Professional Documents
Culture Documents
1621594441566-Question Bank
1621594441566-Question Bank
1621594441566-Question Bank
(a) Three month (b) One month (c) Six month (d) Eight month
(a) 15 days (b) 25 days (c) one month (d) two month
6. What is the period for the POH of any OCV attached to a passenger train?
7. What shall be the period for POH for a coach attached to Mail/ Express train?
8. What shall be the period for POH of PCV attached with any other train other than mail/ Express train? (a)
9 month (b) 12 month (c) 18 month (d) 24 month
12. As per policy circular No-4 secondary examination of mail/express has been skipped on round trip upto-
14. The ‘L’ type composite brake block should be changed, if worn out beyond-
15. The ‘K’ type composite brake block should be changed, if worn out beyond-
(a) 13, 14, 26 mm (b) 13, 22, 28 mm (c) 13,26,38,48 mm (d) 22, 26, 32 mm
(a) Ant telescopic (b) Dual brake (c) In built air brake (d) Non-Anti tele
(a) Internal crack (b) external crack (c) Air flow crack (d) None of the above
20 What is Codal life of steel bodied coaches (Including dining / pantry cars) –
(a) One month (b) six month (c) one year (d) two year
(a) 15% of the total cost (b) 20% of the total cost
(c) 25% of the total cost (d) 35% of the total cost
(a) For testing roller bearing (b) For down hand welding
(a) 9 months (b) 12 months (c) 6 months (d) None of the above
36 The maximum standard buffer height above rail level to center of buffer is
37 The minimum permissible buffer height above rail level to center of buffer is
(a) Mild steel (b) Cost iron (c) Cast steel (d)Aluminum Alloy
(a) 1090 mm (b) 1105 mm (c) 1030 mm (d) None of the above
(a) Centre pivot (b) Bogie (c) Side bearer (d) Wheel
48 What thickness of hard packing ring used for 889 to 864 mm diameter of two wheel sets of bogie in
adjustment of buffer height?
49 What thickness of hard packing ring used for 863 to 840 mm diameter of two wheel sets of bogie in
adjustment of buffer height?
50 Thickness of hard packing ring used for 839 to 820 mm diameter of two wheel sets of bogie in adjustment
of buffer height is –
51 Thickness of hard packing ring used for 819mm diameter of two wheel sets of bogie in adjustment of
buffer height is –
54 What is the weakest link of the ‘H’ type tight lock center buffer coupler?
(a) Draft gear (b) Knuckle (c) Lock (d) Yoke pin
(a) Buffer (c) Head stock (c) under sole bar (d) none Air Brake
Answer Key
1. C 2. C 3. A 4. B 5. C 6. C 7. C
8. C 9. B 10. A 11. D 12. C 13. C 14. A
15. B 16. C 17. B 18. A 19. A 20. C 21. A
22. C 23. A 24. C 25. B 26. B 27. C 28. C
29. A 30. C 31. B 32. B 33. B 34. A 35. A
36. C 37. D 38. B 39. D 40. B 41. C 42. A
43. C 44. C 45. C 46. A 47. C 48. C 49. D
50. C 51. D 52. C 53. D 54. B 55. A
AIR BRAKE
(a) 150 Lit. (b) 200 Lit (c) 250 Lit. (d) 300 Lit.
05 In the passenger train, the diameter of brake pipe & feed pipe is –
(a) 2.0 Kg/cm2 (b) 1.0 Kg/cm2 (c) 3.0 Kg/cm2 (d) 1.5 Kg/cm2
09 At originating station the brake power percentage for mail/express train should be –
11 What is the piston stroke of air brake coaching train fitted with modified horizontal lever?
14 The rate of air leakage in single car testing should not be more then –
15 In emergency application the brake cylinder pressure rises from 0-3.6 kg/cm2 in –
(a) 15-20 secs (b) 5-10 sec (c) 3-5 secs (d) 8-10 secs
17 When brake is manually released by QRV, which pressure will be vent out?
(a) 6.0 Kg/cm2 (b) 5.0 Kg/cm2 (c) 6.0 to .2 Kg/cm2 (d) 4.8 Kg/cm2
(a) 5.0 Kg/cm2 (b) 6.0 Kg/cm2 (c) 4.8 Kg/cm2 (d) 5.5 Kg/cm2
(a) 1.0 to 05 Kg/cm2 (b) 1.0 to 1.5 Kg/cm2 (c) 0.5 to 0.8 Kg/cm2 (d) 0.8 to 1.0 Kg/cm2
(a) 1.0 to 1.5 Kg/cm2 (b) 0.8 to 1.0 Kg/cm2 (c) 0.5 to 0.8 Kg/cm2 (d) 0.1 to 05 Kg/cm2
(a) 1.0 to 1.5 Kg/cm2 (b) 1.5 to 3.8 Kg/cm2 (c) 0.5 to 0.8 Kg/cm2 (d) 3.8 to 5..0 Kg/cm2
24 How many dirt collectors are fitted with under frame mounted air brake system on every coach?
(a) Two (b) One (c) Three (d) None of the above
27 For testing C3W DV, the AR charging time from 0 to 4.8 kg/cm2 is –
(a) 170 ± 10 sec (b) 175 ± 30 sec (c) 280 ± 30 sec (d) 210 ± 20 sec
28 For testing KE type DV, the AR charging time from 0 to 4.8 kg/cm2 is-
(a) 160 to 210 sec (b) 210 to 260 sec (c) 260 to 280 sec (d) 180 to 200 sec
29 For testing C3W DV, the CR charging time from 0 to 4.8 kg/cm2 is –
(a) 170 ± 10 sec (b) 165 ± 20 sec (c) 160 ± 10 sec (d) 210 ± 20 sec
30 For testing KE type DV, the CR charging time from 0 to 4.8 kg/cm2 is –
(a) 170 ± 10 sec (b) 160 ± 40 sec (c) 160 ± 10 sec (d) 210 ± 20 sec
31 The three-branch pipe attached to common pipe bracket, where the middle pipe leads to
33 At what schedule, testing of pressure gauge and replacement of the defective gauge in SLR?
(a) IOH (b) ‘A’ schedule (c) ‘B’ Schedule (d) Special schedule
(a) 6.0 litre (b) 7.0 litre (c) 9.0 litre (d) 10.0 litre
38 What should be the effective maximum pressure in brake cylinder during full service application is
(a) 3.6 ± 0.1 Kg/cm2 (b) 3.7 ± 0.1 Kg/cm2 (c) 3.8 ± 0.1 Kg/cm2 (d) 4.1 ± 0.1Kg/cm2
39 DV is directly mounted on –
(a) AR (b) Brake cylinder (c) Brake pipe (d) Common pipe bracket
(a) Main valve (b) Quick service valve (c) Cut off valve (d) Limiting device
44 In air brake system, brake should apply when the rate of drop of air pressure in BP is –
(a) 0.6 Kg/cm2 /min in six sec (b) 0.3 Kg/cm2 in one sec
(c) 0.4 Kg/cm2 in one sec (d) 0.1 Kg/cm2 in one sec
45 In air brake system, brake should not apply when the rate of drop of air pressure in BP is
(c) Control reservoir auxiliary reservoir (d) Auxiliary reservoir and brake cylinder
48 The vent hole is provided in the cut off angle cock to (when angle cock is closed)
(a) Exhaust air pressure of air hose into atmosphere (b) The amount of vacuum
(c) To arrest air pressure from air hose (d) none of the above
1. B 2. B 3. D 4. B 5. B 6. C 7. A
8. D 9. C 10. C 11. A 12. C 13. B 14. C
15. B 16. C 17. D 18. B 19. B 20. C 21. D
22. A 23. B 24. A 25. D 26. C 27. B 28. A
29. B 30. B 31. D 32. D 33. A 34. A 35. C
36. D 37. A 38. C 39. D 40. C 41. C 42. C
43. B 44. A 45. A 46. B 47. A 48. A
Coaching
(a) 1600 litre (b) 1800 litre (c) 1500 litre (d) 2000 litre
3 Under shung tank capacity of roof mounted AC coaches fitted with WRA system is –
(a) 1600 Litre (b) 1700 Litre (c) 1800 Litre (d) 2000 Litre
(a) 0.35 Kg/cm2& 0.75 Kg/cm2 (b) 0.45 Kg/cm2 & 0.5 Kg/Cm2
(c) 0.55 Kg/cm2 & 0.6 Kg/cm2 (d) 0.65 Kg/cm2& 0.75 Kg/cm2
(a) 1.2 letter (b) 1.6 letter (c) 2.5 letter (d) 2.2 letter
11 What should be the interval of check the dashpot oil in mail/Express train?
(a) 15 days (b) 25 days (c) one month (d) two month
12 What is the amount of oil per dashpot in 40-mm depth in modified guide arrangement?
(a) 1.6 Litre (b) 2.5 Litre (c) 2.2 Litre (d) 1.9 Litre
14 In bogie mounted air brake systems, the No of brake cylinder in a coach are
(a) Side bearer (b) Equalizing stay (c) Helical spring (d) Bolster
(a) Horizontal load (b) Tractive (c) Breaking force (d) Vertical force
(a) 3912± 1.0 mm (b) 3812± 1.0 mm (c) 3712± 1.0 mm (d) 3612± 1.0 mm
24 Which type brake system, external slack adjuster have been eliminated?
(a) BMBC (b) UMBS (c) BMBS & UMBS (d) None of the above
(a) Fitted 16 tons in all coaches (b) fitted 18 t o tons in all coaches
(a) Oil clamping (b) Telescopic axle guide with oil damping
(a) To joint bolster and side frame (b) To prevent rational movement of bolster
(c) To connect with upper plank and lower plank (d) None of the above
(a) Servo –20 (b) Lithium base (c) Servo –40 (d) Graphite –20
30 What quantity of grease filled per axle box of SKF make bearing?
(a) Spherical type (b) Plain bearing (c) CTRB (d) None of the above
34 The pulling force required for alarm chain testing should not be more then
37 At what schedule, the over hauling and testing of alarm chain apparatus is done
(a) ‘A’ schedule (b) ‘B’ schedules (c) ‘C’ schedule (d) Special schedule
48 In BMBS whole adjustment of curved pull rod to be done when wheel diameter reaches to –
(a) 839 mm (b) 842 mm (c) 846 mm (d) None of the above
49 Permissible variations in wheel tread diameter for four-wheeled bogie on the same axle on BG is – (while
turning the wheel)
50 Permissible variations in wheel tread diameter on the same coach on BG is – (while turning the wheel)
51 Permissible variations in wheel tread diameter for the same bogie on BG is - (while turning the wheel)
(a) 22.0 tons (b) 16.25 tons (c) 15.0 tons (d) 14.50 tons
(a) 16.0 tons (b) 16.25 tons (c) 15.0 tons (d) 20.30 tons
54 The use of 13 tons axle load bogie is in –
(a) Axle Guide (b) Journal center (c) roller bearing (d) Dash pot
63 Condemning size of radius at the top of flange (Sharp flange) of BG main line coach wheel is –
64 Means of WRA is –
Answer Key
1. D 2. B 3. A 4. 5. A 6. A 7. C
8. C 9. C 10. B 11. C 12. A 13. A 14. D
15. A 16. D 17. A 18. B 19. C 20. A 21. C
22. D 23. D 24. A 25. A 26. A 27. B 28. B
29. B 30. B 31. A 32. C 33. B 34. B 35. D
36. A 37. B 38. C 39. C 40. C 41. B 42. C
43. C 44. A 45. A 46. C 47. B 48. A 49. A
50. D 51. C 52. B 53. B 54. D 55. B 56. C
57. A 58. A 59. A 60. B 61. A 62. D 63. B
64. A 65. B
Goods Stock
1 Permissible variation in new wheel tread diameter on the same axle on BG bogie wagon is –
2 Permissible variation in wheel tread diameter on the same trolley of BG wagon while changing the wheel is
–
3 Permissible variation in wheel tread diameter on the same wagon of BG while changing the wheel is - (a)
13 mm (b) 25 mm (c) 30 mm (d) 28 mm
4 The composite Brake block in yard for air Bk. train should be changed when thickness is
(a) 22.37 tons. (b) 22.47 tons. (c) 22.91 tons. (d) 22.90 tons.
