FOUNDATION NOTES: STRUCTURAL DESIGN CRITERIA: DRAWING LIST:

GENERAL NOTES: HOOKS.


SPECIAL INSPECTIONS CODE/SECTION
1. ALL FOOTINGS SHALL BEAR ON SOIL WITH 3TONS/ FT2 BEARING 24. ALL CONCRETE SHALL BE CURED FOR A MINIMUM OF 4 DAYS. 1. CODES AND STANDARDS: FO-001 GENERAL NOTES
1. ALL WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE STRUCTURAL STEEL - WELDING BC 1704.3.1
CAPACITY CLASS "3B" OR BETTER. THE BOTTOM OF THE CURING SHALL BE PERFORMED BY COVERING FRESHLY PLACED PLOT PLAN
LATEST EDITION, (NYC BC 2014). CONCRETE WITH PLASTIC SHEETS AND MAINTAINING SHEETS IN 1.1. NYC BUILDING CODE (NYC BC 2014)
FOOTING ELEVATIONS AND SOIL BEARING CAPACITIES AS STRUCTURAL STEEL - DETAILS BC 1704.3.2
PLACE UNTIL CONCRETE IS CURED. 1.2. BUILDING CODE REQUIREMENTS FOR STRUCTURAL FO-101 FOUNDATION PLAN
2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND SHOWN ON THE DRAWINGS ARE ESTIMATED FROM THE SOIL
25. SEE ARCHITECTURAL DRAWINGS FOR TYPE AND LOCATION OF STRUCTURAL STEEL - HIGH STRENGTH BOLTING BC 1704.3.3 CONCRETE ( ACI 318-11) FOUNDATION SCHEDULE
CONDITIONS AT THE SITE AS REQUIRED TO VERIFY THE BEARING DATA. FINAL EXACT ELEVATIONS SHALL BE FIELD
DRAWINGS AND TO PERFORM THIS WORK PROPERLY. ANY VERIFIED BY THE GEOTECHNICAL CONSULTANT AND REVIEWED ALL FLOOR FINISHES, FLOOR DEPRESSIONS AND CURBS. STRUCTURAL COLD-FORMED STEEL BC 1704.3.4 R.C. GRADE BEAM AND R.C. PIER DETAIL
1.3. NORTH AMERICAN STANDARD FOR COLD FORMED STEEL
DISCREPANCY BETWEEN THE DRAWINGS AND THE SURVEY BY THE ARCHlTECT/ENGINEER DURING CONSTRUCTION. 26. SEE ARCHITECTURAL DRAWINGS FOR ALL STRUCTURAL FRAMING (AISI S240), AND NORTH AMERICAN FO-102 CELLAR PLAN
WATERPROOFING/DAMPROOFING DETAILS. CONCRETE - CAST-IN-PLACE BC 1704.4
SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S SPECIFICATION FOR THE DESIGN OF COLD FORMED STEEL
2. THE SOIL SUBGRADE FOR ALL FOOTINGS AND SLABS SHALL BE CONCRETE - PRECAST BC 1704.4 STRUCTURAL MEMBERS (AISI 100)
REPRESENTATIVE. 27. SEE ARCHITECTURAL, HVAC, ELECTRICAL AND PLUMBING FO-201 FOUNDATION SECTIONS AND DETAILS - 1
INSPECTED AND APPROVED BY THE OWNER'S TESTING DRAWINGS FOR ADDITIONAL WALL/SLAB OPENINGS. CONCRETE - PRESTRESSED BC 1704.4 1.4. SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS FO-202 FOUNDATION SECTIONS AND DETAILS - 2
3. DETAILS NOT SHOWN OR SPECIFIED BUT NECESSARY FOR LABORATORY IMMEDIATELY PRIOR TO PLACING FOUNDATION
28. SEE SPECIFICATION SECTION "CAST-IN-PLACE CONCRETE" FOR (ANSI/AISC 360-16) FO-203 FOUNDATION SECTIONS AND DETAILS -3
PROPER AND ACCEPTABLE CONSTRUCTION AND INSTALLATION CONCRETE OR CONCRETE MUD SLABS. MASONRY BC 1704.5
ADDITIONAL REQUIREMENTS.
OF ANY PART OF THE WORK AS DETERMINED BY THE OWNER 2. DESIGN LOADS AS PER BC 1604:
3. DO NOT BACK FILL AGAINST BASEMENT WALLS UNTIL GROUND WOOD INSTALLATION OF HIGH-LOAD DIAPHRAGMS BC 1704.6.1 01 01
REPRESENTATIVE SHALL BE INCLUDED IN THE WORK THE SAME FO-301 TYPICAL FOUNDATION DETAILS
FLOOR AND LOWER LEVEL SLABS HAVE BEEN PLACED AND THE 2.1. LIVE LOAD:
AS IF HEREIN SPECIFIED OR INDICATED WOOD INSTALLATION OF METAL PLATE-CONNECTED TRUSSES BC 1704.6.2
CONCRETE HAS ATTAINED FULL DESIGN STRENGTH. REINFORCING BAR NOTES: 2.1.1. ROOF TERRACE : 100 Psf
WOOD INSTALLATION OF PREFABRICATED I-JOIST BC 1704.6.3 FO-401 BORING PLAN
4. THE INTENT OF THE STRUCTURAL DRAWINGS IS TO SHOW THE
4. NO FOOTINGS OR SLABS SHALL BE PLACED INTO OR AGAINST 1. REINFORCING BARS TO BE DEFORMED AND CONFORM TO ASTM 2.1.2. BALCONY : 100 Psf BORING LOGS
MAIN STRUCTURAL FEATURES AND DESIGN FOR THE SUBGRADE INSPECTION BC 1704.7.1
SUBGRADE CONTAINING FREE WATER, FROST OR ICE. SHOULD A-996 GRADE 60 WITH MINIMUM YIELD STRESS Fy=60,000 PSI
COMPLETED PROJECT. FOR ARCHITECTURAL DETAILS AND 2.1.3. GROUND FLOOR (1ST) : 100 Psf
WATER OR FROST ENTER A PILE CAP OR FOOTING EXCAVATION SUBSURFACE CONDITIONS - FILL PLACEMENT & IN-PLACE DENSITY BC 1704.7.2, BC 1704.7.3
OTHER COMPONENTS THAT MAY BE NECESSARY TO 2. ALL CONTINUOUS REINFORCING BARS TO BE LAPPED 36 BAR
CONSTRUCT THE PROJECT SEE ARCHITECTURAL AND
AFTER SUBGRADE APPROVAL, THE SUBGRADE SHALL BE DIAMETERS AT SPLICES AND CORNERS UNLESS OTHERWISE SUBSURFACE INVESTIGATIONS (BORINGS/TEST PITS) TR4 BC 1704.7.4
2.1.4. CORRIDORS AND LOBBY : 100 Psf UNDER SEPARATE FILING:
RE-INSPECTED AFTER REMOVAL OF WATER OR FROST. INDICATED. LAP CONTINUOUS BOTTOM BARS AT SUPPORTS AND 2.1.5. RESIDENTIAL : 40 Psf
CONSULTANTS DRAWINGS. DEEP FOUNDATION ELEMENTS TR5 BC 1704.8 1. PROPOSED SIX (6) STORIES BUILDING NB # 321592184 DOC # 01
TOP BARS AT CENTER OF SPANS. SPLICES SPACED CLOSER THAN 2. BPP 340802126
5. THE CONTRACTOR (WHERE APPLICABLE) SHALL PROVIDE ALL 2.1.6. MECHANICAL ROOM : 150 Psf
5. REFER TO ARCHITECTURAL, HVAC, MECHANICAL AND 12 BAR DIAMETERS TO EACH OTHER OR 6" FROM ANY OUTSIDE HELICAL PILES (BB # 2014-020) TR5H BC 1704.8.5 3. BE B00395880
NECESSARY MEASURES TO PREVENT ANY FROST OR ICE FROM EDGE SHALL BE INCREASED TO 43 BAR DIAMETERS (20%).
ELECTRICAL DRAWINGS FOR VERIFICATION OF LOCATIONS AND 2.1.7. SNOW LOAD (ROOF) : 20 Psf 4. PL/SP B00395875
PENETRATING ANY FOOTING, OR SLAB SUBGRADE BEFORE AND VERTICAL MASONRY FOUNDATION ELEMENTS BC 1704.9
DIMENSIONS OF ALL CHASES, SLOTS, INSERTS, CURBS, 3. PROVIDE CORNER BARS AT ALL WALL INTERSECTIONS. 5. MS B00395883
AFTER PLACING OF CONCRETE AND UNTIL SUCH SUBGRADES 2.2. DEAD LOAD : PER MATERIAL
OPENINGS, SLEEVES, ANCHOR BOLTS, FLOOR PITCHES AND WALL PANELS, CURTAIN WALLS, AND VENEERS BC 1704.10 6. FO B00464973-I1
ARE FULLY PROTECTED BY THE PERMANENT RIDING 4. PROVIDE (1) #5 BAR x 3'-O' LONGER THAN OPENING FOR EACH 4" 2.3. PARTITION LOAD : 20 Psf
ALL OTHER PROJECT REQUIREMENTS NOT SHOWN ON SPRAYED FIRE-RESISTANT MATERIALS BC 1704.11
STRUCTURE. OF WALL THICKNESS, OVER ALL OPENINGS UNLESS OTHERWISE
STRUCTURAL DRAWINGS. THE CONTRACTOR IS RESPONSIBLE 2.4. GROUND SNOW LOAD, Pg : 20 Psf
INDICATED. MASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS BC 1704.12
FOR THE PROTECTION OF ALL STRUCTURES AGAINST DAMAGE 6. WHERE APPLICABLE, ALL 11-65 MATERIALS UNDER THE SLAB
DURING CONSTRUCTION. 5. ALL BARS SHALL BE HELD SECURELY IN PROPER POSITION WHILE 2.5. ROOF SNOW LOAD:
SHALL BE REMOVED, REPLACED WITH COMPACTED GRANULAR STRUCTURAL STABILITY - EXISTING BUILDINGS BC 1704.20.1
PLACING CONCRETE. IF REQUIRED, ADDITIONAL BARS OR
MATERIAL AND TOPPED OFF WITH 6 INCHES OF CRUSHED 2.5.1. FLAT ROOF SNOW LOAD, Pf : 20 Psf
6. SECTIONS AND DETAILS SHOWN SHALL BE CONSIDERED TO BE STIRRUPS SHALL BE PROVIDED BY THE CONTRACTOR TO EXCAVATIONS-SHEETING, SHORING, AND BRACING BC 1704.20.2
STONE. THE GRANULAR MATERIAL MAY BE SAND OR
TYPICAL FOR ALL SIMILAR CONDITIONS. PROPERLY SUPPORT BARS. 2.5.2. SNOW EXPOSURE FACTOR, Ce : 0.9
SAND/GRAVEL. UNDERPINNING BC 1704.20.3, BC 1814
7. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING 6. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL 2.5.3. SNOW LOAD IMPORTANCE FACTOR, I : 1.0
7. WHERE APPLICABLE, THE SOIL UNDER SLAB WHICH IS ON THE MECHANICAL DEMOLITION BC 1704.20.4
THE COMPLETE LAYOUT AND DETAILS OF ALL STRUCTURAL BE AS FOLLOWS:
GROUND SHALL BE COMPACTED TO HIGH DENSITY EQUIVALENT 2.5.4. THERMAL FACTOR, Ct : 1.0
WORK TO BE PERFORMED. THE CONTRACTOR MAY NOT RAISING AND MOVING OF A BUILDING BC 1704.20.5
a. FOOTINGS AND OTHER MEMBERS PLACED DIRECTLY ON
TO A MINIMUM OF 95% MAXIMUM DENSITY AT OPTIMUM 2.6. LATERAL LOAD:
PERFORM WORK UNTIL THE SHOP DRAWINGS HAVE BEEN GROUND 3" CONCRETE DESIGN MIX TR3 BC 1905.3, BC 1913.5
MOISTURE DETERMINE BY THE SOIL COMPACTION TEST (ASTM
APPROVED. b. CONCRETE THAT AFTER REMOVAL OF FORMS IS IN CONTACT 2.6.1. WIND LOAD:
D-1557). THE MAXIMUM LIFT FOR THE COMPACTION WILL BE 12 CONCRETE SAMPLING AND TESTING TR2 BC 1905.6, BC 1913.10
WITH THE GROUND OR EXPOSED TO WEATHER 2" FOR BARS 2.6.1.1. BASIC WIND SPEED : 120mph
ACCEPTED
8. ALL ELEVATIONS FOR ALL FLOORS ARE RELATIVE TO NAVD'88. INCHES.
LARGER THAN #5, AND 1-1/2" FOR #5 BARS OR SMALLER.
8. SEE ARCHITECTURAL DRAWINGS FOR ALL WATERPROOFING 2.6.1.2. WIND IMPORTANCE FACTOR, I : 1.0
c. SLABS AND WALLS NOT EXPOSED TO WEATHER OR GROUND
AND DAMPROOFING DETAILS. 2.6.1.3. EXPOSURE :B
EXCAVATION NOTES: 3/4".
PROGRESS INSPECTIONS CODE/SECTION Date: 01/19/2024
d. BEAMS AND GIRDERS NOT EXPOSED TO WEATHER OR 2.6.1.4. BASE SHEAR OF WIND LOAD (kips),
1. THE PERIMETER OF THE GENERAL EXCAVATION SHALL BE PRELIMINARY 28-116.2.1, BC 110.2
GROUND 1- 1 /2". 2.6.1.4.1. Vx : 53.589
RETAINED BY A SOIL RETENTION SYSTEM ( WHERE STRUCTURAL CONCRETE NOTES:
APPLICABLE). THE INSTALLATION, MAINTENANCE AND REMOVAL 7. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS IN FOOTING AND FOUNDATION BC 110.3.1
1. ALL CAST-IN-PLACE CONCRETE SHALL BE AIR ENTRAINED, 2.6.1.4.2. Vy : 139.921
(WHERE REQUIRED) SHALL BE THE COMPLETE AND SOLE THE FIELD AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. LOWEST FLOOR ELEVATION BC 110.3.2
NORMAL WEIGHT STONE CONCRETE, AND SHALL HAVE 6000 PSI 2.6.2. SEISMIC LOADS:
RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR MINIMUM 28 DAY COMPRESSIVE STRENGTH . 8. CONTRACTOR SHALL INSTALL ALL PIPE SLEEVES, BOXED STRUCTURAL WOOD FRAME BC 110.3.3
SHALL PROVIDE ALL MEASURES AND PRECAUTIONS OPENINGS, ANCHOR BOLTS, BEARING PLATES, ETC. AS REQUIRED 2.6.2.1. SITE CLASS :D
2. ALL REINFORCING BARS SHALL BE NEW BILLET STEEL

