Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.

Plot No. A-46, Chakan Indl Area, Phase-II Chakan MIDC.


Village Vasuli, Tal KhedPune-410501
GST NO.:27AANCS0767N1ZM
PAN NO.: AANCS0767N

Quotation
Company Name: MARIYAN PLAST Date: 20-10-2021
Address: 12/612,MARIYAN PLAST, NEAR KOTTEKKULAM TEMPLE , Quote No: QT-974/2021-2022 - A
MELARCODE,PALAKKAD,KERALA,
PALAKKAD,KERALA,678703
Email: lintopalakkad@gmail.com Cust. GST No.:
32DQPPA4882J1ZK
Contact No.: 9446641810 Cust. PAN No.:
Kind Attention: LINTO Modification Date: 20-10-2021
Comments: TRANSPORTATION CHARGES WIL BE ON TO PAY BASIS AND THE TRANSPORTATION COST WILL BE INTIMATED DURING
DISPATCH
Unit Price Amount
Sr.No Description HSN Code Qty Discount
(INR) (INR)

1 STANDARD HOPPER DRYER SHD-50 84779000 48,563 1 5,828 42,735

Subtotal 42,735

Packing Charges 1,283

Insurance 133
(0.30%)

IGST 18% 7,947

Account Holder: Shini Plastics Technologies India Pvt. Ltd.


BANK NAME : HDFC BANK LTD, ADDRESS : Savardari, Post-Vasuli, Taluka Khed, Dist Pune, Maharashtra
410501.
A/c. no. 50200034176939,
BRANCH: AT Savardari, Post Vasuli,
BRANCH CODE : 003543,
RTGS/IFSC CODE: HDFC0003543, MICR CODE: 411240506,

( INR Fifty Two Thousand Ninty Eight Only) TOTAL 52,098

N. B. GOODS ONCE SOLD WILL NOT BE TAKEN BACK.

Note
1. Delivery: The delivery period is 2 weeks with respect to date of receipt of advance. Any amendment to your
order will be followed by a revised delivery schedule as per the requirement.

Tel:- +91 02135660 600 | E-mail:- sales@shiniindia.com | Website: www.shiniindia.com ERP 2019 - www.3iosales.com
SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.
Plot No. A-46, Chakan Indl Area, Phase-II Chakan MIDC.
Village Vasuli, Tal KhedPune-410501
GST NO.:27AANCS0767N1ZM
PAN NO.: AANCS0767N

2. Payment Terms: 40% advance along with order and balance 60% before dispatch.

3. Freight: Arranged by Shini and billed to customer

Terms

1. Basic Price Prices quoted are Ex-Works Pune Factory.


2. Warranty: The warranty period is 12 months for workmanship from the date of installation. We undertake to repair or replace
at our option, free of cost ex-works, component found with manufacturing defects and brought to our notice within a period of
12 months from the date of installation, provided the defect is only due to bad workmanship or faulty raw materials and not
due to damage during transit, bad storage, misuse of equipment and normal wear and tear. Replaced parts will become our
property. We stand no guarantee for the failure of any electrical or electronic component, due to bad electrical supply in the
form of over voltage, under voltage, spikes inflow of current, single phasing, loose connections, short circuit, etc.
3. Change of Specification: Change of Specification We reserve the right to change/modify the specifications, which would be
necessary during the course of design and development or for improvements.
4. Inspection Trial: Inspection Trial run and inspection shall be conducted at our works as per ‘Acceptance criteria and trial of
the machine. Acceptance of goods will be on the basis of this inspection at our works, unless otherwise specified and a
dispatch clearance to be given by you
5. Validity: 30 days
6. Company Details: PAN : AANCS0767N CIN No : U29253MH2009PTC19522 GSTN No. : 27AANCS0767N1ZM For Shini Plastics
Technologies (India) Pvt Ltd.
7. GENERAL TERMS & CONDITIONS OF SALES CONTRACT: Our acknowledgement and acceptance of order are subject to the
following conditions.
8. ORDER AMENDMENT: If the buyer makes amendment of the items after seven (7) days of order confirmation, extra 3% of the
basic price of amended (new) items will be imposed automatically for each unit as a compensation for the seller’s loss
cause due to order amendment.
9. ORDER CANCELLATION: Order once placed & acknowledge, Cancellation of the order will be imposed automatically for each
unit as a compensation for seller’s loss caused due to order cancellation. The cancellation charges imposed are as
follows,
10. DELIVERY: The delivery terms are extended automatically; Non-Compliance of Agreed Payment terms as per Contract. In case
of delay or failure in providing Buyer’s Technical Specifications necessary to seller to produce the equipment, parts or
service. In case of change in products OR specifications requested from the buyer after the order confirmation from both the
parties. The buyer should give Dispatch Instructions to the seller within Two (2) Weeks after receiving the confirmation from
the seller that the order is ready for dispatch. Otherwise 15% of the total order value will be imposed automatically as a
compensation for the seller’s loss caused by postpone delivery, as this will require the seller to conduct the test on each
equipments prior to dispatch again. If no further information is provided by buyer, the order will consider as Cancel & 20% of
basic order value will be charged as cancellation. The seller is not obliged to accept the product returns, unless otherwise
agreed in writing from the seller. Any cost arising therefore shall be at the cost of Buyer. Deliver period commences only after
the compliance of payment term as per agreed contract.
11. PAYMENT: The payment of Net Invoice Price has to pay in full & free from any reductions from the buyer in accordance with
Proforma Invoice & Invoice. Also in case of notification of faults & defects, the payment will in no case be suspended or
delayed in accordance to payment terms. The product ownership is handed over to the Buyer only with 100% of the invoice
been made to the Seller. In case of non-payment, the Seller has the rights to claim the ownership of the products & rights for
the product return.
12. INSPECTION: The Cargo receiver is liable for counting & reporting Short Shipment, misshipment to Shini Plastics Technologies
within Two (2) Days after shipment by air OR international courier is received. After the deadline Shini has the rights to deny