(a) 4.5 year (b) 5.5 year (c) 6.0 year (d) 6.5 year
(a) 4.5 year (b) 2.0 year (c) 6.0 year (d) 3.5 year
(a) 3.5 year (b) 2.0 year (c) 2.5 year (d) 3.0 year
(a) 42.0 kg-m. (b) 40.0 kg-m. (c) 38.0 kg-m. (d) 44.0 kg-m.
(a) Day light (b) Day-night time (c) Only night time (d) None of the above
16 In air brake system, the thread joints are tightened with which type of tape?
(a) Cello tape (b) Teflon tape (c) Paper tape (d) None of the above
17 Instructions for inspection and maintenance of BOXN wagon fitted with CASNUB bogies and air brake
system, What RDSO’s technical pamphlet is used?
Instructions for inspection and maintenance of CASNUB bogies, What RDSO’s technical pamphlet is used?
(a) Owning Railway (b) Type of wagon (c) Year of manufacture (d) Cheek digit
(a) Content contact pad. (b) Close circuit rake (c) Complete coal rake (d) All the above
22 The minimum permissible buffer height above rail line to center of H/ Stock under loaded condition is (a)
1105 mm (b) 1145 mm (c) 1115 mm (d) 1030 mm
25 Standard dimension of distance between the nose of Knuckle and guard arm is
(a) Mark -20 & RF-401 (b) Mark 50 & RF361 (c) CF 21& RF-600 (d) DF 39 & RF-21
29 To Adjust buffer height for 930 mm wheel diameter on BCN wagon except CASNUB 22 W, packing piece
used is
(a) APRT type (b) AARP type (c) AAR type (d) ARPA type
31 The working strength of center buffer coupler is –
32 The tractive effort of the Loco to the individual wagons is transmitted with the help of –
(a) CBC (b) Draw gear (c) Knuckle (d) Side frame
(a) Alliance- II coupler (b) Non- Transition coupler (c) Transition coupler (d) Draw bar
(a) 1010 & 900 mm (b) 1000 & 906 mm (c) 950 & 906 mm (d) 906 & 813 mm
(a) Off load condition (b) Loaded wagon (c) Both condition (d) Empty wagon
(a) 455 ±30 gms (b) 490±15 gms (c) 500±35 gms (d) 550±20 gms
(a) Cap (b) Roller bearing (c) Journal (d) None of the above
(a) 550 to 570 mm (b )555 to 575 mm (c) 570 to 580 mm (d) 555 to 565 mm
44 In air brake end-to end rakes, After intensive examination validity of BPC remain up to the –
(a) Next station (b) Loading point (c) Destination point (d)72 Hours
48. In air brake stock, BPC becomes invalid, if the rake is stabled in any examination yard for more than-
(a) At the time of ROH (b) 2 month (c) 6 month (d) 3 month
51 The BP pressure in Brake Van of 56 -BOXN wagon load should not be less than –
(a) 4.5kg/ Cm2 (b) 3.7 kg/ Cm2 (c) 4.8 kg/ Cm2 (d) 5.8kg/ Cm2
52 When we release manually KE type DV, the air pressure release form –
55 For testing Air pressure locomotive the test plate hole diameter is-
58 The capacity of Auxiliary Reservoir (wagon) in air brake except Bk.Van is-
(a) 200 litre (b) 100 litre (c) 300 litre (d) 150 litre
59 In Single pipe system the time taken in releasing of the wagon brake is-
(a) 60 Sec. (b) 120 Sec. (c) 210 Sec. (d) 90 Sec.
60 Distance between the control rod head and the barrel of SAB is named as –
(a) ‘E’ dimensions (b) ‘C’ dimension (c) ‘A’ dimension (d)“d”dimension
(a) 12-15 Kg/ Cm2 (b) 8-10 Kg/ Cm2 (c) 7-12 Kg/ Cm2 (d) 7-8 Kg/ Cm2
64 Brake power certified issued for Premium end-to-end rakes will be valid for
(a) 10+5 days (b) 12+3 days (c) 15+3 days (d) one month
(a) Collect dirt (b) Collect air (c) Clean air (d) Clean CR
66 How much pressure should drop in a minute after putting a test plate in locomotive?
(a) 0.8 Kg/ Cm2 (b) 1.0 Kg/ Cm2 (c) 1.2 Kg/ Cm2 (d) 1.5 Kg/ Cm2
67 The colour for brake power certificate for Premium end-to-end rake is-
68 For testing DV the time required for brake cylinder draining from 3.8 to .04 kg/cm2 is –
(a) 30-40 sec (b) 40-50 sec (c) 45-60 sec (d) 50-75 sec
73 Control rod of SAB when rotated for one round, control rod head moves by a distance of
(a) Wheel and brake block (b) Tie Rod and Brake block
(a) 6.0 to 8.0 Kg/ Cm2 (b) 8.0 to 10.0 Kg/ Cm2
(c) 10.0 to 12.0 Kg/ Cm2 (d) 12.0 to 15.0 Kg/ Cm2
(a) Single wagon test rubber (b) Single wagon test rig
(a) AR (b) Control reservoir (c) Brake cylinder (d) All above
79 To uncouple BP or FP air hose it is essential to
(a) Open adjacent angle cock (b) Close adjacent angle cocks
(c) Close supply of air from loco (d) None of the above
(a) Yellow empty, black loaded (b) Blue empty, black loaded
(c) White empty, black loaded (d) black empty, blue loaded
(c) Take out pin of SAB (d) Isolate DV & release manually.
(a) To push the spring outside the piston (b) To push the piston inside the cylinder
(c) To push the deed lever (d) to push the control rod
(a) 19.2 ton (b) 22.9 ton (c) 20.3 ton. (d) 20.9 ton
88 What type of pivot used in CASNUB 22WM, 22NL and other type of CASNUB trolley?
(a) IRS type (b) Spherical type (c) other type (d) cylindrical type
89 What is the nominal lateral clearance between side frame & axle box/adopter Casnub 22NL, 22NLB, 22HS
bogie?
(a) 18 mm (b) 16 mm (c) 22 mm (d) 25 mm
(a) Metal CC type (b) Spring loaded CC type side bearer & PU type
96 Which types of steel are used in side frame column friction plates of Casnub bogie?
(a) Mild steel (b) Carbon steel (c) Silico manganese steel (d) None of the above
Answer Key
1. B 2. B 3. B 4. A 5. C 6. B 7. C
8. B 9. A 10. C 11. C 12. A 13. B 14. B
15. A 16. B 17. B 18. D 19. B 20. C 21. B
22. D 23. C 24. C 25. C 26. C 27. B 28. B
29. B 30. C 31. B 32. B 33. C 34. B 35. A
36. A 37. A 38. A 39. C 40. B 41. C 42. B
43. B 44. C 45. B 46. A 47. B 48. A 49. A
50. B 51. C 52. C 53. B 54. A 55. B 56. B
57. A 58. B 59. A 60. C 61. B 62. C 63. B
64. B 65. C 66. B 67. A 68. C 69. B 70. D
71. B 72. D 73. C 74. A 75. A 76. B 77. B
78. D 79. B 80. A 81. D 82. B 83. B 84. D
85. A 86. B 87. C 88. B 89. B 90. A 91. C
92. C 93. A 94. C 95. B 96. C 97. B
Special Wagons
(a) 58.88 tons (b) 54.28 tons (c) 55.80 tons (d) 52.3 tons
(a) 20.32 tons (b) 22.35 tons (c) 21.35 tons (d) 25.22 tons
(a) Kerosene oil (b) patrol (c) labium (d) none of the above
(a) CBC & Slack Less Drawbar (b) HT CBC (c) Screw coupling (d) Slackness drew bars
7 The mechanical code of bogie Petrol tank wagon fitted with pneumatic brake is –
(a) CTB & CTBS (b) TCS & BTCS (c) THA & BTCS (d) TCS& MBTS
(a)UN loading (b) Loading (c) Running (d) none of the above
(a) 1.4 Kg/cm2 (b) 4.1 Kg/cm2 (c) 2.1 Kg/cm2 (d) 1.2 Kg/cm2
12 Interval of ROH in BTPN tank wagon is –
(a) Lithium phosphate (b) Sodium phosphate (c) Bromide phosphate (d) none of the above
(a) 0.35 to .56 kg/ Cm2 (b) 0.45 to 0.65 kg/ Cm2 (c) 0.65 to 0.75 kg/ Cm2 (d) None of the above
15 What is the location of safety valves fitted in liquefied petroleum gas tank wagon?
(a) Inside dome (b) Outside dome (c) Outside on barrel (d) none of the above
17 For lifting the container, force required to lift the container on automatic twist lock is-
(a) Cast steel (b) Low cast steel (c) Steel (d) Micro steel
20 Length of over Slack less draw bar for B-car of BLC wagon is –
21. The standard height of platform for BLC wagon from Rail level is –
(a) 20.10 ton. (b) 20.32 ton. (c) 21.10 ton. (d) 23.10 ton.
(a) 21.20 ton. (b) 19.10 ton. (c) 19.80 ton. (d) 20.22 ton.