NORTH
NECESSARY TO PREVENT DAMAGE AND MINIMIZE SETTLEMENT FOR VARIOUS TRADES. FINAL 28-116.2.4.2, BC 110.5
CONFORMING TO THE STANDARDS OF ASTM A615 GRADE 60. 2.6.2.2. IMPORTANCE FACTOR, I : 1.0
OF EXISTING OR NEW CONSTRUCTION INSIDE AND OUTSIDE 9. PROVIDE SHOP DRAWINGS PRIOR TO PLACEMENT OF CONCRETE.
3. ALL WELDED WIRE FABRIC SHALL CONFORM TO THE STANDARDS
THE PROJECT LIMITS. ANY DAMAGE TO NEW OR EXISTING 2.6.2.3. SEISMIC DESIGN CATEGORY :B
OF ASTM A185.
CONSTRUCTION INSIDE OR OUTSIDE OF THE PROJECT LIMITS, 10. THE ARCHITECT HAS NOT BEEN RETAINED TO PROVIDE FIELD
4. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED, 2.6.2.4. RESPONSE MODIFICATION COEFFICIENT, R :5
SUPERVISION, NOR CONTROLLED INSPECTIONS AS PER NEW

UE
CAUSED BY CONSTRUCTION TECHNIQUES OR MOVEMENTS OF ENERGY CODE PROGRESS INSPECTION CODE/SECTION
FABRICATED, LABELED, SUPPORTED AND SPACED IN FORM AND YORK CITY BUILDING CODE.

EN
THE SOIL RETENTION SYSTEM IS THE RESPONSIBILITY OF THE 2.6.2.5. MAPPED SPECTRAL RESPONSE ACCELERATION,
SECURED IN PLACE IN ACCORDANCE WITH THE PROCEDURES

AV
CONTRACTOR. THE DESIGN OF THE SOIL RETENTION SYSTEM PROTECTION OF EXPOSED FOUNDATION INSULATION (IA1), (IIA1) 60 T
2.6.2.5.1. SS : 0.273

