PENULANGAN TABEL PENULANGAN BALOK


NTS

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

1 DETAIL PONDASI DETAIL PONDASI


SKALA NCS
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
DETAIL PONDASI Team Leader
Scale: 1: 15
DRAWING NAME

DETAIL PONDASI

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
DETAIL PONDASI
Team Leader
Scale: 1: 15
DRAWING NAME

DETAIL PONDASI

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
800 The Development of Integrated

300
Farming System in Upland Areas

Ø12-150 mm
Project (UPLAND)
A A

250

850
OWNER
Torn Kapasitas 500 Liter

300
Ø12-150 mm
1000

300 250 300


1335
850
150

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities
TABEL PENULANGAN KOLOM TABEL PENULANGAN BALOK PEKERJAAN
150X150 150 x 150
BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
K1 B1 DEPARTEMENT
2500

Tasikmalaya Regency

TULANGAN 4 Ø 10 TULANGAN 4 Ø 10
Nuraedidin,SIP
BEGEL Ø 8 - 200 BEGEL Ø 8 - 200 NIP.19650540 198403 1 001
Ø8-150 mm

6Ø12 mm

TABEL PENULANGAN SLOOF TABEL PENULANGAN KOLOM


CONSULTING SERVICES FOR DESIGN AND
250X250 SUPERVISION CONSULTANT (DSC)
1000

SLOOF 15/20
K1
Ir.Haris Prastyo,MT
50 200 50

Team Leader

Ø12-150 mm DRAWING NAME


50 250 350 250 Ø12-150 mm
TULANGAN 4 Ø 12 TULANGAN 4 Ø 10
850 BEGEL Ø 8 - 150 BEGEL Ø 6 - 150

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

NOK BUBUNGAN
RING BALOK 15/20
KAKI KUDA-KUDA 10/10
GORDING 5/10 MINISTRY OF AGRICULTURE
BUBUNGAN Directorate General of Agricultural
+4.650 Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

RING BALOK HEAD OF AGRICULTURE


+3.000
PINTU BESI DEPARTEMENT
RB 15X15 cm RB 15X15 cm RB 15X20 cm RB 15X15 cm +2.750 Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

R.KANTOR GUDANG
±0.000 ±0.000 -0.200
LANTAI DASAR
±0.000 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

1245 2500 2255 3000


Ir.Haris Prastyo,MT
9000 Team Leader
DRAWING NAME

POTONGAN A-A

1 POTONGAN A-A SCALE Drawn by :


SKALA 1 : 100
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

NOK
ASBES GELOMBANG ATAP
BALOK 10/10 +4.650
BALOK 10/10
BALOK 5/10 MINISTRY OF AGRICULTURE
BALOK 2X6/12
Directorate General of Agricultural
BALOK 10/10 Infrastructure and Facilities

PEKERJAAN
RING BALOK
+3.000
BIODIGESTER KANDANG SAPI
RB 15X20 cm
RB 15X20 cm
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001
LANTAI DASAR
±0.000

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME
1 POTONGAN B-B
SKALA 1 : 100
POTONGAN B-B

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

1 TAMPAK DEPAN
SKALA 1 : 100
Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

TAMPAK DEPAN

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO. 01

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN

BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

1 TAMPAK BELAKANG
SKALA 1 : 100 Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

TAMPAK BELAKANG

SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
Farming System in Upland Areas
Project (UPLAND)

OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN
1 TAMPAK SAMPING KANAN BIODIGESTER KANDANG SAPI
SKALA 1 : 100

HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency

Nuraedidin,SIP
NIP.19650540 198403 1 001

CONSULTING SERVICES FOR DESIGN AND


SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

TAMPAK SAMPING

SCALE Drawn by :
Checked by :
Approved by :
1 TAMPAK SAMPING KIRI CODE DRAWING NO. 01
SKALA 1 : 100

DATE
SHOP DRAWING

PROJECT
JALUR DARI SUMUR/ MATA AIR The Development of Integrated
Farming System in Upland Areas
9000
Project (UPLAND)

3000 3000 3000 OWNER

KETERANGAN MINISTRY OF AGRICULTURE


Directorate General of Agricultural
JALUR AIR BERSIH Infrastructure and Facilities
R.UPPO
3000

±0.000 PEKERJAAN
K3
BIODIGESTER KANDANG SAPI

HEAD OF AGRICULTURE
DEPARTEMENT
6000

Tasikmalaya Regency
1500

Nuraedidin,SIP
NIP.19650540 198403 1 001
R.KANTOR GUDANG
±0.000 ±0.000
KM/WC
-0.050
1500

K3 K3
Torn 250Ltr
K2 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)

K3

Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

DENAH AIR BERSIH


1 DENAH AIR BERSIH
SKALA 1 : 100 Drawn by :
SCALE
Checked by :
Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

SUMUR RESEPAN

PROJECT

SEPTITANK The Development of Integrated


Farming System in Upland Areas
Project (UPLAND)
9000 OWNER

3000 3000 3000

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
Infrastructure and Facilities

PEKERJAAN
R.UPPO
BIODIGESTER KANDANG SAPI
3000

±0.000

K3
HEAD OF AGRICULTURE
DEPARTEMENT
Tasikmalaya Regency
6000

Nuraedidin,SIP
NIP.19650540 198403 1 001

R.KANTOR GUDANG
±0.000 ±0.000
KM/WC
-0.050
K3
K3 CONSULTING SERVICES FOR DESIGN AND
SUPERVISION CONSULTANT (DSC)
K2

K3 Ir.Haris Prastyo,MT
Team Leader
DRAWING NAME

KETERANGAN
DENAH AIR KOTOR
AIR DARI CLOSET PIPA 4"

AIR DARI FLOOR DRAIN PIPA 3"


SCALE Drawn by :
1 DENAH AIR KOTOR Checked by :
SKALA 1 : 100 Approved by :
CODE DRAWING NO.

DATE
SHOP DRAWING

PROJECT
The Development of Integrated
9000 Farming System in Upland Areas
Project (UPLAND)
3000 3000 3000
OWNER

MINISTRY OF AGRICULTURE
Directorate General of Agricultural
R.UPPO Infrastructure and Facilities
3000

±0.000
PEKERJAAN
KETERANGAN
BIODIGESTER KANDANG SAPI
STOP KONTAK 200 W

PANEL LISTRIK
HEAD OF AGRICULTURE
6000

MCB 4A MCB
DEPARTEMENT
LAMPU
Tasikmalaya Regency
SAKLAR GANDA

SAKLAR TUNGGAL

Nuraedidin,SIP
NIP.19650540 198403 1 001

KM/WC
-0.050
R.KANTOR GUDANG
±0.000 ±0.000

CONSULTING SERVICES FOR DESIGN AND


4A MCB
SUPERVISION CONSULTANT (DSC)

Ir.Haris Prastyo,MT
PL - 1 Team Leader
DRAWING NAME

DENAH INSTALASI LISTRIK


1 DENAH INTALASI LISTRIK
SKALA 1 : 100
SCALE Drawn by :
Checked by :
Approved by :
CODE DRAWING NO.

DATE