26 In BLC wagon, height of slack less drawbar system from Rail level is –
(c) Spring loaded side bearer and PU pad (d) none of the above
(a) UIC trolley (b) Cast steel bogie type LCCF 20 (C) (c) IRS trolley (d) Diamond frame trolley
31 For automatic locking & for lifting of automatic twist lock how much force is Kg required, respectively?
(a) 600 & 1000 Kg (b) 800 & 1200 Kg (c) 1000 & 500 Kg (d) 500 & 1350 Kg
(a) Two 20' or one 40' (b) Two 22' or one 45'
(c) Three 15' or two 20 ' (d) Two 20' or one 45'
ANSWERS
1. B 2. A 3. A 4. A 5. C 6. C 7. A
8. B 9. B 10. B 11. A 12. D 13. B 14. A
15. A 16. A 17. B 18. B 19. A 20. C 21. C
22. B 23. B 24. A 25. A 26. C 27. B 28. B
29. C 30. B 31. A 32. B 33. A
Abbreviation:
1. AITUC –
a. All India trade unions congress b. All Indonesia Train Union Congress
b. All Indian union committee d. None of the above
2. BOLT –
a. Built operate lease transfer b. Brake Open Lost Total
b. Built operation total transfer d. None of the above
3. BOOT –
a. Burnt open output transfer b. Built operate own transfer
c. Breakup operate own transfer d. none of above
4. BIS –
5. CTRB –
6. COFMOW –
d. None of above
7. CRIS –
9. CRS –
10. CONCOR –
11. COIS –
12. COEA –
13. CORE –
14. DMRC –
15. DRF –
1. A 2. A 3. B 4. A 5. B 6. A 7. A
8. A 9. A 10. A 11. B 12. B 13. A 14. A
15. A
JE/dfu’B vfHk;ark
dSjst ,oa oSxu dk iz”u cSad
Carriage and Wagon Question Bank
4. BOXN oSxu dk POH ------------- fdrus eghus ds vrajky esa fd;k tkrk gSA
POH of BOX N Wagon is done at the interval of -------------month.
5. ICF dksp dk POH ------------ fdrus eghus ds vrajky esa fd;k tkrk gSA
POH of ICF Coach is done at the interval of ------------month.
(a) 24 (b) 12 (c) 18 (d) 30
7. jsy Lrj ls dksp dh U;wure cQj ÅapkbZ &&&&& fdruk feeh gSA
Minimum buffer height of coach from Rail level is ---------------mm.
8. Hkkjr &teZu ifj;kstuk esa la”kksf/kr czsd che gSaxj dh yackbZ gS&&&&&
feehA
Length of modified brake beam hanger in Indo-German project is -----------mm.
(a) 325 (b) 235 (c) 250 (d) 150
9. ouZ
Oghy izskQkby ds ¶ysat dh vf/kfdre eksVkbZ gksrk
gS&&&&&&&&&& feehA
Maximum Flange thickness of worn wheel profile is ………… mm.
(a) Mild Steal (b) Corton Steal (c) Stainless Steel (d) Non of them
14. vykeZ psu dk ijh{k.k &&&&&& fdyksxzke otu ij fd;k tkrk gSA
Testing of alarm chain is done at -----------Kg weight.
15. Equalizing LVs jkWM dh fpdukbZ &&&&& f”kM~;wy esa fd;k tkrk gSA
Greasing of equalizing stay rod is done in--------------schedule.
23. ,d oSxu dh ,d gh dSluc cksfx;ksa esa अनुमेय रूप ांतर &&&& feeh gS
Permissible variation in Wheel dia of same casnub bogies of a wagon is ------------mm.
24. Ikfg;k ds sharp flange dh अनुमेय रूप ांतर &&&&& feeh gSA
Permissible limit of sharp flange of wheel is ------------mm.
25. CBC dh
ÅapkbZ dks lek;ksftr djus ds fy, CASNUB cksxh &&&&&feeh iSafdax
dk mi;ksx fd;k tkrk gS
------------mm packing is used in Casnub Bogie to adjust CBC height.
27. [kkyh BOXN dh fLFkfr esa fiLVu LVªksd &&&&&& feeh gSA
In empty condition of BOXN Piston stroke is ------------mm.
(a) DPT (b) UST (c) Wheel gauge (d) None of these
vykeZ psu flLVe dk vksoj gkWfyax &&&&&&&&ekg esa fd;k tkrk gSA
31. Over hauling of Alarm chain system is done after ------------ Month.
(a) Cast Iron (b) Cast steel (c) Mild Steel (d) Stainless Steel
39. fdlh
oSxu ds nksuksa dSluc cksxh ds chp ifg;s dk vuqes; O;kl gksrk
gS&&&&&&feehA
Permissible Wheel dia difference of both casnub bogies of a wagon is ------------mm.
41. 22MCY;w,e dSluc cksxh dks lek;ksftr djus ds fy, 37 ,e,e iSfdax dk mi;ksx
lhchlh gkbV ifg;k O;kl &&&&& ,e,e ds fy, fd;k tkrk gSA
37 MM packing is used in 22 WM CASNUB bogie to adjust CBC height wheel dia------------mm
(a) wheel defect (b) Buckle defect (c) CBC defect (d) door defect
49. BLC oSxu ds ,d ;wfuV esa &&&&&&&& dkj ch ;wfuV gksrs gaSA
In one unit of BLC wagon there are ----------- car B unit.
Answers
1. A 2. B 3. C 4. D 5.C 6.B 7. A
8. B 9. C 10. C 11. C 12. A 13. A 14. B
15. B 16. C 17. D 18. B 19.A 20. B 21. B
22. A 23. C 24. D 25. A 26. B 27. B 28. B
29. B 30. A 31. A 32. B 33.C 34.C 35.C
36.A 37.A 38.C 39.D 40.A 41. A 42.B
43. B 44. A 45. A 46. B 47. A 48.D 49. A
50. A
ikVZ &3 vkbZlh,Q dksfpax LVkWd dk iz”u A
Part 3: Questions on ICF Coaching Stock
03.;k=h chth dksfpax LVkWd dk ekud U;ure vuqes; Oghy xst gSA
The minimum permissible wheel gauge of passenger BG coaching stock is –
06. fdl varjky vof/k ij ] fdlh Hkh dksp dh xgu lQkbZ gksrh gS ?
At what interval, the intensive cleaning of any coach is?
(a) Three month (b) One month (c) Six month (d) Eight month
(a) 15 days (b) 25 days (c) one month (d) two month
09. esy ,Dlizsl xkM+h ls tqMs+ dksp ds fy, ihvks,p dh vof/k D;k gksxh ?
What shall be the period for POH for a coach attached to Mail/ Express train?
10. PCV ls tqM+s ;k=h xkM+h tks esy ,Dlizsl ls vyx gS mlds POH vof/k D;k gS?
What shall be the period for POH of PCV attached with any other then train mail/
Express train?
ART / ARME dks NksM+dj foHkkxh; dksp POH ds vof/k D;k gS\
12. What is the period for POH of departmental coach except ART/ARME?
14. lsYQ& tsujsfVax fo|qr midj.k ds lkFk yxs nwrh; Js.kh dk ifjogu dksM D;k
gS\
What is the Transportation code of second class fitted with self-generating electrical equipment?
17. ICF VkªWWyh esa fdl Hkkx dk mi;ksx ugha fd;k tkrk gS\
Which part is not used in ICF trolley?
(a) Dashpot (b) Side bearer (c) Shock absorber (d) Drag link
18. lsYQ tsujsfVax osfLVO;wy ds nwrh;s Js.kh ds III Vk;j Lyhij dksp dk ifjogu
dksM D;k gS\
Transportation codes of vestibule second class 3- tier sleeper coach fitted with self generating electrical
equipment is –
19. lsYQ tsujsfVax osfLVO;wy ds III Js.kh ds 2 Vk;j Lyhij dksp dk ifjogu dksM
D;k gS\
What is the Transportation code of vestibule III class two-tier sleeper coach fitted with self-generating
electrical equipment and ladies compartment?
21. czsd fx;j fiu ,oa cq”k esa vf/kdre Dyhjsl gksrk gS\
What is the maximum permissible clearance between brake gear pin and bushes?
22. jsyos
cksMZ ljdqZyj ds vuqlkj esy ,Dlizsl xkfM+;ksa esa &&&&&&
fdyksehVj lds.Mjh ,Dtkeus”ku dh vko”;drk gksrh gSA
As per policy circular No-4 secondary examination of mail/express has been skipped on round trip upto-
(a) Center pivot (b) Bogie (c) Side bearer (d) Wheel
lhvkbZ czsd CykWd dks &&&&&& ,e,e ls T;knk f?klus ij cny fn;k tkuk pkfg,A
24. The CI brake block should be changed, if worn out beyond-
25.,yizdkj dEiksftV czsd CykWd dks &&&&&& ,e,e ls f?klus ij cny fn;k tkuk
pkfg,A
The ‘L’ type composite brake block should be changed, if worn out beyond-
26. ds
izdkj dEiksftV czsd CykWd dks &&&&&& ,e,e ls f?klus ij cny fn;k tkuk
pkfg,A
The ‘K’ type composite brake block should be changed, if worn out beyond-
27. czsd vkbZlh,Q dksp essa ekud iSfdax nqdM+s gksrs gSA
Std. packing pieces of ICF coach is –
29. vkbZlh,Q dksp ds var esa fIkYys jax dh /kkfj;ka n”kkZrh gSA
Yellow strips on end body of ICF indicate is –
(a) Anti-telescopic (b) Dual brake (c) In built air brake (d) Non-Anti-telescopic
a) Internal crack (b) external crack (c) Air flow crack (d) None of the above
32. LVhy
ckWMh okys fMCcksa dh dksMy ykbQ D;k gS ¼Mkbfuax
@isUVªhdkj lfgr½A
What is Codal life of steel bodied coaches (Including dining / pantry cars) -
Periodicity of periodic overhauls earning less then 2.5 lakhs Kms per annum is -
(a) 12 Month (b) 18 Month (c) 24 Month (d) 30 Month
46. ukWu ,lh]th,l] ,lMhlh] ,llh,u dksp dh ckWYLVj dk clearance fLFkfr gSA
In tare condition the bogie frame bolster clearance of non-AC, GS, SDC, SCN coach is -
47. ukWu ,lh]th,l] dksp dh ckWYLVj gross load dk clearance fLFkfr gSA
In gross load condition, the bogie frame bolster clearance of non AC, GS coach is -
48. ukWu ,lh]th,l] ,lMhlh] ,llh,u dksp dh ckWMh cksxh dk clearance fLFkfr gSA
In tare condition the body bogie clearance of non AC, GS, SDC, SCN coach is -
49. ukWu ,lh]th,l] dksp dh ckWMh cksxh gross load dk clearance fLFkfr gSA
In gross load condition, the body bogie clearance of non-AC, GS, coach is -
(a) Two month (b) one month (c) 15 day (d) Three month
(a) One month (b) six month (c) one year (d) two year
59. IRS dksp esa ] jsy ysosy ls Nr ds Åijh Hkkx rd vf/kdre ÅapkbZ gSA
In IRS coaches, the maximum height from rail level top of the roof is -
60. ICF
dksp esa gsM LVkWd cnyrs gSa tc bldh eksVkbZ de gks tkrh gS bruk
ls T;knkA
In ICF coach, replace Headstock if the thickness is reduce more than -
63. iSlstj
dksp esa ,;j czsd miLdj ds fujh{k.k @vuqj{k.k ds funsZ”k esa dkSu lk
RDSO VsfDudy
iSEQysV iz;ksx gksrk gSA
Instruction for Inspection/ maintenance of air brake equipment on passenger coaches, what RDSO’s
technical pamphlet is used -
66. ysoksVjh ds vkarfjd Hkkx dk isfVax fdl “ksM~;wy esa gksrk gSA
At what schedule the painting of lavatories from inside is done –
(a) ‘B’ schedules (b) ‘A’ schedule (c) ‘C’ schedule (d) Special schedule
67. IIad Dykl ikl esa ys tkus okys lkeku ds otu dh vuqefr gSA
Permitted luggage allowed for class pass is –
(a) 35 Kg/ head (b) 50 Kg/ head (c) 70 Kg/ head (d) 100 Kg/ head
68. Ist Dykl ikl esa ys tkus okys lkeku ds otu dh vuqefr gSA
Permitted luggage allowed for class pass is –
(a) 35 Kg/ head (b) 50 Kg/ head (c) 70 Kg/ head (d) 100 Kg/ head
70. dksfpax LVkWd dk fj&gSCyhVs”ku brus o’kZ ds varjky esa gksrk gSA
Rehabilitation of coaching stock is carried out between –
(a) 15% of the total cost (b) 20% of the total cost
(c) 25% of the total cost (d) 35% of the total cost
73.,d czkM xst dksp dk ‘C’ “ksM~;wy ijh{k.k fdrus le; ds vUrjky esa gksrk gSA
At what interval, the schedule ‘C’ examination of a BG coach is?