8 TH
AND REQUIREMENTS OUTLINED IN THE LATEST EDITION OF THE H
WILL BE PROVIDED BY THE OWNER. THE CONTRACTOR WILL "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", ST
INSULATION PLACEMENT AND R VALUES (IA2), (IIA2) 2.6.2.5.2. S1 : 0.0706 RE
ASSIST THE OWNER IN THE APPROVAL PROCESS FOR THE ACI 318-99 AND THE "MANUAL OF STANDARD PRACTICE FOR ET
RETENTION SYSTEM IF SO REQUIRED. THE CONTRACTOR DETAILING REINFORCED CONCRETE STRUCTURES", ACI 315. 2.6.2.6. SPECTRAL RESPONSE COEFFICIENT,
SHALL PROVIDE ALL CONTROLLED INSPECTIONS REQUIRED BY 5. CHECKED SHOP DRAWINGS SHOWING REINFORCING DETAILS, 2.6.2.6.1. Sds : 0.2877
THE CITY BUILDING CODE RELATING TO THE RETENTION INCLUDING STEEL SIZES, SPACING AND PLACEMENT, SHALL BE
SYSTEM. SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO NYCECC COMPLIANCE 2.6.2.6.2. Sd1 : 0.113 61 S
FABRICATION. T
2.6.2.7. BASE SHEAR (kips), ST
2. THE CONTRACTOR SHALL COORDINATE ALL ELEMENTS OF THE 6. THE CONTRACTOR SHALL SUBMIT DETAILED DRAWINGS TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, RE
SOIL RETENTION SYSTEM WITH ALL ELEMENTS OF THE 2.6.2.7.1. Vx : 145.077 ET
SHOWING THE LOCATIONS OF ALL CONSTRUCTION JOINTS, ALL WORK UNDER THIS APPLICATION IS IN COMPLIANCE WITH THE NYCECC.
PERMANENT BUILDING. CURBS, SLAB DEPRESSIONS, SLEEVES, OPENINGS, ETC. 2.6.2.7.2. Vy : 96.536
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
3. PRIOR TO ANY EXCAVATION OR INSTALLATION OF ELEMENTS 7. ALL REINFORCING SPLICES SHALL CONFORM TO THE THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
2.6.2.8. BASIC-SEISMIC-FORCE RESISTING SYSTEM
OF THE SOIL RETENTION SYSTEM, THE CONTRACTOR SHALL REQUIREMENTS OF ACI 318. BUT IN NO CASE SHALL IT BE LESS PROSECUTION.
THAN 40 DIAMETERS, UNLESS NOTED OTHERWISE. :ORDINARY STEEL CONCENTRICALLY BRACED FRAMES
ESTABLISH SURVEY POINTS AROUND THE PERIMETER OF THE
8. ALL WELDED WIRE FABRIC SHALL BE LAPPED TWO (2) FULL MESH 01
AREA TO BE EXCAVATED AND OTHER POINTS UP TO 200 FEET 2.6.2.9. ANALYSIS PROCEDURE USED
BEYOND THE PERIMETER. THESE POINTS SHALL BE SURVEYED
PANELS AND TIED SECURELY.
: EQUIVALENT LATERAL STATIC LATERAL FORCE METHOD
No. Revision Comment Date
FOR VERTICAL AND HORIZONTAL MOVEMENT AT FREQUENT 9. WHERE REQUIRED, DOWELS SHALL MATCH SIZE AND NUMBER OF 00 D.O.B. FILING SET 12/23/2020
INTERVALS DURING ACTUAL EXCAVATION AND CONTINUING MAIN REINFORCING, UNLESS OTHERWISE NOTED.
01 REVISED PLOT PLAN 01/18/2024
DURING EACH SUBSEQUENT PHASE OF THE WORK AND 10. ALL WALLS AND STRUCTURAL SLABS SHALL BE REINFORCED
REVISED STRUCTURAL DESIGN CRITERIA 01/18/2024
SUBMITTED TO THE ARCHITECT FOR INFORMATION. WITH AT LEAST #4 @12 INCHES EACH WAY AND EACH FACE,
UNLESS NOTED OTHERWISE. ALL SLAB SHALL BE REINFORCED ADDED SHEET FO-203 01/18/2024
4. ALL EXCAVATION SHALL BE BASED ON ENGINEERED DRAWINGS WITH AT LEAST ONE (1) LAYER OF #4 @12" O.C.E.W. IN MIDDLE.,
PREPARED BY THE CONTRACTOR INCLUDING PLANS AND UNLESS NOTED OTHERWISE.
SECTIONS OF EXCAVATION SEQUENCES. THE EXCAVATION 11. CONSTRUCTION JOINTS IN ALL CONTINUOUS FOOTINGS, WALLS,
SEQUENCES SHALL BE CONTROLLED TO MATCH THE SLABS AND BEAMS SHALL BE NO FURTHER APART THAN 60 FEET
REQUIREMENTS OF THE DESIGN OF THE SOIL RETENTION IN ANY DIRECTION.
SYSTEM AND TO PERMIT MONITORING OF WALL AND GROUND 12. ALL ADJOINING SURFACES NOT CAST MONOLITHICALLY SHALL BE
MOVEMENTS. ROUGHENED TO INCH AMPLITUDE FOR THE ENTIRE
INTERSECTION SURFACE ACCORDING TO ACI
5. THE GENERAL EXCAVATION ACROSS THE SITE SHALL NOT RECOMMENDATIONS AND SHALL BE COATED WITH BONDING
EXTEND DEEPER THAN THE SLAB-ON-GRADE SUBGRADE COMPOUND BEFORE PLACING CONCRETE.
ELEVATION. THE EXCAVATIONS FOR FOOTINGS, GRADE BEAMS, 13. NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE
PILE CAPS, MATS, PITS, SLABS, ETC. SHALL BE EXCAVATED ON WITHOUT THE ARCHITECT'S PRIOR REVIEW AND WRITTEN
AN INDIVIDUAL, LOCALIZED BASIS DOWN FROM THE APPROVAL.
SLAB-ON-GRADE SUBGRADE LEVEL. 14. BAR SUPPORTS IN CONTACT WITH EXPOSED SURFACES SHALL
BE PLASTIC TIPPED.
6. ALL EXCAVATION BELOW THE SLAB LEVEL REQUIRED FOR PITS
SHALL BE RETAINED BY LOCALIZED SOIL RETENTION SYSTEMS 15. PLACE SLAB IN ACCORDANCE WITH ACI 302, "GUIDE FOR
CONCRETE FLOOR AND SLAB CONSTRUCTION".
AS MAY BE NECESSARY BASED ON A DESIGN USING PROPOSED SIX (6) STORIES BUILDING
APPROPRIATED EARTH AND HYDRAULIC PRESSURES AND 16. CONCRETE AND REINFORCING MATERIALS TO CONFORM TO THE WITH CELLAR
FOLLOWING STANDARDS;
OTHER CONSTRUCTION LOADS.
a. PORTLAND CEMENT AS PER ASTM C 150.
7. THE CONTRACTOR SHALL PROVIDE POSITIVE PROTECTION 820 60TH STREET, BROOKLYN,
b. AIR ENTRAINING PORTLAND CEMENT AS PER ASTM C 175.

X
X
X
X
NY 11220;

X
X
X
(MAT/SHEET COVERINGS) FOR ALL EXCAVATION SLOPES TO

X
X
X
X
X
X
X
X
X
c. CONCRETE AGGREGATES AS PER ASTM C 33.

X
X
X
BLOCK: 5714; LOT: 14

X
X
PROTECT SLOPES FROM INSTABILITY AND DETERIORATION DUE

X
X
X
X
X
X
X
X
X
X
X
d. WATER SHALL BE CLEAN AND FREE OF ANY INJURIOUS

X
X
TO RAIN, WIND OR SNOW/ICE.
X
X
X
X
X
X
X
X
X
X
AMOUNTS OF OILS, ACIDS, ALKALIS, SALT, ORGANIC
X
X
X
X
X
X
X
X
X
X
X

8. THE CONTRACTOR SHALL PROVIDE SURFACE DRAINAGE MATERIALS AND DELETERIOUS SUBSTANCES. X
X
X
X
X
X
X
X
X
X
X
X
X
X

CHANNELS AND SUMPS AND SUMP PUMPS TO PROTECT ALL


X
X
X
X

17. SLUMP SHALL NOT EXCEED 5" PLUS OR MINUS 1" FOR STONE
X
X
X
X
X

PROPOSED 5 STORY
X
X
X
X
X

EXCAVATIONS FROM FLOODING. FLOODING OF ANY


X
X

AGGREGATE CONCRETE.
X
X
X
X
X
X
X

W/CELLAR
PROPOSED 6 STORY
X
X
X
X
X

EXCAVATION AFTER APPROVAL OF THE SUBGRADE WILL BE


X
X

W/CELLAR
X
X

18. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE


X
X
X
X
X
X
X

PROPOSED 1 STORY
X
X
X

CAUSE FOR COMPLETE RE-PREPARATION AND APPROVAL OF


X
X
X

PLACING CONCRETE. IF REQUIRED ADDITIONAL BARS OR W/CELLAR


X
X
X
X
X
X
X
X
X
X

THE SUBGRADE.
X
X

STIRRUPS SHALL BE PROVIDED BY THE CONTRACTOR TO


X
X
X
X
X
X
X
X
X
X
X
X

FURNISH SUPPORT TO ALL BARS.


X
X
X

GENERAL NOTES
X
X

PROPOSED 6 STORY
X
X

PROPOSED ELEVATOR
9. PROVIDE A DRAINAGE PANEL AGAINST THE OUTSIDE FACE OF
X
X
X
X
X

W/CELLAR, MECHANICAL
X

BULKHEAD & MACHINE


X
X
X

19. ALL BEAMS AND SLABS SHALL BE CAST MONOLITHICALLY UNLESS


X
X

ENCLOSURE AND STAIRWAY


X
X

ROOM
X

THE FOUNDATION WALL AT LOCATIONS INDICATED ON THE


X

PLOT PLAN
X
X
X
X
X
X

OTHERWISE NOTED.
X
X
X
X
X
X
X

ARCHITECTURAL DRAWINGS.
X
X
X
X
X
X
X
X
X
X

20. MINIMUM CONCRETE COVER FOR REINFORCEMENT SHALL BE 1"


X
X
X
X
X
X
X
X
X
X
X

10. THE OWNER'S SOIL TESTING LABORATORY SHALL REVIEW AND


X

FOR SLABS, 1" FOR WALLS AND 1" FOR BEAMS.


X
X
X
X
X

DOB NOW Job # B00464973-P1


X
X
X
X
X
X

01
X
X

MONITOR THE EXCAVATION, DEWATERING AND SOIL


X
X
X

21. CONTRACTOR SHALL SUBMIT CONCRETE DESIGN MIXES TO


X
X
X
X
X
X
X
X
X
X

RETENTION SYSTEMS. THE CONTRACTOR SHALL PROVIDE,


X
X

ENGINEER FOR REVIEW AND APPROVAL.


X
X

DATE: 12/23/2020
INSTALL AND SURVEY: (A) VERTICAL AND HORIZONTAL 22. ALL CONCRETE SHALL BE CONTROLLED CONCRETE AND SHALL PROJECT NO.: 20-5441
MOVEMENTS OF THE TOP OF THE SOIL RETENTION SYSTEM BE TESTED IN ACCORDANCE WITH CITY BUILDING CODE OF NEW YO
TE DESIGN BY: YT DWG BY: SG/DC
AND (B) BENCH MARKS ADJACENT TO AND AWAY FROM THE REQUIREMENTS. W

RK
M

ST
SITE PERIMETER
MOVEMENTS.
FOR VERTICAL AND HORIZONTAL 23. ALL REINFORCING BARS SHALL BE LAPPED AS INDICATED ON THE
RT
H PLOT PLAN CHK. BY:
DWG. NO.:
J.W.
DRAWINGS. UNLESS OTHERWISE NOTED, TERMINATE NO

EE R
SCALE: 1/16" = 1'-0"

LIC EN
CONTINUOUS BARS AT DISCONTINUOUS ENDS WITH STANDARD
11. SEE PLUMBING AND ELECTRICAL DRAWINGS FOR

GIN
UNDERGROUND UTILITY AND GROUNDING REQUIREMENTS.
HOOKS.
FO-001.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
1 OF 8
01

J
FO-202
D F
FO-201 FO-201 M
FO-203
E
FO-201
A C B C D D.9 E E.7 F F.2 F.7 F.9 G
FO-201
ADJACENT 1-STORY ADJACENT 2-STORY
ADJACENT #818 6-STORY BRICK BLDG. WITH CELLAR
PROPERTY LINE
17'-4" 16'-2" 18'-6" 13'-7" 9'-5" 3'-11" 1'-10" 6'-0" 4'-3" 2'-7" 4'-3"
1'-4"

100'-0"
2"
10"

10"
1 1

P2 P2 P2 P2 P2 P2
J.1

5'-0"
(A 0X1 (A 0X1 (A 0X1 (A 0X1 (A 0X1 (A 0X1 16
BO 6 BO 6 BO 6 BO 6 BO 6 BO 6 0X )
FO-202 P2 OVE
5'-9"

