1. Regarding the data on sheets-7 and -8.

The graph on the bottom right of sheet 7 shows that K56, the downtime of setting program and robot trouble are 13%( same
time). The graph on sheet 8 shows that robot trouble is 1,500 (minutes) and setting program is 1,200 (minutes).
There is a difference in the data between sheet 7 and 8.
Which data is correct?
Answer : after I checked the data, I think the data on slide 7 is a bit wrong, so please use the data on slide 8, I will correct it for
slide 7.

2. Regarding the past countermeasures From 2020 to 2022, NM has implemented 8 major improvements. When NM checks the
problem that occurred during the downtime in 2023 and from January to March this year, Will there be no recurrence of 8
improvements?. I want to find out whether the current problem is a recurrence of something that happened in the past or
whether it’s a new problem. Please conduct a detailed fact-check regarding the problems in each process in 2023 or 2024 from
January to March.
Answer : In 2024, there will still be several recurring incidents of problems that were corrected in the previous year, so this can
be said to be a recurring problem.

3. Regarding the improvement of historical sheets, There is cleaning , but is this done before each shift , daily, etc.? How is it
managed specifically? Also, how do you manage maintenance including part change(replacement)?
Answer : Cleaning process was doing by Maintenance 1x/month, and controlled by checksheet preventive, for Part Change it
controlled stock by Warehouse with minimum stock.
4. Regarding the capacity up in production of theme 2, we are considering using K03/K18 line as model lines.
In order to increase productivity, there are ideas for increasing efficiency by adding more lines
or by reducing waste and shortening cycle time.
First, check the detailed process of drilling process and see what difference there is between the cycle time set at the design
stage. and the actual cycle time.
Answer
We will Check the previous version at design and explain on Power point, but we see that loading is available if there are
additional processes in the robot in line machining, which is possible, so it possibly to improve process on Machining area.