74.,d dksp dk ‘A’ “ksM~;wy ijh{k.k fdrus le; ds vUrjky esa gksrk gSA
What is the interval of schedule ‘A’ examination of a coach?
75.,d dksp dk ‘B’ “ksM~;wy ijh{k.k fdrus le; ds vUrjky esa gksrk gSA
What is the interval of schedule ‘B’ examination of a coach?
78. vksoj gsM okVj VSad ds lQkbZ ,oa ¶yf”kax dk le; vUrjky esa gksrk gS\
What is the interval of cleaning/ flushing of overhead water tank?
79. dkWeksM esa tax&izfrjks/kh isUV dh tkap fdrus le; vUrjky esa gksrk gS\
At what interval, check the anticorrosive paint in commode?
(a) One month (b) Three month
(c) Six month (d) None of the above
80. ICF dksp dk IOH fdrus le; vUrjky esa gksrk gSS\
At what interval IOH of ICF coaches is done -
(a) Two month (b) Three month ±15 days
(c) Six month ±7 day (d) Six month ±15 day
82. “krkCnh dksp dk IOH fdrus le; vUrjky esa gksrk gSS\
At what interval, the IOH of shatabdi coaches is?
(a) 12 months or four lake km which is earlier
(b) 9 months or two lakh km which is earlier
(c) 6 months or one lake km which is earlier
(d) None of the above
83. Cksxh ekmUVsM ,;j czsd flLVe okys dksp dh ifgpku D;k gSS\
The identification of bogie mounted air brake system coach is –
84. jkt/kkuh ,oa “krkCnh ds vykok ICF dksp ds IOH dk le; vUrjky fdruk gSS\
What is the periodicity for IOH of ICF coaches except Rahdhani & Shatabdi?
85. ICF/RCF dksp esa fMLVªD”ku V~;wc dgka yxk;k tkrk gS\
Where has been distraction tube provided in ICF/RCF coaches?
Answer Key
a) 23570 mm b) 23545 mm
c) 23540 mm d) 23565 mm
3. LHB dksp ds vksoj ckWMh dh vf/kdre pkSM+kbZ D;k gSS\
What is the maximum width over body of LHB coaches?
a) 3260 mm b) 3240 mm
c) 3456 mm d) 2356 mm
LHB dksp ds Vs;j dUMh”ku esa jsy ysoy ls dEikVZesUV ¶ywj dh ÅapkbZ
gksrh gSSS\
4. Height of compartment floor from rail level under tare condition of LHB coaches?
a) 1320 mm b) 1389 mm
c) 1305 mm d) 1345 mm
jsy ysoy ls [kyh xkM+h ds lhchlh lkbM ds lsUVj ykbu dh vf/kdre ÅapkbZ D;k
gSSS\
5. What is Maximum height of centre line of side CBC above rail for empty vehicle?
a) 1108 mm b) 1107 mm
c) 1105 mm d) 1103 mm
jsy ysoy ls yksM xkM+h ds lhchlh lkbM ds lsUVj ykbu dh U;wure ÅapkbZ D;k
gSSS\
6. What is minimum height of centre line of CBC above rail level for loaded vehicle?
a) 1030 mm b) 1039 mm
c) 1025 mm d) 1015 mm
a) 1676 mm b) 1600±1 mm
c) 1610 mm d) 1676 ±1 mm
a) 910 mm b) 915 mm
c) 912 mm d) 725 mm
10.,y,pch ifg;k O;kl dh fyfeV lhek D;k gS\
What is the condemning limit of LHB wheel diameter?
a) 813 mm b) 839 mm
c) 845 mm d) 854 mm
a) One b) Two
c) Three d) Four
12.,y,pch dkspksa esa fdl izdkj ds jksyj cs;fjax dk mi;ksx fd;k tkrk gS\
Which type of Roller bearing is used in LHB coaches?
13.,y,pch dkspksa esa ifg;k dk fudyk gqvk fdukjs dh eksVkbZ D;k gS\
What is the thickness of wheel flange in LHB coaches?
a) 24 mm b) 26.5mm
c) 26 mm d) 25 mm
a) 650 mm b) 630 mm
c) 640 mm d) 645 mm
a) 172 MM b) 170 MM
c) 153 MM d) 165 MM
a) 1 b) 2
c) 3 d) 4
18. TIMKEM CTBU dh vf/kdre lhek D;k gS\
What is the maximum temperature limit for TIMKEM CTBU?
a) 90 oC b) 80 oC
c) 85 oC d) 87 oC
19. LHB dksp esa fdrus izdkj ds “kkWd absorbers dk mi;ksx fd;k tkrk gSS\
How many types of shock absorbers are used in LHB Coaches?
a) 6 b) 5
c) 4 d) 3
+++++
LHB dksp esa fdrus izdkj ds euh “kkWd absorbers dk mi;ksx fd;k tkrk gSS\
20. How many shock absorbers are used in LHB Coaches?
a) 10 nos. b) 8nos.
c) 18nos. d) 12 nos.
cksxh vkSj dkj ckWMh ds chp tqM+k Shock absorber dk uke fd;k gSS\
21. What is the name of shock absorber connected between bogie and car body?
a) Primary b) Secondary
c) Yaw d) None of these
a) 23590 mm b) 24000 mm
c) 24095 mm d) 24225 mm
a) 3.5 b) 3.8
c) 2.5 d) 3.0
a) 12340 mm b) 10390 mm
c) 11545 mm d) 12010 mm
a) 13780 mm b) 14030 mm
c) 14900 mm d) 14350 mm
28. xzkl yksM ,oa ouZ dUMh”ku esa vf/kdre vuqes; cQj Mªki gS
Maximum permissible buffer drop under gross load and worn condition is –
a) 65 mm b) 70 mm
c) 75 mm d) 80 mm
a) 1 year b) 2 years
c) 1.5 year/ 6 lakes Kms earned whichever is earlier
d) 3 years/ 6 lakes Kms earned whichever is earlier
a) 1 year b) 2 years
c) 1.5 year/ 6 lakes Kms earned whichever is earlier
d) 3 years/ 12 lakes Kms earned whichever is earlier
a) 5 lakh b) 6 lakh
c) 9 lakh d) 12 lakh
a) 5 lakh b) 6 lakh
c) 12 lakh d) 24 lakh
a) 5 years b) 4 years
c) 3 years/ 12 lakes Kms earned whichever is earlier
d) 6 years/ 24 lakes Kms earned whichever is earlier
a) 18 months b) 12 months
c) 9 months d) 14 months
a) 30 years b) 25 years
c) None of the above d) 35 years
39. vkmV LVs”ku esa jkt/kkuh dksp dk ,;j czsd ikoj gksrk gSA
Brake power of air brake for Rajdhani coaches from out station is -
a) 90% b) 100%
c) 85% d) 95%
a) 24000 mm b) 23540 mm
c) 2400 mm d) 24430 mm
41. – bUtu ,oa ikoj dkj ds e/; ofVZdy LykbfMax dks jksdus okys ;qfdr dks dgk
tkrk gSA
To protect vertical sliding between engine and power car, the device is known as -
Answers Part 4
1.- (b) 2.- (c) 3.- (b) 4.- (a) 5.- (c) 6.- (a) 7.- (c)
8.- (b) 9.- (b) 10.- (c) 11.- (b) 12.- (c) 13.- (b) 14.- (b)
15.- (c) 16.- (c) 17.- (b) 18.- (b) 19.- (c) 20.- (c) 21.- (c)
22.- (c) 23.- (b) 24.- (c) 25.- (c) 26.- (a) 27.-(c) 28.- (c)
29.- (c) 30.- (b) 31.- (c) 32.- (c) 33.- (d) 34.- (b) 35.-(c)
36.- (d) 37.- (a) 38.- (c) 39.- (a) 40.- (b) 41.- (b) 42.- (c)
chth chth oSxu ds 4 –wheeled VªkWyh esa pDds cnyrs le; ,d gh oSxu ds
pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
06. Permissible variation in wheel tread diameter for four-wheeled trolley on the same wagon on BG
bogie wagon while changing the wheel is –
chth cksxh oSxu ds 6 –wheeled VªkWyh esa pDds cnyrs le; ,d gh VªkWyh
ds pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
08. Permissible variation in wheel tread diameter for six-wheeled trolley on the same trolley on BG
bogie wagon while changing the wheel is –
chth cksxh oSxu ds 6 –wheeled VªkWyh esa pDds cnyrs le; ,d gh oSxu ds
pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
09. Permissible variation in wheel tread diameter for six-wheeled trolley on the same wagon on BG
bogie wagon while changing the wheel is –
(a) 6 mm (b) 13 mm (c) 12 mm (d) 15 mm
10. Permissible variation in new wheel tread diameter for six-wheeled unit on the same axle on BG
bogie wagon wheel is –
chth cksxh oSxu ds 6 –wheeled Unit esa pDdk cnyrs le; ,d gh VªkWyh ds
pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
11. Permissible variation in wheel tread diameter for six-wheeled unit on the same trolley on BG
bogie wagon while changing the wheel is –
chth cksxh oSxu ds 6 –wheeled Unit esa pDdk cnyrs le; ,d gh oSxu ds
pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
12. Permissible variation in wheel tread diameter for six-wheeled unit on the same wagon on
BG bogie wagon while changing the wheel is -
chth cksxh oSxu ds 4–wheeled Unit esa pDdk cnyrs le; ,d gh oSxu dss
pDdksa ds VªsM
O;kl esa vuqes; vUrj gSA
14. Permissible variation in wheel tread diameter for four-wheeled unit on the same wagon on
BG bogie wagon while changing the wheel is -
15. The composite Brake block in yard for air Bk. train should be changed when thickness is -
BOX oSxu esa pDds ,oa czsd CykWd ds chp LVS.MMZ xSi gksrk gSA
16. The Std. Gap between wheel & bk. Block in BOX wagon is -
533- mm O;kl dk ‘F’ Vkbi oSD;e flysaMj mi;ksx gksrk g]S blesaA
BOX/BCXT O;kl esa gsM LVkWd ,oa Vªsu ikbi ,.M ds e/; nwjh gksrh gSA
19. In BOX/BCXT wagon the distance between Headstock & end of train pipe is -
(a) 22.37 tons. (b) 22.47 tons. (c) 22.91 tons. (d) 22.90 tons.