5'-9"
VE VE VE VE VE VE B
) ) ) ) ) ) (A

18 )
L
WF1 23'-7" 8X VE FO-203
W BO

3'-0"
2 (A 2

1'-0"
F1
ACCEPTED

3'-0"
W STEPPED 2.2
(A 8X18 FOOTING
BO
VE Date: 01/19/2024

3'-3"
9'-3"
6'-6"

6'-6"
)

5'-6"
B

2'-3"
2'-6" STEPPED 8 W
X1 VE)

11'-8"

11'-8"

BO 5
8 (A 10X

(A 10X4
FO-201

GB
FOOTING

)
VE
W BO

STREET
BO 4
(A VE 5
WF1

W
) 3'-0"
H

27'-0"
3'-0"

(80' WIDE)
I
27'-0"

W10X45

W10X45
3 3
16'-8"

16'-8"

16'-8"
5'-0" 2'-6" 2'-6"
25'-4"

25'-4"
FO-202
FO-202
GB

GB

NORTH
W
(AB 8X18
3'-0" OV

5'-5"
E)

TH
6'-5"

5'-9"
MAT1

UE
60
3.9

EN
6'-9"

AV
60 T

1'-0"

8 TH
5'-0"
H
4

W10X45

W10X45
4 45
ST
RE
11'-7" 16'-0" 11'-4" W W 1 0X E) ET
STEPPED (AB 10X4 (AB 10X4 W OV W
3'-0" WF1 OV 5 OV 5 (A
B W W (A 10X
BO 45
FOOTING E) E) (A 8X18 (AB 10X4

10'-0"
BO VE
VE OV 5 )
) E)
6'-8"

6'-8"
61 S
K 16
0X E)
16
0X E)
P
(A 20X
BO 16
P
(A 20X
BO 16
P
(A 20X
BO 16
P
(A 20X
BO 16
P
(A 20X
BO 16
T
ST
5'-0"

5'-0"

FO-203 P2 BOV P2 BOV VE VE VE VE VE RE


(A (A ) ) ) ) ) ET

5 5 THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE


10"

10"
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
2"

100'-0" PROSECUTION.

17'-4" 16'-2" 18'-6" 14'-10" 9'-5" 3'-11" 1'-10" 6'-0" 6'-10"


PROPERTY LINE
94'-11" 4'-3"
No. Revision Comment Date
2'-4" ADJACENT #824 2-STORY BRICK AND STUCCO BLDG. WITH CELLAR
A 00 D.O.B. FILING SET 12/23/2020
FO-201 01 CHANGED FOUNDATION LAY-OUT 01/18/2024
A B C D E E.7 F F.2 F.7 G R.C. PIER/DETAILS ADDED AND REV. 01/18/2024

NO
RT
H FOUNDATION PLAN G
SCALE: 1/4" = 1'-0" FO-201

WALL FOOTING SCHEDULE


REINFORCEMENT 2'-6"
TAG WIDTH LENGTH THICKNESS 01
LONG BAR SHORT BAR
WF1 5'-0" SEE PLAN 30" # 9 @ 6" T/B # 9 @ 6" T/B 12 - #9 TOP BAR
1'-4" PROPOSED SIX (6) STORIES BUILDING
1'-6" WITH CELLAR
1'-2"
#4 @ 6" O.C. 4 - #7 VERT. BAR
FOUNDATION WALL SCHEDULE 820 60TH STREET, BROOKLYN,
2'-6"

STIRRUPS 4 - #7 VERT. BAR


REINFORCEMENT 4-LEGS NY 11220;
TAG WALL THICKNESS FLOOR 4 - #7 VERT. BAR
1'-8"
BLOCK: 5714; LOT: 14

1'-6"
VERTICAL HORIZONTAL #4 @ 8" O.C.
#4 @ 8" O.C.

1'-2"
STIRRUPS #4 @ 8" O.C.
FW1 12" CONCRETE T.O. FTG. ~ 1ST FLR # 5 @ 10" O.C. E.F. # 5 @ 12" O.C. E.F. STIRRUPS
STIRRUPS
12 - #9 BOT. BAR

GB P20X16 P18X18 P14X14


MAT FOOTING SCHEDULE
REINFORCEMENT
TAG WIDTH LENGTH THICKNESS
TOP BAR BOTTOM BAR FOUNDATION PLAN
MAT1 SEE PLAN 30" # 9 @ 6" O.C. E.W. # 9 @ 6" O.C. E.W. R.C. GRADE BEAM DETAIL R.C. PIER DETAILS FOUNDATION SCHEDULE
MAT2 SEE PLAN 30" # 9 @ 6" O.C. E.W. # 9 @ 6" O.C. E.W. SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"
R.C. GRADE BEAM & R.C. PIER DETAIL
NOTES:
DOB NOW Job # B00464973-P1
1. SOIL BEARING CAPACITY: 3TONS/S.F.
2. SEE FOUNDATION PLAN FOR LOCATION DATE: 12/23/2020

3. MINIMUM BOTTOM OF FOOTING SHALL BE 4'-0" BELOW GRADE. PROJECT NO.: 20-5441
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
TE W

RK
M

ST
CHK. BY: J.W.
DWG. NO.:

EE R
LIC EN

GIN
FO-101.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
2 OF 8
01

J
FO-202
D F
FO-201 FO-201 M
FO-203

E
A C B C D FO-201 D.9 E E.7 F F.2 F.7 F.9 G
FO-201
PROPERTY LINE
ADJACENT 1-STORY ADJACENT 2-STORY
ADJACENT #818 6-STORY BRICK BLDG. WITH CELLAR
17'-4" 16'-2" 18'-6" 13'-7" 9'-5" 3'-11" 1'-10" 6'-0" 4'-3" 2'-7" 4'-3"
1'-4"

100'-0"
2"

4" 2"
10"

10"
1'-0"
1 1
FW1 FW1
J.1
P2

P2

P2

P2

P2

P2

6
FO-202

X1
5'-9"

5'-9"
0X

0X
0X

0X

0X

0X

0
P2
16

16
16

16

16

16
L
FO-203 ACCEPTED
2 2

1'-0"

1'-0"
Date: 01/19/2024
CELLAR T.O.S. W8 CELLAR T.O.S. 2.2
EL. 61.75' X1 EL. 61.75' W8
8 CELLAR T.O.S. X1
8
EL. 61.75'
6'-6"

6'-6"
B P

5'-6"
W BE 18X
P1 10
BE 4X1 X4 LO 18

45
FO-201 8 5 W 4"
LO 4
27'-0"

0X
X1

STREET
W
W8

W1
H

(80' WIDE)
2"
W8X18

NORTH
W10X45

W10X45
3 I 3
26'-8"

26'-8"
27'-0"
FW1

2"
W8X18

FO-202
25'-4"

25'-4"
FO-202

FW1
6" SLAB ON GRADE WITH W 14
8X 4X 18
6 X 6 - W2.9 X W2.9 W.W.M. 1 8 P1 LOW 1 8X OW
BE P EL

5'-5"

UE
TH
B
6'-5"

5'-9"
W1 W1 CELLAR T.O.S.

EN
1'-0"
0X 0X

AV
45 45 EL. 59.00' W 60 T

45
4'-0" 10'-10" 10'-1" 10

8 TH
H

0X

60
X4 3.9 ST
P14

W1
X 5 6'-9"
BEL 14 RE

W10X45

W10X45

W10X45

1'-0"
OW ET
4

W10X45

W10X45
4 45
0X
W8X18

W1

CROSS-BRACING

CROSS-BRACING
W

CROSS-BRACING

P1 LO
8X

P1 LO

P1 LO
HSS6X4X3/8

HSS6X4X3/8
HSS6X4X3/8
18

8X W
8X W

8X W

BE
BE

BE
4" 61 S

18
18

18
18 18 T
1 8X OW 1 8X OW ST
6'-8"

6'-8"
P EL P EL RE
B B
P2

P2

P2

P2
16

ET
K
0X

0X

0X

0X

0X
16 X1
6
P2

16

16

16

16
0X CELLAR T.O.S. 0
FO-203 P2 P2 1'-0"
EL. 59.00' THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
FW1 FW1 FW1 FW1 THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
5

1'-0"
5
10"

10"
2" 4"
2"

100'-0"
100'-0" No. Revision Comment Date
17'-4" 16'-2" 18'-6" 14'-10" 9'-5" 3'-11" 1'-10" 6'-0" 6'-10"
PROPERTY LINE ADJACENT #824 2-STORY BRICK AND STUCCO BLDG. WITH CELLAR 00 D.O.B. FILING SET 12/23/2020

2'-4" A 94'-11" 4'-3" 01 LAY-OUT CHANGED


DELETEDR.C.SHEARWALL
01/18/2024
01/18/2024
FO-201
ADDED R.C. PIERS & STEEL COLUMNS 01/18/2024
A B C D E E.7 F F.2 F.7 G ADDED COLUMN START AND END SYMBOL 01/18/2024

NO
RT
H CELLAR PLAN G
SCALE: 1/4" = 1'-0" FO-201

CELLAR NOTES:
1. TOP OF SLAB ELEVATION, SEE PLAN.
2. 6" SLAB ON GRADE WITH 6 X 6 - W2.9 X W2.9 W.W.M. (U.N.O.)
3. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.
4. REFER TO ARCHITECTURAL & M.E.P. DRAWINGS FOR SIZE AND
LOCATION OF SLAB OPENINGS (U.N.O).
5. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS, SEE
M.E.P. DRAWINGS FOR PENETRATION LOCATIONS AND SIZES.
6. COLUMN START PROPOSED SIX (6) STORIES BUILDING
01 WITH CELLAR
7. COLUMN END

820 60TH STREET, BROOKLYN,


NY 11220;
BLOCK: 5714; LOT: 14

CELLAR PLAN

DOB NOW Job # B00464973-P1


DATE: 12/23/2020
PROJECT NO.: 20-5441
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
TE W

RK
M

ST
CHK. BY: J.W.
DWG. NO.:

