ANNEXURE2-JOBSAFETYANALYSIS

JOBSAFETYANALYSIS JSANO: NKSTPP/FM/CHP/JSA/074 Date: 15-12-2023


JSADONEBY:
Standard Maint .Procedure# JOBPLAN# NKSTPP/CHP/33 PTW/LWC#
JOB(Brief Description) Working at Height TP#3
JOBLOCATION Department : CHP Maintenance
Job Plan Steps Hazards Control Measures Residual Person
Risk (High/ Responsible for
Medium/Low) Control Measure
Preparation of PTW Improper work permit ● Before start of work PTW must be taken Low Area Engineer
Manlift Collapse of Manlift (Aerial Lift) ● Proper inspection of aerial lift (man lift) set up by a Low Area Engineer
competent authority. Obtain aerial set up permit prior
to start the work (LWC).
● Placement of the Man lift should be on plan or stable
ground.
● Weight should not exceed rated lift capacity.
● Ensure wheel chocks, outriggers, and brakes on
a level surfacebefore work start
● Ensure Man lift operator is properly trained

● Ensuretheareaisbarricadedtopreventany
unauthorized personnel entry.
Aerial lift Hazards with tips and ● Man-lift should not move while the plate form is
Tricks elevated

● Personnelmustwearfullsafetyharnesseswhile working
at heights. 100% tie off shall be maintained while
working at heights. Weekly Inspections should be
carried out.
● Vertigotestofthelaborsmustbedonebefore
deployment in work.

EmergencyContactNos.-ControlRoom: CISFFire:9264443351 SafetyControl


Room:06559-256411
1
HOS*=HeadofSection
ANNEXURE2-JOBSAFETYANALYSIS
Working at Height Fall from height. ● Ensure Valid work at height permit. Low Area Engineer
Unsafe working platforms and ● Anypersonworkingabove2mheightshallbe
working conditions. considered as working at height.
Unsafe access/egress. Hit by ● Ensure all personnel assigned to work at height are
the structure. not afraid and medically fir for height works (Must
have cleared Vertigo tests).
● Work shall not be allowed to be carried out standing
over wooden boxes, empty barrels ,and other
makeshift arrangements.
● In case of practical difficulties to provide working
platform, safety harness with fall arrestors (Self
inertia reels) shall be installed and used.
● For small openings floor covers shall be provided
with adequate strength.
● Stop work at height in high wind velocity.
● Home made ladders not to be used.
● Ladders with broken rug not to be used.

PPEREQUIRED(Yes/No) Hemet Safety Gloves Eye/Face protection SafetyHarness Respiratory Protection OtherPPE
Shoes
ADDITIONAL
PRECAUTIONS/CONTROL MEASURES
IF ANY:
FURTHERPRECAUTIONS/
CONTROL MEASURES IF ANY:

TOOLBOXTALK/PEPTALK GIVEN
BY

EmergencyContactNos.-ControlRoom: CISFFire:9264443351 SafetyControl


Room:06559-256411
2