(a) 25.2 tons. (b) 24.4 tons (c) 23.80 tons (d) 24.80 tons.
czsd oSu xqM~l (BVG) dk Oghy Vk;j VsM dk O;kl gksrk gSA
29. What is the wheel diameter on tread of the brake van goods (BVG)?
fdl izdkj ds fMiks esa ,;j czsd oSxu dk vkj,pvks ugha fd;k tkrk gSA
32. In what type of depot, the ROH of air brake wagon should not be carried out -
(a) ‘A’ category (b) ‘B’ category (c) ‘C’ category (d) ‘D’ category
UIC
VkªWyh esa osfYMax fjis;j esa RDSO dk dkSu lk iSEQysV iz;ksx
gksrk gSA
BOBR oSxu ds Mksj vkWijs”ku esa U;ure fdrus izs”kj dh vko”;drk gksrh
gS
34. Minimum pressure required for door operation on BOBR wagon is –
(a) 5.0 kg/cm2 (b) 4.92 kg/cm2 (c) 3.9 kg/cm2 (d) 6.3 kg/cm2
(a) 22.47 tons. (b) 25.37 tons. (c) 27.20 tons. (d) 27.80 tons.
czsd oSu xqM~l (BVG) esa dkSu lk izdkj dk Mªk fx;j mi;ksx gksrk gSA
38. What type of draw gear used in brake van goods (BVG)?
BOBR oSxu ds Mksj vkWijs”ku esa vf/kdre izs”kj ugha c<+uk pkfg,A
39. Maximum pressure for door operation on BOBR wagon should not exceed -
(a) 8.56 kg/cm2 (b) 8.90 kg/cm2 (c) 9.14 kg/cm2 (d) 9.90 kg/cm2
40. Length over buffer/coupler of the brake van match truck (BVM) is –
Uk;s fufeZr BOXN oSxu dk izFke POH dh le; vof/k gksrh gSA
42. Newly built BOXN wagon first POH periodicity is –
(a) 4.5 year (b) 5.5 year (c) 6.0 year (d) 6.5 year
Uk;s fufeZr BLC dUVsuj oSxu dk izFke POH dh le; vof/k gksrh gSA
43. Newly built BLC containers wagon first POH periodicity is –
(a) 4.5 year (b) 2.0 year (c) 6.0 year (d) 3.5 year
czsd oSu dk xqM~l (BVG) esa czsd flLVe dk izdkj mi;ksx gksrk gSA
46. Types of brake system used in brake van goods (BVG) is –
(a) Air brake (b) Dual brake (c) vacuum brake (d) Non of the above
chth czsd oSu dk PHO dk le; vof/k gksrk gSA
47. POH of BG brake van is –
(a) 3.5 year (b) 2.0 year (c) 2.5 year (d) 3.0 year
(a) 42.0 kg-m. (b) 40.0 kg-m. (c) 38.0 kg-m. (d) 44.0 kg-m.
czsd flfy.Mj Qydze czSdsV ,oa fiLVu jkWMZ vfg ds e/; dh nwjh gksrh
gSA
49. The distances between centers of brake cylinder fulcrum bracket and the piston rod eye
which shall be –
(a) 780±5 mm (b) 782±5 mm (c) 784±5 mm (d) 788±5 mm
v.Mj Qzse ekmUVsM QzsV LVkWd esa fdl izdkj dk dEiksftV czsd Cykd
mi;ksx gksrk gSA
51 Which type of composite brake block is used in freight stock of under frame mounted
brake system?
(a) ‘K’ type (b) ‘L’ type
(c) ‘KL’ type (d) ‘Modified K ’ type
(a) Flat place on tyre (b) Smoke is coming from axle box
(c) No brake binding (d) Broken spring
fjdesUVs”ku ds Ik”pkr chth czsd oSu esa wooddust bag ds cnys D;k
RDSO
lkexzh mi;ksx gksrk gSA
53. After RDSO Recommendation, What material in used BVG brake van in place of wood
dust bag?
czsd oSu eSp Vªd (BVM) esa fdl izdkj dk dyij mi;ksx gksrk gSA
56 What type of coupler used in brake van match truck (BVM)?
,;j czsd flLVe esa pwM+hnkj TokbUV dks fdl izdkj ds Vsi }kjk Vkbi fd;k
tkrk gSA
57 In air brake system, the thread joints are tightened with which type of tape?
45 7mm O;kl dk ‘E’ type oSD;qe flfy.Mj bl oSxu esa gksxk gksrk gSA
58 The ‘E’ type vacuum cylinder of 457mm diameter is used in -
BOX oSxu ds vuqj{k.k ,oa ifjpkyu esa dkSu lk RDSO VsDuhdy iSEQysV
dk mi;ksx gksrk gSA
59 Instructions for maintenance and operation of BOX wagon, What RDSO’s technical pamphlet is
used?
BOBR oSxu ds fujh{k.k ,oa vuqj{k.k esa dkSu lk RDSO VsDuhdy iSEQysV
dk mi;ksx gksrk gSA
62. Instructions for inspection and maintenance of BOBR wagon, What RDSO’s technical
pamphlet is used?
(a) G-73 (b) G-78 (c) G-97 (d) G- 16
CASNUB
cSx dss fujh{k.k ,oa vuqj{k.k esa dkSu lk RDSO VsDuhdy
iSEQysV dk mi;ksx gksrk gSA
63. Instructions for inspection and maintenance of CASNUB bogies, What RDSO’s technical
pamphlet is used?
(a) G-97 (b) G-86 (c) G-90 (d) G- 95
,;j czsd ds fujh{k.k ,oa vuqj{k.k esa funsZ”k ds fy, dkSu lk RDSO
VsDuhdy iSEQysV dk
mi;ksx gksrk gSA
64. Instructions for inspection and maintenance of Air brake, What RDSO’s technical
pamphlet is used?
jsyos cksMZ ds vuqlkj vksisu ykbu esa oSxu dk ,QsfDVo izfr”kr D;k
gSA
65. As per Railway Board, In effective percentage of wagon in open line is –
‘A’ dSVsxjh fMiks lhlh jsd dk chihlh fdrus fnuksa dh oS/krk ds fy, tkjh
djsxkA
66. ‘A’ category depot will issue BPC of CC Rake valid up to Km –
‘A’ dSVsxjh fMiks ds vfrfjDr vU; fMiks lhlh jsd dk chihlh fdrus fnuksa dh
oS/krk ds fy,
tkjh djsxkA
67. Depot, other then ‘A’ category will issue BPC of CC rake valid up to Km –
68. BOXN yksM oSxu dks POH esa okil tkus ds fy, fdrus le; dk fj;klr fn;k tkrk
gSA
What time relaxation of period has been given to a loaded BOX wagon for returning for
POH-
(a) After 15 days (b) After 30 days (c) Before 30 days (d) before 15 days
(a) Covered wagon (b) Open wagon (c) Tank wagon (d) Both of this
(a) Owning Railway (b) Type of wagon (c) Year of manufacture (d) Cheek digit
[kkyh BOX oSxu dks POH esa okil tkus ds fy, fdrus le; dk fj;klr fn;k tkrk
gSA
73 What time relaxation of period has been given to a empty BOX wagon for returning for
POH-
(a) Before 15 days (b) After 30 days (c) Before 30 days (d) before 15 days
Answers Part 5:
AIR BRAKE
1. dksfpax LVkWd ,;j czsd flysaMj ds fy, fiLVu LVªksd D;k gS\
What is the piston stroke for air brake cylinder for Coaching stock?
a. 110 10 mm b. 90 10 mm
c. 200 10 mm d. 450 10 mm
Ans: b. 90 10 mm
2. Ckzsd ,fYids”ku ds nkSjku chih ncko de gks tkus ij D;k gksrk gS\
What happens when BP pressure is reduced during brake application?
Ans b. When BP pressure is reduced by 0.6 kg/cm 2 in 6 secs., brake should apply
dksfpax LVkWd ds ,Qih vkSj chih esa permissible fydst D;k gS\
4. What is the permissible leakage in FP & BP of coaching stock?
Ikw.kZ lsok vkosnu ds nkSjku dksfpax LVkWd esa Qwy pkftaZ dk le;
gSA
6. What is the BC charging time in coaching stock during full service application?
a. 10 to 15 secs. b. 30 to 50 secs.
c. 60-80 secs. d. 3 to 5 secs.
Ans. c. 3 to 5 secs.
a. BC pressure cannot be reduced in steps during b. AR is connected to exhaust through BC and brake
release. releases..
c. BC is connected to exhaust through DV and brake
releases.
,d ikbi czsd flLVe ds lkFk xqMl LVkWd esa czsd release dk le; D;k gS\
11. What is brake release time in Goods Stock with single pipe brake system?
Ans. a. 45 to 60 secs.
12. What is the piston stroke of air brake cylinder in goods stock in empty?
a. 110 10 mm b. 85 10 mm
c. 200 10 mm d. 450 10 mm
Ans: b. 85 10 mm
Ans. a. 300.
chih vkSj ,Qih vkil esa tqMs+ gq, gks Rkks D;k gksxk\
14. What happens if BP & FP are interconnected?
CASNUB BOGIES
1. What is the maximum permissible wheel diameter for the CASNUB 22W retrofitted?
a. 956mm. b. 930
c. 1202 mm d. 1205 mm
Ans: a. 956 mm
CASNUB 22WM cksxh ij fdl izdkj dh lkbM czsfj;j mi;ksx fd;k tkrk gS\
CASNUB cksxh ds lkbM Qzse ij cVu gsM~l iznku djus dk mn~ns”; D;k gS\
3. What is the purpose of providing button heads on the side frame of CASNUB bogie?
a. To pair the side frames within a difference of b. For better riding index
2mm in wheel base.
c. To pair the head stock d. None of above
Ans: a. To pair the side frames within a difference of 2mm in wheel base.