EE R
LIC EN

GIN
FO-102.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
3 OF 8
01

01

2"
1'-0"
EXISTING ADJACENT TWO STORY BRICK

12" R.C. FOUNDATION WALL 2" 2"


AND STUCCO BUILDING WITH CELLAR

6" SLAB ON GRADE WITH 1'-0" 1'-0" 1'-0"


#5 @ 10" VERTICAL REBAR 6 X 6 - W2.9 X W2.9 W.W.M.
CELLAR T.O.S. 12" R.C. FOUNDATION WALL
EXPANSION JOINT, SEE EL. 61.75' 12" R.C. FOUNDATION WALL 12" R.C. FOUNDATION WALL
ARCH'L. DWGS.
#5 @ 10" VERTICAL REBAR EXISTING ADJACENT EXISTING ADJACENT
X X X X X X X X X X X X

6"
BUILDING FDN. WALL BUILDING FDN. WALL

EXISTING TWO STORY


#5 @ 10" VERTICAL REBAR

ADJACENT BUILDING
#5 @ 10" VERTICAL REBAR

EXISTING ONE STORY


ADJACENT BUILDING
#5 @ 12" HORIZONTAL REBAR

#5 @ 12" HORIZONTAL REBAR VAPOR BARRIER, #5 @ 12" HORIZONTAL REBAR #5 @ 12" HORIZONTAL REBAR
EXISTING ADJACENT SEE ARCH'L DWGS. DOWEL, SIZE AND SPACING
BUILDING FDN. WALL TO MATCH VERT. BARS EXPANSION JOINT, SEE
6" COMPACTED
VAPOR BARRIER, CRUSHED STONE ARCH'L. DWGS.
DOWEL, SIZE AND SPACING
SEE ARCH'L. DOWEL, SIZE AND SPACING OR GRAVEL 6" SLAB ON GRADE WITH VAPOR BARRIER, VAPOR BARRIER,
TO MATCH VERT. BARS DOWEL, SIZE AND SPACING
DRAWINGS TO MATCH VERT. BARS 6 X 6 - W2.9 X W2.9 W.W.M. 01 SEE ARCH'L. DRAWINGS SEE ARCH'L. DRAWINGS
TO MATCH VERT. BARS
CELLAR T.O.S. 6" SLAB ON GRADE WITH
EL. 61.75' 6 X 6 - W2.9 X W2.9 W.W.M.

X X X X X X
EXPANSION JOINT, SEE CELLAR T.O.S. CELLAR T.O.S.

6"
12-#9 @ 6"
ARCH'L. DWGS. EL. 61.75' EL. 61.75'
TOP BARS
2'-6"

2'-6"
X X X X X X

6"
ACCEPTED

2'-6"
2'-6"
B.O.F. B.O.F. VAPOR BARRIER, ADJ. B.O.F. ADJ. B.O.F.
3"

3"
EL. 53.79' EL. 59.25' SEE ARCH'L DWGS. EL. 60.23' EL. 60.23'

1'-0"

1'-0"
6" COMPACTED Date: 01/19/2024
B.O.F. VAPOR BARRIER, B.O.F.

3"

3"
CRUSHED STONE
5'-0" SOIL BEARING 5'-0" EL. 59.25' SEE ARCH'L DWGS. EL. 59.25'
OR GRAVEL
BOTTOM OF FDN. TO MATCH CAPACITY: 3 T/S.F.
SOIL BEARING R.C. WALL FOOTING, SEE 6" COMPACTED
EXISTING ADJ. BLDG. FDN. R.C. WALL FOOTING, SEE CAPACITY: 3 T/S.F. FOUNDATION PLAN AND SCHEDULE CRUSHED STONE
1'-0" 1'-0"
FOUNDATION PLAN AND SCHEDULE OR GRAVEL #4 @ 6"
5'-0" 5'-0" 12-#9 @ 6" STIRRUPS
BOT. BARS (4-LEGS)
R.C. WALL FOOTING, SEE
A SECTION A B SECTION B SOIL BEARING R.C. WALL FOOTING, SEE SOIL BEARING

NORTH
FOUNDATION PLAN AND SCHEDULE CAPACITY: 3 T/S.F. FOUNDATION PLAN AND SCHEDULE CAPACITY: 3 T/S.F.
FO-201 SCALE: 1/2" = 1'-0" FO-201 SCALE: 1/2" = 1'-0"

C SECTION C D SECTION D

UE
EN
FO-201 SCALE: 1/2" = 1'-0" FO-201 SCALE: 1/2" = 1'-0"

AV
60 T

8 TH
H
ST
RE
ET

01

61 S
T
ST
RE
ET
HSS6X4X3/8
2" 2"
1'-0" X-BRACING, SEE S-301 1'-4" THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
2" THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
1'-0" PROSECUTION.

12" R.C. FOUNDATION WALL EXISTING ADJACENT 12" R.C. FOUNDATION WALL
EXISTING ADJACENT BUILDING FDN. WALL EXISTING ADJACENT
BUILDING FDN. WALL
No. Revision Comment Date
BUILDING FDN. WALL P20X16
EXISTING SIX STORY ADJACENT

EXISTING SIX STORY ADJACENT

00 D.O.B. FILING SET 12/23/2020


BRICK BUILDING WITH CELLAR

BRICK BUILDING WITH CELLAR

01 REVISED SECTIONS 01/18/2024


#5 @ 10" VERTICAL REBAR #5 @ 10" VERTICAL REBAR T.O. FLOOR AND FOOTING EL. REVISED 01/18/2024
W8X18 W8X18 W10X45
(4) - #7 VERT. REBAR

VAPOR BARRIER,
#5 @ 12" HORIZONTAL REBAR #5 @ 12" HORIZONTAL REBAR SEE ARCH'L. DRAWINGS

(4) - 34" Ø ANCHOR


BOLT ASTM F1554 (4) - 34" Ø ANCHOR
VAPOR BARRIER, DOWEL, SIZE AND SPACING VAPOR BARRIER, DOWEL, SIZE AND SPACING
EXPANSION JOINT, SEE BOLT ASTM F1554
SEE ARCH'L. DRAWINGS TO MATCH VERT. BARS SEE ARCH'L. DRAWINGS TO MATCH VERT. BARS EXPANSION JOINT, SEE
ARCH'L. DWGS. 6" SLAB ON GRADE WITH 6" SLAB ON GRADE WITH
ARCH'L. DWGS. 6 X 6 - W2.9 X W2.9 W.W.M.

EXISTING ADJACENT TWO STORY BRICK


6 X 6 - W2.9 X W2.9 W.W.M.

AND STUCCO BUILDING WITH CELLAR


6" SLAB ON GRADE WITH 1/4 1/4
6 X 6 - W2.9 X W2.9 W.W.M. TYP TYP 1/4 (4) - 34" Ø ANCHOR
TYP
BOLT ASTM F1554
CELLAR T.O.S. 12X12X1" CELLAR T.O.S. 12X12X1" 12X12X1" CELLAR T.O.S.
EL. 61.75' EL. 61.75' STEEL PLATE EXPANSION JOINT, SEE EL. 61.75'
STEEL PLATE STEEL PLATE
ARCH'L. DWGS.
X X X X X X X X X X X X X X X X X X X X X
X X X X X
6"

6"

6"

6"
PROPOSED SIX (6) STORIES BUILDING
2'-6"

2'-6"

2'-6"
ADJ. B.O.F. ADJ. B.O.F. WITH CELLAR
EL. 60.23' EL. 60.23' 3'-3" 1'-2" R.C. PIER, SEE 1'-6"
1'-0"

1'-0"

SCHEDULE 6" COMPACTED VAPOR BARRIER,


B.O.F. VAPOR BARRIER, B.O.F. & DETAILS 820 60TH STREET, BROOKLYN,
3"

CRUSHED STONE SEE ARCH'L DWGS.


EL. 59.25' SEE ARCH'L DWGS. EL. 59.25' VAPOR BARRIER, OR GRAVEL NY 11220;
6" COMPACTED SEE ARCH'L DWGS. BLOCK: 5714; LOT: 14
1'-0" CRUSHED STONE 1'-0" 6" COMPACTED

3'-0"
OR GRAVEL CRUSHED STONE R.C. PIER
5'-0" 5'-0" OR GRAVEL BEYOND
3'-0"

SOIL BEARING R.C. PIER, SEE


SOIL BEARING R.C. MAT1 FOOTING, SEE CAPACITY: 3 T/S.F. SCHEDULE
CAPACITY: 3 T/S.F. FOUNDATION PLAN AND SCHEDULE R.C. MAT1 FOOTING, SEE & DETAILS
FOUNDATION PLAN AND SCHEDULE

E SECTION E 3'-0"
FO-201 SCALE: 1/2" = 1'-0" FOUNDATION SECTIONS AND DETAILS - 1
2'-6"

2'-6"
F SECTION F B.O.F. B.O.F. DOB NOW Job # B00464973-P1
3"

3"
FO-201 SCALE: 1/2" = 1'-0" STEPPED FOOTING
EL. 53.79' EL. 53.79'
DATE: 12/23/2020
PROJECT NO.: 20-5441
3'-3" 3'-0" 10'-0" OF NEW YO DESIGN BY: YT DWG BY: SG/DC
TE W

RK
M

ST
R.C. WALL FOOTING, SEE R.C. WALL FOOTING, SEE BOTTOM OF FDN. TO MATCH CHK. BY: J.W.
6'-3"
FOUNDATION PLAN FOUNDATION PLAN EXISTING ADJ. BLDG. FDN. DWG. NO.:

EE R
AND SCHEDULE AND SCHEDULE

LIC EN

GIN
FO-201.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
4 OF 8
1'-0"

(4) - 34" Ø ANCHOR


2" 12" R.C. FOUNDATION
1'-0" 12" R.C. FOUNDATION WALL W8X18 BOLT ASTM F1554
WALL
EXPANSION JOINT, SEE
ARCH'L. DWGS.
EXISTING ADJACENT TWO STORY BRICK

