TAX ORDINANCE NO.

1, SERIES 2023 - Section 108 (d)(1-4) & (i) (13) (5)


1. Total Connected Load (kVA)
 5 kVA or Less - 200
2. Total Transformer/(UPS)/ Generator Capacity
 Not Included
3. Pole/Attachment
 5 kVA or Less - 30
 Guying Attachment - 30
4. Miscellaneous Fees
 Residential Electric Meter - 15
 Wiring Permit - 15
 Electrical Inspection (i)(13)(5) - 29
TOTAL = 319

TAX ORDINANCE NO. 1, SERIES 2023 - Section 108 (d)(1-4) & (i) (13) (5)
1. Total Connected Load (kVA)
 5 kVA or Less - 200
2. Total Transformer/(UPS)/ Generator Capacity
 Not Included
3. Pole/Attachment
 5 kVA or Less - 30
 Guying Attachment - 30
4. Miscellaneous Fees
 Residential Electric Meter - 15
 Wiring Permit - 15
 Electrical Inspection (i)(13)(5) - 29
TOTAL = 319

TAX ORDINANCE NO. 1, SERIES 2023 - Section 108 (d)(1-4) & (i) (13) (5)
1. Total Connected Load (kVA)
 5 kVA or Less - 200
2. Total Transformer/(UPS)/ Generator Capacity
 Not Included
3. Pole/Attachment
 5 kVA or Less - 30
 Guying Attachment - 30
4. Miscellaneous Fees
 Residential Electric Meter - 15
 Wiring Permit - 15
 Electrical Inspection (i)(13)(5) - 29
TOTAL = 319