CASNUB cksxh esa ouZ Oghys izskQby dk :V jsfM;l fdruk gksrk gS\
6. What is the root radius of worn wheel profile used on CASNUB bogie?
a. 28 mm b. 6 mm
c. 14 mm d. None of above
Ans. c 14 mm
CASNUB 22HS cksxh essa fdl izdkj lkbM cs;Vj mi;ksx gksrk gS\
Are the adaptors of CASNUB 22WM and CASNUB 22W Retrofitted interchangeable or not?
CASNUB 22HS cksxh essa ,aVh &jksVs”ku oSx D;ksa iznku fd;k tkrk gS\
7. Why anti-rotation lug is provided in CASNUB bogie?
CASNUB cksxh essa ouZ Oghys izksQkby dk :V jsfM;l fdruk gksrk gS\
8. What is the variation in free heights permitted while grouping the coil springs in CASNUB bogie?
a. 5 mm b. 4 mm
c. 15 mm d. 3 mm
Ans. d. 3 mm
,;j gskl dSfj;j czSdsV esa ofVZdy ls 20 fMxzh ,axy ij osfYMax LVkWij dk
mn~ns”; D;k gS\
9. What is the purpose of welding a stopper at an angle of 20 degrees with vertical on air hose carrier
bracket?
CASNUB cksfx;ksa ij fdl izdkj ds jksyj cs;fjax dk mi;ksx fd;k tkrk gS\
CASNUB 22 NLM cksfx;ksa esa fdl izdkj ds lsUVj pivot fiau mi;ksx fd;k tkrk gS\
11. What is the type of Centre pivot pin used in CASNUB 22 NLM bogies?
a. 24. c. 32
c. 12 d. 16
Ans. a. 24
14. Are the truss beams of CASNUB 22 WR and CASNUB 22 NLB interchangeable or not?
Ans. b. interchangeable
DISTRIBUTOR VALVES
Ans: a. To connect AR with BC during brake application & BC with exhaust during release
a. This is the position of Main valve in which BC b. This is the position of Main valve in which FP
is connected to AR. and BC are connected.
c. This is the position of Main valve in which d. None of the above
neither BC is connected to AR nor to Exh
Ans: c. This is the position of Main valve in which neither BC is connected to AR nor to Exh
a. Brake already applied b. The air from CR is also released along with
BP.
c. There is no air d. None of the above
a. To reduce the BP pressure by 0.4 kg/cm2 in b. To reduce the BC pressure by 0.4 kg/cm2 in
addition to the BP pressure reduced from the addition to the BC pressure reduced from the
loco. loco
c. To reduce the FP pressure by 0.4 kg/cm2 in d. None of the above
addition to the FP pressure reduced from the
loco
Ans: a. To reduce the BP pressure by 0.4 kg/cm2 in addition to the BP pressure reduced from the loco.
Ans: a To connect BP with CR during charging, To disconnect CR from BP during application & To connect
CR with BP during insensitivity range
7. Why the Main valve or Three pressure valve is designed to take LAP position?
Ans c. To admit 0.8 kg/cm2 of air into BC immediately during brake application
Ans b. To admit a maximum pressure of 3.8 kg/cm2 of air into BC during full service and emergency
application.
D;k gksrk gS tc flLVe pktZ esa gksrk gS rks EKDV vyx gks tkrk gS\
10. What happens when the EK-DV is isolated when the system is in charging ?
Ans a. Initially brakes will apply and after some time brakes will release.
Lkh&3 MCY;w &Mhoh ds Mcy fjyht okYo esa ykWfdax jkWM iznku djus dk
mn~ns”; D;k gS\
11. What is the purpose of providing locking rod in double release valve of C3W - DV ?
a. Initially brakes will apply and after some time b. To keep CR check valve in open, to facilitate
brakes will release. complete removal of air from CR, even after a
short pull.
c. To admit 0.8 kg/cm2 of air into BC d. None of the above
immediately during brake application
Ans b To keep CR check valve in open, to facilitate complete removal of air from CR, even after a short pull.
a. Initially brakes will apply and after some time b. To keep CR check valve in open, to facilitate
brakes will release. complete removal of air from CR, even after a
short pull.
c. To connect BP with AR during charging & to d. None of the above
prevent back flow of air from AR to BP.
Ans b To connect BP with AR during charging & to prevent back flow of air from AR to BP
a. Initially brakes will apply and after some b. To keep CR check valve in open, to facilitate
time brakes will release. complete removal of air from CR, even after
a short pull.
c. There will be poor brake power, since AR is d. None of the above
connected to BP during brake application
Ans c There will be poor brake power, since AR is connected to BP during brake application
dkSu lk okYo lh 3 MCY;w esa vkikrdkyhu czs ds nkSjku iwoZ esa 3-8
fdyksxzke@lseh2 ds vf/kdre ncko dks fu;af=r djrk gSA
14. Which valve controls the maximum pressure of 3.8 kg/cm2 in BC during emergency brake application in
C3W
ABREVATIONS
(a) Mild Steal (b) Corton Steal (c) Stainless Steel (d) Non of them
23. Permissible variation in Wheel dia of same casnub bogies of a wagon is ------------mm.
(a) DPT (b) UST (c) Wheel gauge (d) None of these
31. Over hauling of Alarm chain system is done after ------------ Month.
(a) Cast Iron (b) Cast steel (c) Mild Steel (d) Stainless Steel
34. In one unit of BLC wagon there are ------------ car A unit.
39. Permissible Wheel dia difference of both casnub bogies of a wagon is ------------mm.
41. 37 MM packing is used in 22 WM casnub bogie to adjust CBC height wheel dia------------mm
(a) wheel defect (b) Buckle defect (c) CBC defect (d) door defect
49. In one unit of BLC wagon there are ----------- car B unit.
Answers
1. A 2. B 3. C 4. D 5.C 6.B 7. A
8. B 9. C 10. C 11. C 12. A 13. A 14. B
15. B 16. C 17. D 18. B 19.A 20. B 21. B
22. A 23. C 24. D 25. A 26. B 27. B 28. B
29. B 30. A 31. A 32. B 33.C 34.C 35.C
36.A 37.A 38.C 39.D 40.A 41. A 42.B
43. B 44. A 45. A 46. B 47. A 48.D 49. A
50. A
(a) Three month (b) One month (c) Six month (d) Eight month
(a) 15 days (b) 25 days (c) one month (d) two month
08. What is the period for the POH of any OCV attached to a passenger train?
09. What shall be the period for POH for a coach attached to Mail/ Express train?
10. What shall be the period for POH of PCV attached with any other then train mail/
Express train?
12. What is the period for POH of departmental coach except ART/ARME?
(a) 24 month (b) 36 month (c) 42 month (d) 60 month
14. What is the Transportation code of second class fitted with self-generating electrical equipment?
(a) Dashpot (b) Side bearer (c) Shock absorber (d) Drag link
18. Transportation codes of vestibule second class 3- tier sleeper coach fitted with self generating
electrical equipment is –
19. What is the Transportation code of vestibule III class two-tier sleeper coach fitted with self-
generating electrical equipment and ladies compartment?
21. What is the maximum permissible clearance between brake gear pin and bushes?
22. As per policy circular No-4 secondary examination of mail/express has been skipped on round trip
upto-
(a) Center pivot (b) Bogie (c) Side bearer (d) Wheel
25. The ‘L’ type composite brake block should be changed, if worn out beyond-
(a) 10 mm (b) 15 mm (c) 20 mm (d) 22 mm
26. The ‘K’ type composite brake block should be changed, if worn out beyond-
(a) Anti-telescopic (b) Dual brake (c) In built air brake (d) Non-Anti-telescopic