#5 @ 10" VERTICAL
AND STUCCO BUILDING WITH CELLAR

#5 @ 10" VERTICAL REBAR 6" SLAB ON GRADE WITH TYP 1/4 6" SLAB ON GRADE WITH STEEL COLUMN BEYOND, REBAR
6 X 6 - W2.9 X W2.9 W.W.M. 6 X 6 - W2.9 X W2.9 W.W.M. SEE PLAN & SCHEDULE
CELLAR T.O.S. STEEL COLUMN BEYOND,
#5 @ 12" HORIZONTAL REBAR CELLAR T.O.S. 12X12X1" CELLAR T.O.S.
1'-0" EL. 61.75' STEEL PLATE SEE PLAN & SCHEDULE #5 @ 12" HORIZONTAL
EL. 61.75' EL. 61.75'
12" R.C. FOUNDATION WALL REBAR
X X X
X X X X X X X X X X X STEEL COLUMN BEYOND,

6"

6"

6"
SEE PLAN & SCHEDULE
EXPANSION JOINT, SEE
ARCH'L. DWGS. DOWEL, SIZE AND
EXPANSION JOINT, SEE SPACING TO MATCH

2'-9"
6" SLAB ON GRADE WITH ARCH'L. DWGS. 4'-2" VERTICAL BARS
6 X 6 - W2.9 X W2.9 W.W.M. 1'-2"
LOWER CELLAR VAPOR BARRIER, 1'-0" 5'-0" 1'-0" 4'-8" 1'-0" 6'-9" 1'-0" 2'-2"
VAPOR BARRIER, VAPOR BARRIER,
SEE ARCH'L DWGS. CELLAR T.O.S. CELLAR T.O. FTG. VAPOR BARRIER,
T.O.S. EL. 59.00' SEE ARCH'L DWGS. SEE ARCH'L DWGS.
6" COMPACTED EL. 61.75' EL. 61.75' STEPPED FOOTING SEE ARCH'L DWGS.
X X X X X X X X CRUSHED STONE 6" COMPACTED 6" COMPACTED BEYOND
EXISTING ADJACENT
OR GRAVEL CRUSHED STONE CRUSHED STONE X X X
BUILDING FDN. WALL X X X X X X

OR GRAVEL OR GRAVEL R.C. PIER


#5 @ 10" VERTICAL REBAR R.C. PIER BEYOND 12" R.C.
VAPOR BARRIER, 12" R.C. FDN. BEYOND FDN. WALL
SEE ARCH'L. DWGS. STEPPED WALL STEPPED FOOTING
VAPOR BARRIER, #5 @ 12" HORIZONTAL REBAR

2'-9"

2'-9"
FOOTING EXPANSION JOINT, #5 @ 10" VER. BEYOND
6" COMPACTED SEE ARCH'L DWGS.

3'-3"
ADJ. CELLAR FL. R.C. PIER, SEE
BEYOND SEE ARCH'L. DWGS. #5 @ 10" VERTICAL REBAR REBAR
EL. 56.29' CRUSHED STONE 2'-0" SCHEDULE #5 @ 10" VER. #5 @ 10" VERTICAL
CELLAR T.O.S. CELLAR T.O.S.
OR GRAVEL & DETAILS REBAR #5 @ 12" HORIZONTAL REBAR REBAR
EL. 59.00' EL. 59.00'

5'-0"
#5 @ 12" HOR. #5 @ 12" HORIZONTAL
REBAR X X X X X X X
#5 @ 12" HOR.
X X X

6"
REBAR
REBAR

2'-6"

2'-6"
R.C. PIER
BEYOND

1'-9"
VAPOR BARRIER,
T.O. PIT SEE ARCH'L DWGS.

2'-6"
EL. 56.75'
B.O.F. B.O.F.
3"

3"
6" COMPACTED
EL. 53.79' EL. 53.79' CRUSHED STONE
OR GRAVEL
B.O.F.

3"
10'-0" EL. 55.98'
3'-0" 3"

2'-6"
BOTTOM OF FDN. TO MATCH
SOIL BEARING ACCEPTED

1'-9"
EXISTING ADJ. BLDG. FDN. R.C. WALL FOOTING, SEE SOIL BEARING
FOUNDATION PLAN CAPACITY: 3 T/S.F. CAPACITY: 3 T/S.F. SOIL BEARING 1
AND SCHEDULE CAPACITY: 3 T/S.F. 1
B.O.F. Date: 01/19/2024

3"
EL. 54.25'
01 R.C. MAT2 FOOTING,
G SECTION G H SECTION H SEE FOUNDATION
PLAN AND SCHEDULE SOIL BEARING
FO-202 SCALE: 1/2" = 1'-0" CAPACITY: 3 T/S.F.
FO-202 SCALE: 1/2" = 1'-0"
7'-8" 1'-9" 14'-1"

NORTH
01

2"
2" I SECTION I
FO-202 SCALE: 1/2" = 1'-0"

UE
EN
AV
60 T

8 TH
H
ST
STEEL COLUMN BEYOND, RE
STEEL COLUMN BEYOND, ET
SEE PLAN & SCHEDULE
UPPER 1ST FLR. SEE PLAN & SCHEDULE
EXISTING ADJACENT 1'-0"
BUILDING FDN. WALL T.O.S. EL. 72.17'
X X X X X X X X X X X X X X X X X X
61 S
T
ST
RE
EXISTING ONE STORY
ADJACENT BUILDING

ET

STEEL COLUMN BEYOND, THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
STEEL BEAM BEHIND, SEE STEEL BEAM BEYOND, STEEL BEAM, SEE SEE PLAN & SCHEDULE 12" R.C. FDN. THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PLAN & SCHEDULE SEE PLAN & SCHEDULE STEEL COLUMN BEYOND, WALL PROSECUTION.
PLAN & SCHEDULE VAPOR BARRIER,
SEE PLAN & SCHEDULE
R.C. PIER STEEL BEAM BEYOND, #5 @ 10" VERTICAL REBAR SEE ARCH'L. DRAWINGS
BEYOND SEE PLAN & SCHEDULE 6" SLAB ON GRADE WITH STEEL COLUMN BEYOND, #5 @ 12" HORIZONTAL REBAR No. Revision Comment Date
6 X 6 - W2.9 X W2.9 W.W.M.

EXISTING ADJACENT TWO STORY BRICK


SEE PLAN & SCHEDULE

AND STUCCO BUILDING WITH CELLAR


EXPANSION JOINT, 00 D.O.B. FILING SET 12/23/2020
12" R.C. FOUNDATION WALL
SEE ARCH'L. DWGS. 01 REVISED AND ADDED SECTIONS 01/18/2024
GROUND LEVEL LOWER 1ST FLR. 1'-0" 1'-0" 5'-9" 1'-0" 5'-8"
GROUND LEVEL UPPER CELLAR T.O. FLOOR AND FOOTING EL. REVISED 01/18/2024
EL. ± 67.09' #5 @ 10" VERTICAL REBAR T.O.S. EL. 67.00'
W8X18 EL. ± 66.90' T.O.S. EL. 61.75' EL. 61.75'
X X X X X X X X X
X X X X X R.C. PIER

6"
STEEL COLUMN BEYOND, BEYOND
SEE PLAN & SCHEDULE 12" R.C. FDN. 12" R.C. FDN. R.C. PIER

EXISTING ADJACENT TWO STORY BRICK


#5 @ 12" HORIZONTAL REBAR

AND STUCCO BUILDING WITH CELLAR


WALL WALL BEYOND

2'-9"
VAPOR BARRIER, DOWEL, SIZE AND SPACING
DOWEL, SIZE AND SPACING STEEL BEAM BEYOND, 12" R.C. FDN. #5 @ 10" VERTICAL REBAR TO MATCH VERT. BARS
SEE ARCH'L. DRAWINGS STEEL BEAM, SEE SEE PLAN & SCHEDULE WALL LOWER CELLAR
TO MATCH VERT. BARS
3
(4) - Ø ANCHOR PLAN & SCHEDULE #5 @ 10" VERTICAL REBAR T.O.S. EL. 59.00'
4"

5'-0"

5'-0"
BOLT ASTM F1554 #5 @ 10" VERTICAL REBAR
TYP 1/4 #5 @ 12" HORIZONTAL REBAR X X X X X X X X

6" SLAB ON GRADE WITH

6"
#5 @ 12" HORIZONTAL REBAR R.C. PIER
12X12X1" 6 X 6 - W2.9 X W2.9 W.W.M. BEYOND #5 @ 12" HORIZONTAL REBAR
STEEL PLATE EXPANSION JOINT,

2'-3"
SUMP PIT

2'-9"
5'-0" 1'-0" 3'-0" SEE ARCH'L. DWGS. 1'-0" VAPOR BARRIER,
1'-0" 5'-9" 1'-0" 5'-8" T.O. PIT
UPPER CELLAR UPPER CELLAR SEE ARCH'L DWGS.
2'-0" EL. 56.75'
T.O.S. EL. 61.75' T.O.S. EL. 61.75' EL. 61.75' EL. 61.75' 6" COMPACTED CRUSHED
R.C. PIER
X X X X BEYOND STONE OR GRAVEL
6"

12" R.C. FDN. R.C. PIER


PROPOSED SIX (6) STORIES BUILDING

2'-0"
WALL BEYOND STEPPED

2'-6"
WITH CELLAR
2'-6"

2'-6"

R.C. PIER DOWEL, SIZE AND SPACING FOOTING


2'-9"

ADJ. B.O.F.

2'-6"
BEYOND TO MATCH VERT. BARS BEYOND
EL. 60.23' #5 @ 10" VERTICAL REBAR
2'-3" 1'-0" 820 60TH STREET, BROOKLYN,
1'-0"

LOWER CELLAR

4'-6"
VAPOR BARRIER, B.O.F.
B.O.F. T.O.S. EL. 59.00' NY 11220;
3"

5'-0"

SEE ARCH'L. DRAWINGS EL. 54.25'

6"
EL. 59.25' BLOCK: 5714; LOT: 14

3"
X X X X X X X X
6"

2'-0"
1'-0" 5'-6" #5 @ 12" HORIZONTAL REBAR BOTTOM OF
1
2'-6"

2'-6"

FOOTING BEYOND
2'-3"

2'-9"

6'-6" VAPOR BARRIER, 1 SOIL BEARING BOTTOM OF FDN. TO MATCH


T.O. PIT B.O.F.

3"
SEE ARCH'L DWGS. CAPACITY: 3 T/S.F. EXISTING ADJ. BLDG. FDN.
EL. 56.75' EL. 52.25'
6" COMPACTED CRUSHED 1'-10" 6'-8"
STONE OR GRAVEL
6"

5'-0" 2'-0"
2'-6" R.C. MAT2 FOOTING,
SEE FOUNDATION PLAN FOUNDATION SECTIONS AND DETAILS - 2
2'-6"

2'-6"

AND SCHEDULE
2'-6"

STEPPED FOOTING

J.1 SECTION J.1 (DETAIL AT SUMP PIT) 01 DOB NOW Job # B00464973-P1
3"

J SECTION J
6"

B.O.F.
3"

FO-202 SCALE: 1/2" = 1'-0" DATE: 12/23/2020


FO-202 SCALE: 1/2" = 1'-0" EL. 53.79'
PROJECT NO.: 20-5441
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
11'-1" 6'-8" TE W

RK
M

ST
CHK. BY: J.W.
R.C. MAT2 FOOTING,
SEE FOUNDATION PLAN SOIL BEARING BOTTOM OF FDN. TO MATCH DWG. NO.:

EE R
LIC EN
AND SCHEDULE CAPACITY: 3 T/S.F. EXISTING ADJ. BLDG. FDN.

GIN
FO-202.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
5 OF 8
1'-0"

12" R.C. FOUNDATION WALL 1'-0"

12" R.C. FDN. WALL


PIER BEHIND
#5 @ 10" VERTICAL REBAR
#5 @ 10" VER. REBAR
PIER BEHIND

#5 @ 12" HORIZONTAL REBAR


#5 @ 12" HOR. REBAR

DOWEL, SIZE AND


PIER BEHIND TOP OF ADJACENT SPACING TO MATCH
6" SLAB ON GRADE WITH EXPANSION JOINT, SEE WALL FOOTING BEYOND VERTICAL BARS
6 X 6 - W2.9 X W2.9 W.W.M. ARCH'L. DWGS.
DOWEL, SIZE AND SPACING EXPANSION JOINT, SEE 6" SLAB ON GRADE WITH
TO MATCH VERT. BARS 6 X 6 - W2.9 X W2.9 W.W.M. 6" SLAB ON GRADE WITH EXPANSION JOINT,
ARCH'L. DWGS.
6 X 6 - W2.9 X W2.9 W.W.M. SEE ARCH'L. DWGS.
CELLAR T.O.S. CELLAR T.O.S.
EL. 61.75' EL. 61.75' CELLAR T.O.S.
EL. 61.75'
X X X X X X X X

6"

6"
X X X X X X X X X

6"
2'-6"

2'-6"

2'-6"
3'-0" VAPOR BARRIER,
VAPOR BARRIER,
B.O.F.
SEE ARCH'L DWGS.
SEE ARCH'L DWGS. ACCEPTED
3"

3"
B.O.F.

5'-6"

3"
EL. 59.25' 6" COMPACTED
CRUSHED STONE 6" COMPACTED EL. 59.25'
OR GRAVEL CRUSHED STONE R.C. WALL Date: 01/19/2024
GB30X30 OR GRAVEL FOOTING BEYOND
10'-7"

3'-0"
5'-0"
R.C. WALL FOOTING,

3'-0"
R.C. WALL FOOTING, SEE SOIL BEARING SOIL BEARING
FOUNDATION PLAN AND SCHEDULE SEE FOUNDATION CAPACITY: 3 T/S.F.
CAPACITY: 3 T/S.F.
PLAN & SCHEDULE

L SECTION L

NORTH
3'-0" FO-203 SCALE: 1/2" = 1'-0"

2'-6"

2'-6"

UE
STEPPED FOOTING

EN
B.O.F.

3"

AV
60 T
EL. 53.79'

8 TH
H

K SECTION K ST
RE
ET
FO-203 SCALE: 1/2" = 1'-0"

R.C. WALL FOOTING, SEE SOIL BEARING


FOUNDATION PLAN AND SCHEDULE CAPACITY: 3 T/S.F.
61 S
T
ST
RE
ET

THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE


THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.

No. Revision Comment Date


00 D.O.B. FILING SET 12/23/2020
VAPOR BARRIER, NEW SHEET 01/18/2024
SEE ARCH'L. DRAWINGS

R.C. PIER
EXISTING ONE STORY
ADJACENT BUILDING

BEYOND
12" R.C. FDN.

EXISTING ADJACENT TWO STORY BRICK


AND STUCCO BUILDING WITH CELLAR
12" R.C. FOUNDATION WALL STEEL COLUMN WALL
BEHIND
#5 @ 10" VERTICAL REBAR #5 @ 10" VERTICAL REBAR
ADJ. CELLAR FL. STEEL COLUMN
6" SLAB ON GRADE WITH EXPANSION JOINT,
EL. 62.73' BEHIND
#5 @ 12" HORIZONTAL REBAR 6 X 6 - W2.9 X W2.9 W.W.M. SEE ARCH'L. DWGS.
1'-0" #5 @ 12" HORIZONTAL REBAR
DOWEL, SIZE AND SPACING UPPER CELLAR UPPER CELLAR
TO MATCH VERT. BARS T.O.S. EL. 61.75' T.O.S. EL. 61.75' EL. 61.75'
X X X X R.C. PIER
6"

BEHIND
12" R.C. FDN. R.C. PIER
WALL BEHIND
2'-6"

2'-6"

DOWEL, SIZE AND SPACING


2'-9"

ADJ. B.O.F.
R.C. PIER TO MATCH VERT. BARS
EL. 60.23'
BEHIND
1'-0"

#5 @ 10" VER. LOWER CELLAR 6" SLAB ON GRADE WITH


2'-3" 1'-0" REBAR VAPOR BARRIER,
B.O.F. T.O.S. EL. 59.00' 6 X 6 - W2.9 X W2.9 W.W.M. PROPOSED SIX (6) STORIES BUILDING
3"

SEE ARCH'L. DRAWINGS


EL. 59.25' X X X X X X X X X X X X X X X X X X WITH CELLAR

6"
1'-0" 5'-6"
820 60TH STREET, BROOKLYN,
2'-6"

2'-6"

2'-3"

NY 11220;

2'-9"
6'-6" VAPOR BARRIER,
#5 @ 12" HOR. EL. 56.75'
SEE ARCH'L DWGS. BLOCK: 5714; LOT: 14
REBAR 6" COMPACTED CRUSHED ADJ. CELLAR FL.
STONE OR GRAVEL EL. 56.29'
6"

2'-6"
2'-6"

2'-6"

2'-6"

STEPPED FOOTING

B.O.F.
3"

M SECTION M EL. 54.25' FOUNDATION SECTIONS AND DETAILS - 3


6"

B.O.F.
3"

FO-203 SCALE: 1/2" = 1'-0" EL. 53.79'


SOIL BEARING
CAPACITY: 3 T/S.F.
11'-6" 6'-2" DOB NOW Job # B00464973-P1
R.C. MAT2 FOOTING,
SEE FOUNDATION PLAN BOTTOM OF FDN. TO MATCH DATE: 12/23/2020
AND SCHEDULE EXISTING ADJ. BLDG. FDN.
PROJECT NO.: 20-5441
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
TE W

RK
M

ST
CHK. BY: J.W.
DWG. NO.:

EE R
LIC EN

GIN
FO-203.00

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
6 OF 8
CL WALL

WATER PROOFING
#4 @ 12" x 3'-0" IN ADDITION
1" 2" 1" TO NORMAL WALL REINF.
W1.7 TRUSS WALL
STD. STEEL PIPE REINF. @ 16" O.C.
3/8" STEEL PLATE SLEEVE AS REQ'D.
8" CMU TENSION LAP
#5 @ 12" T & B x 5'-0" (IN ADDITION STANDARD STANDARD
TO NORMAL SLAB REINF.) CUT-BACK TO #4 DOWELS @ 48" O.C. SPLICE HOOK HOOK
RECEIVE
#4 @ 48" O.C. ON
GROUTED CELL

4"

OPENING SIZE
2" PLACE DOWELS NEAR OUTSIDE ROUGHEN CONC. & COAT
2 - #5 CONT. FACE OF WALL WHERE THERE IS WITH CEMENT BEFORE
#3 @ 24" O.C. NO HORIZ. REINF.

6"
NEW CONC.
6" CONC. SLAB ON GRADE

6" POROUS FILL

LAP SPLICE
NOTE:

TENSION
SUB-CELLAR FLR.

LAP SPLICE
W/ 6x6-W2.9xW2.9 WWM

TENSION
1. KEY WIDTH NOT TO EXCEED 1/3 DEPTH OF WALL OR STANDARD HOOK
SEE MECH'L. DWGS. SEALER 1 1/2" X X X X X X X X X X
BEAM. VERTICAL CONSTRUCTION JOINT PERMITTED
DEEP

SEE MECH'L.
#4 @ 12 (T) E.W. CONT. VAPOR BARRIER IN WALL OR GRADE.
CONT. WELD TAMPED LEAD 2. BEAM AT ANY POINT 4'-0" MIN. AWAY FROM FACE OF

DWGS
1 1/2" DEEP
T/SLAB 95% COMPACTED FILL SUPPORTING SUPPORTING PIER, BUTTRESS
OAKUM PACKED 1
AND/OR WALL OPENING.
1
3. PROVIDE ONE VERTICAL CONSTRUCTION JOINT FOR CORNER WALL CROSS WALL
CONTRACTOR TO SUPPLY LOCATION OF JTS. WATER PROOFING
1'-0" EVERY 40'-0" OF A STRAIGHT RUN OF WALL.
#4 @ 24 E.W. TO ARCH. & ENGINEER BEFORE POURING

DETAIL OF WATER PROOFED SLEEVE TYP. DET. FOR CMU PARTITIONS TYP. VERT. CONSTRUCTION TYPICAL DETAIL HORIZONTAL REINFORCEMENT AT
TYPICAL HOUSEKEEPING CONSTRUCTION JT. DET. AT CORNERS AND JUNCTIONS OF WALLS AND BEAMS
THRU WALL WITH WATER PROOFING SCALE: N.T.S.
ON SLAB ON GRADE SCALE: N.T.S.
JOINT IN WALL
SCALE: N.T.S.
PAD DETAIL SCALE: N.T.S.
SLAB ON GRADE SCALE: N.T.S.
SCALE: N.T.S.