a) Internal crack (b) external crack (c) Air flow crack (d) None of the above
32. What is Codal life of steel bodied coaches (Including dining / pantry cars) -
35. Periodicity of periodic overhauls earning less then 2.5 lakhs Kms per annum is -
(a) 12 Month (b) 18 Month (c) 24 Month (d) 30 Month
46. In tare condition the bogie frame bolster clearance of non-AC, GS, SDC, SCN coach is -
47. In gross load condition, the bogie frame bolster clearance of non AC, GS coach is -
48. In tare condition the body bogie clearance of non AC, GS, SDC, SCN coach is -
49. In gross load condition, the body bogie clearance of non-AC, GS, coach is -
(a) Two month (b) one month (c) 15 day (d) Three month
(a) One month (b) six month (c) one year (d) two year
52. The revised maximum payloads of NMG coaches are -
59. In IRS coaches, the maximum height from rail level top of the roof is -
60. In ICF coach, replace Headstock if the thickness is reduce more than -
61. Maintenance and repair procedure for hydraulic shock absorbers used on coaching stock, what RDSO
technical pamphlet is used -
(a) C-7512 (b) C-7301 (c) C-6803 (d) C-7607
62. Maintenance and repair procedure for wheel and axle manual, what RDSO’s technical pamphlet is
used.-
63. Instruction for Inspection/ maintenance of air brake equipment on passenger coaches, what RDSO’s
technical pamphlet is used -
64. Description of water raising system to SK- 86209 and instruction for filling water for air brake
coaches, what RDSO’s technical pamphlet is used -
(a) C-9009 (b) C-9011 (c) C-9103 (d) C-9105
65. Maintenance manual for IRSA-600 slack adjuster, what RDSO’s technical pamphlet is used -
(a) ‘B’ schedules (b) ‘A’ schedule (c) ‘C’ schedule (d) Special schedule
(a) 35 Kg/ head (b) 50 Kg/ head (c) 70 Kg/ head (d) 100 Kg/ head
(a) 35 Kg/ head (b) 50 Kg/ head (c) 70 Kg/ head (d) 100 Kg/ head
(a) 15% of the total cost (b) 20% of the total cost
(c) 25% of the total cost (d) 35% of the total cost
84. What is the periodicity for IOH of ICF coaches expect Rahdhani & Shatabdi?
a) 23570 mm b) 23545 mm
c) 23540 mm d) 23565 mm
a) 3260 mm b) 3240 mm
c) 3456 mm d) 2356 mm
4. Height of compartment floor from rail level under tare condition of LHB coaches?
a) 1320 mm b) 1389 mm
c) 1305 mm d) 1345 mm
5. What is Maximum height of centre line of side CBC above rail for empty vehicle?
a) 1108 mm b) 1107 mm
c) 1105 mm d) 1103 mm
6. What is minimum height of centre line of CBC above rail level for loaded vehicle?
a) 1030 mm b) 1039 mm
c) 1025 mm d) 1015 mm
a) 1676 mm b) 1600±1 mm
c) 1610 mm d) 1676 ±1 mm
a) 910 mm b) 915 mm
c) 912 mm d) 725 mm
a) 813 mm b) 839 mm
c) 845 mm d) 854 mm
a) One b) Two
c) Three d) Four
a) 24 mm b) 26.5mm
c) 26 mm d) 25 mm
a) 650 mm b) 630 mm
c) 640 mm d) 645 mm
a) 172 MM b) 170 MM
c) 153 MM d) 165 MM
17. How many make CTBUs are used on LHB Coaches?
a) 1 b) 2
c) 3 d) 4
a) 90 oC b) 80 oC
c) 85 oC d) 87 oC
19. How many types of shock absorbers are used in LHB Coaches?
a) 6 b) 5
c) 4 d) 3
21. What is the name of shock absorber connected between bogie and car body?
a) Primary b) Secondary
c) Yaw d) None of these
a) 23590 mm b) 24000 mm
c) 24095 mm d) 24225 mm
a) 3.5 b) 3.8
c) 2.5 d) 3.0
a) 12340 mm b) 10390 mm
c) 11545 mm d) 12010 mm
a) 13780 mm b) 14030 mm
c) 14900 mm d) 14350 mm
28. Maximum permissible buffer drop under gross load and worn condition is –
a) 65 mm b) 70 mm
c) 75 mm d) 80 mm
a) 1 year b) 2 years
c) 1.5 year/ 6 lakes Kms earned whichever is earlier
d) 3 years/ 6 lakes Kms earned whichever is earlier
a) 1 year b) 2 years
c) 1.5 year/ 6 lakes Kms earned whichever is earlier
d) 3 years/ 12 lakes Kms earned whichever is earlier
a) 5 lakh b) 6 lakh
c) 9 lakh d) 12 lakh
a) 5 lakh b) 6 lakh
c) 12 lakh d) 24 lakh
a) 5 years b) 4 years
c) 3 years/ 12 lakes Kms earned whichever is earlier
d) 6 years/ 24 lakes Kms earned whichever is earlier
a) 18 months b) 12 months
c) 9 months d) 14 months
a) 30 years b) 25 years
c) None of the above d) 35 years
39. Brake power of air brake for Rajdhani coaches from out station is -
a) 90% b) 100%
c) 85% d) 95%
a) 24000 mm b) 23540 mm
c) 2400 mm d) 24430 mm
41. To protect vertical sliding between engine and power car, the device is known as -
Answers Part 4
1.- (b) 2.- (c) 3.- (b) 4.- (a) 5.- (c) 6.- (a) 7.- (c)
8.- (b) 9.- (b) 10.- (c) 11.- (b) 12.- (c) 13.- (b) 14.- (b)
15.- (c) 16.- (c) 17.- (b) 18.- (b) 19.- (c) 20.- (c) 21.- (c)
22.- (c) 23.- (b) 24.- (c) 25.- (c) 26.- (a) 27.-(c) 28.- (c)
29.- (c) 30.- (b) 31.- (c) 32.- (c) 33.- (d) 34.- (b) 35.-(c)
36.- (d) 37.- (a) 38.- (c) 39.- (a) 40.- (b) 41.- (b) 42.- (c)
04. Permissible variation in new wheel tread diameter for four-wheeled trolley on the same axle on
BG bogie wagon is -
(a) 0.45 mm (b) 0.5 mm (c) 0.35 mm (d) 0.3 mm
05. Permissible variation in wheel tread diameter for four-wheeled trolley on the same trolley on BG
bogie wagon while changing the wheel is –
06. Permissible variation in wheel tread diameter for four-wheeled trolley on the same wagon on BG
bogie wagon while changing the wheel is –
07. Permissible variation in new wheel tread diameter for six-wheeled trolley on the same axle on BG
bogie wagon is –
08. Permissible variation in wheel tread diameter for six-wheeled trolley on the same trolley on BG
bogie wagon while changing the wheel is –
09. Permissible variation in wheel tread diameter for six-wheeled trolley on the same wagon on BG
bogie wagon while changing the wheel is –
10. Permissible variation in new wheel tread diameter for six-wheeled unit on the same axle on BG
bogie wagon wheel is –
11. Permissible variation in wheel tread diameter for six-wheeled unit on the same trolley on BG
bogie wagon while changing the wheel is –
12. Permissible variation in wheel tread diameter for six-wheeled unit on the same wagon on
BG bogie wagon while changing the wheel is -
13. Permissible variation in new wheel tread diameter for four-wheeled unit on the same axle
on BG bogie wagon is -
14. Permissible variation in wheel tread diameter for four-wheeled unit on the same wagon on
BG bogie wagon while changing the wheel is -
16. The Std. Gap between wheel & bk. Block in BOX wagon is -
19. In BOX/BCXT wagon the distance between Headstock & end of train pipe is -
(a) 22.37 tons. (b) 22.47 tons. (c) 22.91 tons. (d) 22.90 tons.
(a) 25.2 tons. (b) 24.4 tons (c) 23.80 tons (d) 24.80 tons.
29. What is the wheel diameter on tread of the brake van goods (BVG)?
32. In what type of depot, the ROH of air brake wagon should not be carried out -
(a) ‘A’ category (b) ‘B’ category (c) ‘C’ category (d) ‘D’ category
(a) 5.0 kg/cm2 (b) 4.92 kg/cm2 (c) 3.9 kg/cm2 (d) 6.3 kg/cm2
36. What is the diameter of side operated hand brake wheel for BOXN wagon is –
(a) 22.47 tons. (b) 25.37 tons. (c) 27.20 tons. (d) 27.80 tons.
38. What type of draw gear used in brake van goods (BVG)?
39. Maximum pressure for door operation on BOBR wagon should not exceed -
(a) 8.56 kg/cm2 (b) 8.90 kg/cm2 (c) 9.14 kg/cm2 (d) 9.90 kg/cm2
40. Length over buffer/coupler of the brake van match truck (BVM) is –
(a) 4.5 year (b) 5.5 year (c) 6.0 year (d) 6.5 year
(a) 4.5 year (b) 2.0 year (c) 6.0 year (d) 3.5 year
(a) Air brake (b) Dual brake (c) vacuum brake (d) Non of the above
(a) 3.5 year (b) 2.0 year (c) 2.5 year (d) 3.0 year
(a) 42.0 kg-m. (b) 40.0 kg-m. (c) 38.0 kg-m. (d) 44.0 kg-m.
49. The distances between centers of brake cylinder fulcrum bracket and the piston rod eye
which shall be –
(a) 780±5 mm (b) 782±5 mm (c) 784±5 mm (d) 788±5 mm
50. The clearance between pins and bushes should not exceed -
(a) 1.0 mm (b) 0.5 mm
(c) 1.5 mm (d) None of the above
51 Which type of composite brake block is used in freight stock of under frame mounted
brake system?
(a) ‘K’ type (b) ‘L’ type
(c) ‘KL’ type (d) ‘Modified K ’ type
(a) Flat place on tyre (b) Smoke is coming from axle box
(c) No brake binding (d) Broken spring
53. After RDSO Recommendation, What material in used BVG brake van in place of wood
dust bag?
(a) Glass wool (b) Cottonwood
(c) Steel wood (d) None of the above
57 In air brake system, the thread joints are tightened with which type of tape?
59 Instructions for maintenance and operation of BOX wagon, What RDSO’s technical pamphlet is
used?
60 What RDSO’s technical pamphlet is used, for maintenance manual of Alliance-II coupler?
61 Instructions for inspection and maintenance of BOXN wagon fitted with CASNUB bogies and twin
pipe air brake system, What RDSO’s technical pamphlet is used?
63. Instructions for inspection and maintenance of CASNUB bogies, What RDSO’s technical
pamphlet is used?
(a) G-97 (b) G-86 (c) G-90 (d) G- 95
64. Instructions for inspection and maintenance of Air brake, What RDSO’s technical
pamphlet is used?
(a) G-97 (b) G-81 (c) G-73 (d) G- 71
67. Depot, other then ‘A’ category will issue BPC of CC rake valid up to Km –
68. What time relaxation of period has been given to a loaded BOX wagon for returning for
POH-
(a) After 15 days (b) After 30 days (c) Before 30 days (d) before 15 days
(a) Covered wagon (b) Open wagon (c) Tank wagon (d) Both of this
72 As per new wagon numbering scheme, first two digits will indicate-
(a) Owning Railway (b) Type of wagon (c) Year of manufacture (d) Cheek digit
73 What time relaxation of period has been given to a empty BOX wagon for returning for
POH-
(a) Before 15 days (b) After 30 days (c) Before 30 days (d) before 15 days
Answers Part 5:
01 – (c) 02 – (a) 03 – (d) 04 – (b) 05 – (b) 06 – (b)
07 – (b) 08 – (b) 09 – (a) 10 – (b) 11 – (c) 12 – (c)
13 – (b) 14 – (d) 15 – (a) 16 – (c) 17 – (c) 18 – (c)
19 – (b) 20 – (b) 21 – (b) 22 – (b) 23 – (a) 24 – (c)
25 – (a) 26 – (b) 27 – (c) 28 – (c) 29 – (d) 30 – (c)
31 – (a) 32 – (d) 33 – (b) 34 – (b) 35 – (c) 36 – (b)
37 – (c) 38 – (a) 39 – (c) 40 – (a) 41 – (c) 42 – (c)
43 – (c) 44 – (c) 45 – (a) 46 – (c) 47 – (b) 48 – (b)
49 – (b) 50 – (c) 51 – (b) 52 – (c) 53 – (a) 54 – (c)
55 – (a) 56 – (b) 57 – (b) 58 – (d) 59 – (d) 60 – (c)
61 – (b) 62 – (a) 63 – (d) 64 – (a) 65 – (b) 66 – (c)
67 – (a) 68 – (b) 69 – (b) 70 – (c) 71 – (a) 72 – (b)
73 – (c) 74 – (c) 75 – (b)
AIR BRAKE
1. What is the piston stroke for air brake cylinder for Coaching stock?
a. 110 10 mm b. 90 10 mm
c. 200 10 mm d. 450 10 mm
Ans: b. 90 10 mm
Ans b. When BP pressure is reduced by 0.6 kg/cm 2 in 6 secs., brake should apply
6. What is the BC charging time in coaching stock during full service application?
a. 10 to 15 secs. b. 30 to 50 secs.
c. 60-80 secs. d. 3 to 5 secs.
Ans. c. 3 to 5 secs.
11. What is brake release time in Goods Stock with single pipe brake system?
Ans. a. 45 to 60 secs.
12. What is the piston stroke of air brake cylinder in goods stock in empty?
a. 110 10 mm b. 85 10 mm
c. 200 10 mm d. 450 10 mm
Ans: b. 85 10 mm
13. What is the size of BV cylinder of Goods stock ?
Ans. a. 300.
CASNUB BOGIES
1. What is the maximum permissible wheel diameter for the CASNUB 22W retrofitted?
a. 956mm. b. 930
c. 1202 mm d. 1205 mm
Ans: a. 956 mm
3. What is the purpose of providing button heads on the side frame of CASNUB bogie?
a. To pair the side frames within a difference of b. For better riding index
2mm in wheel base.
c. To pair the head stock d. None of above
Ans: a. To pair the side frames within a difference of 2mm in wheel base.
6. What is the root radius of worn wheel profile used on CASNUB bogie?
a. 28 mm b. 6 mm
c. 14 mm d. None of above
Ans. c 14 mm
7. Are the adaptors of CASNUB 22WM and CASNUB 22W Retrofitted interchangeable or not?
9. What is the variation in free heights permitted while grouping the coil springs in CASNUB bogie?
a. 5 mm b. 4 mm
c. 15 mm d. 3 mm
Ans. d. 3 mm
10. What is the purpose of welding a stopper at an angle of 20 degrees with vertical on air hose carrier
bracket?
12. What is the type of Centre pivot pin used in CASNUB 22 NLM bogies?
13. Which type of bogie is provided with fish belly shaped bolster?
a. 24. c. 32
c. 12 d. 16
Ans. a. 24
15. Are the truss beams of CASNUB 22 WR and CASNUB 22 NLB interchangeable or not?
Ans. b. interchangeable
DISTRIBUTOR VALVES
Ans: a. To connect AR with BC during brake application & BC with exhaust during release
a. This is the position of Main valve in which BC b. This is the position of Main valve in which FP
is connected to AR. and BC are connected.
c. This is the position of Main valve in which d. None of the above
neither BC is connected to AR nor to Exh
Ans: c. This is the position of Main valve in which neither BC is connected to AR nor to Exh
a. Brake already applied b. The air from CR is also released along with
BP.
c. There is no air d. None of the above
a. To reduce the BP pressure by 0.4 kg/cm2 in b. To reduce the BC pressure by 0.4 kg/cm2 in
addition to the BP pressure reduced from the addition to the BC pressure reduced from the
loco. loco
c. To reduce the FP pressure by 0.4 kg/cm2 in d. None of the above
addition to the FP pressure reduced from the
loco
Ans: a. To reduce the BP pressure by 0.4 kg/cm2 in addition to the BP pressure reduced from the loco.
Ans: a To connect BP with CR during charging, To disconnect CR from BP during application & To connect
CR with BP during insensitivity range
7. Why the Main valve or Three pressure valve is designed to take LAP position?
Ans c. To admit 0.8 kg/cm2 of air into BC immediately during brake application
Ans b. To admit a maximum pressure of 3.8 kg/cm2 of air into BC during full service and emergency
application.
10. What happens when the EK-DV is isolated when the system is in charging ?
11. What is the purpose of providing locking rod in double release valve of C3W - DV ?
a. Initially brakes will apply and after some time b. To keep CR check valve in open, to facilitate
brakes will release. complete removal of air from CR, even after a
short pull.
c. To admit 0.8 kg/cm2 of air into BC d. None of the above
immediately during brake application
Ans b To keep CR check valve in open, to facilitate complete removal of air from CR, even after a short pull.
a. Initially brakes will apply and after some time b. To keep CR check valve in open, to facilitate
brakes will release. complete removal of air from CR, even after a
short pull.
c. To connect BP with AR during charging & to d. None of the above
prevent back flow of air from AR to BP.
Ans b To connect BP with AR during charging & to prevent back flow of air from AR to BP
a. Initially brakes will apply and after some b. To keep CR check valve in open, to facilitate
time brakes will release. complete removal of air from CR, even after
a short pull.
c. There will be poor brake power, since AR is d. None of the above
connected to BP during brake application
Ans c There will be poor brake power, since AR is connected to BP during brake application
14. Which valve controls the maximum pressure of 3.8 kg/cm2 in BC during emergency brake application in
C3W
2. What is S-1830?
4. What is the form to be used for transferring of materials from one Depot to another Depot ?
Ans. Challan ST – 47
Ans. One year based on the consumption of imprest items for the past 6 months
6. What is the form to be used for procuring the non-stocked items, if the value exceeds Rs.20,000/-
Ans. S – 1302 A
7. What is S – 1313?
8. What is the form to be used for recouping the books & forms?
9. What is M-268?
10. What is the form to be used for Repair & return directly from shop?
11. What is the form to be used for Repair & Return, when processed through stores depot?
Ans. S-1302
12. What is the maximum stocking limit for the imprest items?
Ans. Two months.
Raj Bhasha
1. In which part and in which article of the Constitution provision regarding the language to be used
for transaction of business in Parliament exists?
2. In which part and in which article of the constitution provision regarding the Language to be used
for transaction of business in State Legislature exists?
a. Article 190 of Part V of the Constitution b. Article 210 of Part VI of the CPC
c. Article 210 of Part VI of the Constitution d. None of the above
3. In which part and in which article provision regarding on Official Language exists?
a. Part XVII and article 343 to 351 of the b. Part XVII and article 343 to 351 of the CPC
Constitution
c. Preamble d. None of the above
4. In which part of the Constitution provision regarding on Official Language exists? How many
chapter and articles are there in that part?
a. (Part XVII of the constitution) it has four b. Part I of the constitution it has 15 chapters
chapters and articles NO. 343 to 351. and articles NO. 336 to 351.
c. Preamble d. None of the above
Ans: a. (Part XVII of the constitution) it has four chapters and articles NO. 343 to 351.
5. When was provision regarding Official Language passed by the Constituent Assembly?
a. 14- September 1949 b. 14- September 1936
c. 15-January 1975 d. None of the above
6 Which articles of the Constitution contain provision regarding the Official Language of the union of
India?
7. Which articles of the Constitution contain provision regarding the language to be used in the court
etc?
8 Which articles of the Constitution contain provision regarding the official language of States?
9. At present how many Languages are enlisted in the English schedule of the constitution?
a. 18 b. 22
c. 0 d. None of the above
Ans: b. Eighteen
10. When the constitution was adopted, how many languages were included in the eight schedules
initially ?
a. 14 b. 22
c. 0 d. None of the above
Ans: a. When the constitution was adopted, only 14 languages were included in the eight schedule. in
Sindhi was added to that list. In 1992 Nepali, Konkani and Manipuri were added)
11. According to article 343 (1) of the constitution, Hindi in which script is the official language of the
union of India?
a. Roman b. Gurumikhi
c. Devnagari d. Hebrew
a. 15.08.1947 b. 15.04.1990
c. 01.01.2000 d. 26.01.1965
Ans: d. 26.01.1965
13. Who was the Chairman of the Official Language commission constituted under article 344 (1)?
Ans: b. Nepali
15. How many sections are there in the official language Act 1963 as amended in 1967?
a. 18 b. 9
c. 0 d. None of the above
Ans: b. 9 sections
16. When is the Hindi day celebrated every year?
a. 18th January b. 14th September.
c. 31st January d. None of the above
Ans: a. For making provisions regarding the continued use of English along with Hindi even after 1965.
18. Which are the three regions as per the provisions made in the Official Languages rule?
a. Region A, B, C b. Hindi and Non Hindi
c. Region Red, Blue and Green d. None of the above
Ans: a. Region A, B, C.
19. What is the order of language used in the name/ Notice boards?
a. Regional language – Hindi - English b. Hindi and Regional language –English
c. English – Hindi -Regional language d. None of the above
Ans: c. Region C
One Liner Questions
21. Name the sections of the official languages act 1963 (as amended in 1967) which are not applicable
to Jammu & Kashmir? Which section of the act contains provisions to that effect?
Ans: Section 6&7 of official language Act 1963 (as amended in 1967) are not applicable to Jammu &
Kashmir. Section 9 of this act contains provisions regarding that effect.
22. Under what authority is the annual programme prepared? Who prepares the same?
Ans: On the authority of Official Language resolution passed in 1968, the official language department of
the ministry of home affairs prepares the annual programme.
23. Under What authority was the Official Language (use for official purposes of the union) rules 1967
introduced and passed by the parliament?
Ans: (Exercising powers conferred by section 8read with sub-section (4) of section 3 of the Official
language Act 1963 (as amended in 1967).
24. To Which state of India are the official languages(use for official purposes of the union) Rules 1976
not applicable?
25. Where does the provision making the administrative head of each central government office
responsible for compliance of provisions of Official Language Act and rules exists?
Ans: Section 12 of the Official Languages (use for official purposes of the union) rules, 1976.
26. What are the Hindi examinations conducted at the Govt officers?
27. What are the facilities available for writing the above Hindi examinations?
Ans: Regular, Intensive, Correspondence Course, Part time classes and Private.
28. Name the articles of the Constitution, which in their provision contains reference to eight schedule
of the constitution?
Ans: (Articles 344(1) and 351)
Region b—Gujarat, Maharastra and Punjab and the Union territory of Chandigarh.
Region C – States and Union territories other than the those referred in region A & B.
(Tamilnadu, Kerala, Karnataka, Andhra Pradesh, Orissa, west Bengal, Sikkim, Assam,
Nagaland, Meghalaya, Arunachal Pradesh,etc.)
30. What are the documents coming under Section 3(3), of OL Act, which are to be issued in Hindi-
English bilingual form?
Ans:
1 Resolution
2. General orders, memorandum, circulars etc.
3. Rules
4. Notifications
5. Administrative and other reports
6. Press communiqués
7. Contracts, agreements etc.
8. Licenses and permits
9. Tender notices and tender forms
10. Papers to be laid before a house or both the Houses of Parliament.
11. Reservation charts.
31. What are the cases where regional language, Hindi and English should be used?
32. What are the places where Hindi and English should be used?
34. When and under what authority was the Official Language commission constituted? Who was its
chairman?
Ans: Under the provision made in article 344(01), the official language commission was constituted on
07.06.1955. Its chairman was Shri.B.G.Kher)
35. Who was the Chairman of the committee of Parliament on Official Languages constituted under
article 344(4)? What was the work entrusted to that committee?
36. When the parliament was discussing the official language Act, three successive prime ministers
assured the house that Hindi would not be imposed on Non-Hindi speaking people.
(a) Who were the late successive prime ministers who gave such assurance?
Ans: Late Shri Pandit Jawaharlal Nehru.
Late Shri Lal Bhahadur Shastri
Late Shri Indira Gandhi.
(b) Which section of the official language Act contains provision regarding that Hindi would not be
imposed on the Non-Hindi speaking people?
Section 3(5) of official Act.
37. What are the Languages included in the eight schedule? Articls 344(1) and 351)
1. Assamese 2. Bengali 3. Bodo
4.Dogri 5. Gujarati 6. Hindi
7. Kannada 8. Kashmiri 9. Konkani
10. Malayalam 1. 11. Manipuri 12. Marathi
13. Maithili 2. 14. Nepali 15. Oriya
16. Punjabi 17. Sanskrit 18. Santhali
3. 19. Sindhi 4. 20. Tamil 5. 21. Telugu
22. Urdu 6. 7.
ABREVATIONS