01

STIRRUPS AND TIE HOOKS


12d for No.6, 7, 8 Detailing Dimension
(19, 22, 25)

6d
(7

,3
5
6d for No. 3, 4, 5 (10, 13, 16)

A or G

in
m
Hook

.
A or G

m
Hook

)m
D

in
.

A or G

12d
D D
ACCEPTED

H
D

H
90°

Detailing Dimension

Detailing Dimension
Date: 01/19/2024
A or G HOOK

Dimension
Detailing Dimension

6d

Detailing
A or G

d
d d
D

J
d
D D 180°
90° 135°
4d or

NORTH
135° 2 1/2" in. (60 mm) min.

Beam Beam
Bar size, D,* 180 degree hook 90 degree hook

UE
STIRRUP (TIES SIMILAR) No. in (mm) A or G, ft-in. (mm) J, ft-in. (mm) A or G, ft-in. (mm)

EN
135 DEGREE SEISMIC STIRRUP/TIE 2 1/4 (60)
STIRRUP AND TIE HOOK DIMENSIONS 3 (10) 5 (125) 3 (80) 6 (155)

AV
HOOK DIMENSIONS 60 T

8 TH
ALL GRADES 4 (13) 3 (80) 6 (155) 4 (105) 8 (200) H
ALL GRADES ST
5 (16) 3 3/4 (95) 7 (180) 5 (130) 10 (250) RE
Bar size, D,* 90 degree hook 135 degree hook Bar size, D,* 135 degree hook 6 (19) 4 1/2 (115) 8 (205) 6 (155) 1-0 (300)
ET
No. in (mm) Hook A or G, ft-in. (mm) Hook A or G, ft-in. (mm) H approx., ft-in. (mm) No. in (mm) Hook A or G, ft-in. (mm) H approx., ft-in. (mm)
7 (22) 5 1/4 (135) 10 (250) 7 (175) 1-2 (375)
3 (10) 1 1/2 (40) 4 (105) 4 (105) 2 1/2 (65) 3 (10) 1 1/2 (40) 4 1/4 (110) 3 (80) 8 (25) 6 (155) 11 (275) 8 (205) 1-4 (425)
4 (13) 2 (50) 4 1/2 (115) 4 1/2 (115) 3 (80) 4 (13) 2 (50) 4 1/2 (115) 3 (80) 9 (29) 9 1/2 (240) 1-3 (375) 11 3/4 (300) 1-7 (475)
5 (16) 2 1/2 (65) 6 (155) 3 3/4 (95) 5 (16) 2 1/2 (65) 5 1/2 (140) 3 3/4 (95) 61 S
5 1/2 (140) 10 (32) 10 3/4 (275) 1-5 (425) 1-1 1/4 (335) 1-10 (550) T
6 (19) 6 (19) 4 1/2 (115) 8 (205) 4 1/2 (115) ST
4 1/2 (115) 1-0 (305) 8 (205) 4 1/2 (115) 11 (36) 12 (305) 1-7 (475) 1-2 3/4 (375) 2-0 (600) RE
7 (22) 5 1/4 (135) 1-2 (355) 9 (230) 5 1/4 (135) 7 (23) 5 1/4 (135) 9 (230) 5 1/4 (135) ET
14 (43) 18 1/4 (465) 2-3 (675) 1-9 3/4 (550) 2-7 (775)
8 (25) 6 (155) 1-4 (410) 10 1/2 (270) 6 (155) 8 (25) 6 (155) 10 1/2 (270) 6 (155) 18 (57) 24 (610) 3-0 (925) 2-4 1/2 (725) 3-5 (1050)
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
*Finished bend diameters include "spring *Finished bend diameters include "spring back" THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
Table 1 - Standard Hooks: All specific sizes PROSECUTION.
back" effect when bars straighten out slightly effect when bars straighten out slightly after being
recommended meet minimum requirements
after being bent and are slightly larger than bent and are slightly larger than minimum bend
of ACI 318
minimum bend diameters in 3.7.2. diameters in 3.7.2.
No. Revision Comment Date
00 D.O.B. FILING SET 12/23/2020
01 DELETED TYP. R.C. COL. DETAILS 01/18/2024

DEFORMED BAR TENSION DEVELOPMENT LENGTH l d DEFORMED BAR COMPRESSION DEFORMED BAR COMPRESSION LAP SPLICE DEFORMED BAR TENSION LAP SPLICES - CLASS B
DEVELOPMENT LENGTH l d
FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS
FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS

BAR 3,000 PSI CONC. 4,000 PSI CONC. 5,000 PSI CONC. 6,000 PSI CONC. BAR 3,000 PSI 4,000 PSI 5,000 PSI 6,000 PSI BAR 3,000 PSI 4,000 PSI 5,000 PSI 6,000 PSI BAR 3,000 PSI CONC. 4,000 PSI CONC. 5,000 PSI CONC. 6,000 PSI CONC.
SIZE CASE I CASE II CASE I CASE II CASE I CASE II CASE I CASE II SIZE CONCRETE CONCRETE CONCRETE CONCRETE SIZE CONCRETE CONCRETE CONCRETE CONCRETE SIZE CASE I CASE II CASE I CASE II CASE I CASE II CASE I CASE II
#3 17" 25" 15" 22" 13" 20" 12" 18" #3 9" 8" 8" 8" #3 12" 12" 12" 12" #3 22" 33" 19" 28" 17" 25" 16" 23"

#4 22" 33" 19" 29" 17" 26" 16" 24" #4 11" 10" 9" 9" #4 15" 15" 15" 15" #4 29" 43" 25" 37" 23" 34" 21" 31"

#5 28" 42" 24" 36" 22" 32" 20" 30" #5 14" 12" 12" 12" #5 19" 19" 19" 19" #5 36" 54" 31" 47" 28" 42" 26" 38"
PROPOSED SIX (6) STORIES BUILDING
#6 33" 50" 29" 43" 26" 39" 24" 35" #6 17" 15" 14" 14" #6 23" 23" 23" 23" #6 43" 65" 37" 56" 34" 50" 31" 46" WITH CELLAR
#7 48" 72" 42" 63" 38" 56" 34" 51" #7 20" 17" 16" 16" #7 27" 27" 27" 27" #7 63" 94" 54" 81" 49" 73" 45" 67"
820 60TH STREET, BROOKLYN,
#8 55" 83" 48" 72" 43" 64" 39" 59" #8 22" 19" 18" 18" #8 30" 30" 30" 30" #8 72" 107" 62" 93" 56" 83" 51" 76"
NY 11220;
#9 62" 93" 54" 81" 48" 72" 44" 66" #9 35" 22" 21" 21" #9 34" 34" 34" 34" #9 81" 121" 70" 105" 63" 94" 57" 86" BLOCK: 5714; LOT: 14
#10 70" 105" 61" 91" 54" 81" 50" 74" #10 28" 25" 23" 23" #10 39" 39" 39" 39" #10 91" 136" 79" 118" 71" 106" 64" 96"

#11 78" 116" 67" 101" 60" 90" 55" 82" #11 31" 27" 26" 26" #11 43" 43" 43" 43" #11 101" 151" 87" 131" 78" 117" 71" 107"

NOTES:
1. FOR HORIZONTAL REINFORCEMENT WITH MORE THAN 12 IN OF FRESH
CONCRETE CAST BELOW IT, l d SHALL BE 1.3 x THE VALUES GIVEN ABOVE.
TYPICAL FOUNDATION DETAILS
2. FOR EPOXY-COATED BARS WITH CONCRETE COVER LESS THAN 3db OR
CLEAR SPACING LESS THAN 6db, l d SHALL BE 1.5 x THE VALUES GIVEN ABOVE.
FOR ALL OTHER EPOXY-COATED BARS, l d SHALL BE 1.2 x THE VALUES GIVEN
ABOVE. DOB NOW Job # B00464973-P1
DATE: 12/23/2020
CASE I: CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS
PROJECT NO.: 20-5441
THAN db, AND STIRRUPS OR TIES THROUGHOUT l d NOT LESS THAN
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
THE CODE MINIMUM OR CLEAR SPACING OF BARS BEING DEVELOPED TE W

RK
OR SPLICED NOT LESS THAN 2db AND CLEAR COVER NOT LESS THAN db. M

ST
CHK. BY: J.W.
CASE II: OTHER CASES. DWG. NO.:

EE R
LIC EN

GIN
FO-301.01

SE

EN
D
PR L
O F E S IONA
S CADD FILE NO.:
7 OF 8
LMW Engineering Group, LLC.

NORTH

UE
EN
AV
60 T

8 TH
H
ST
RE
ET

61 S
T
ST
RE
ET

THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE


THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.

No. Revision Comment Date


00 D.O.B. FILING SET 12/23/2020

PROPOSED SIX (6) STORIES BUILDING


WITH CELLAR

820 60TH STREET, BROOKLYN,


NY 11220;
BLOCK: 5714; LOT: 14

BORING PLAN
BORING LOGS

DOB NOW Job # B00464973-I1


DATE: 12/23/2020
PROJECT NO.: 20-5441
OF NEW YO DESIGN BY: YT DWG BY: SG/DC
TE W

RK
M

ST
CHK. BY: J.W.
DWG. NO.:

EE R
LIC EN
ACCEPTED

GIN
FO-401.00

SE
Date: 04/11/2021

EN
D
PR L
OF E S I
S ONA CADD FILE NO.:
7 OF 7