Tel:- +91 02135660 600 | E-mail:- sales@shiniindia.com | Website: www.shiniindia.com ERP 2019 - www.3iosales.com
SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.
Plot No. A-46, Chakan Indl Area, Phase-II Chakan MIDC.
Village Vasuli, Tal KhedPune-410501
GST NO.:27AANCS0767N1ZM
PAN NO.: AANCS0767N

any shipment/cargo discrepancy.


13. WARRANTY TERMS: During the warranty period if the components OR parts are proven faulty OR of substandard quality, the
buyer should immediately submit a warranty claim to the seller. The warranty claim should contain Model Type/s & Serial
number of the Equipment/s as well as description of the fault OR defectiveness. Upon receipt of warranty claim, the Seller
should send the replaced parts to the Buyer. If the service is available in the circumstances, the following policy will apply.
The service should be taken from the certified servicemen. Seller is not responsible for any Labor Costs incur in respect to
service. The replaced equipment/s OR part/s pending on site are requested to dispose OR return to the seller. Without limiting
the generality of the foregoing, the seller is not bound to service the equipments where, The equipment is subject to misuse,
negligence, accidental damage. The equipment is modified OR repaired without the approval of the Seller. The seller’s
name plate has been defaced OR removed from the equipment/s. The seller is not responsible for any cost for any labor,
transportation, accommodation incur during the after sales service. Under warranty obligation, the seller will commit
repairing OR replacing the defective parts within the limits of these terms without any further refunding deriving from direct
OR indirect damage to the Buyer OR any third party due to product damage. If the Buyer requires the repair to be carried out
at Buyer’s location, the buyer will pay for the travel expenses, accommodation for the service staff & will provide with all
equipment & staff needed in order to perform the service.
14. Seller reserves the rights: Seller reserves the right to change the method of service provided to the Buyer. Service may be
limited to the options available in the country where buyers will request service. Service options, part availability & response
time may vary according to Country / Location. If the service is not available for the covered equipment in a Country /
Location, the Buyer may be responsible for shipping & handling charges to facilitate service.
15. FORCE MAJEURE: Neither party is in default hereunder by reason of its delay in the performance of OR failure to perform any
of its obligations herein if such delay OR failure is caused by Fire, War, Act of God, Earthquake, Closure of transit routes,
Strikes, Industrial Disputes, The public enemy, Riots, Compliance with government regulations OR other circumstances
beyond its control.
16. Arbitration: All disputes arising out of OR in connection with the present contract shall be finally settled under the rules of
Indian Chamber of Commerce by one or more arbitrators appointed in accordance with the said Rules in INDIA.
17. JURISDICTION: Jurisdiction will be MUMBAI.
18. DEFINITIONS: Orders defining as obligations & rights between The Seller & the Buyer for the supply of Goods & Service.
Proforma Invoice must sign by Buyer & accepted by the Seller with authorizing signature by Buyer & Seller.

Technical Annexure :

1. STANDARD HOPPER DRYER SHD-50

Tel:- +91 02135660 600 | E-mail:- sales@shiniindia.com | Website: www.shiniindia.com ERP 2019 - www.3iosales.com
SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.
Plot No. A-46, Chakan Indl Area, Phase-II Chakan MIDC.
Village Vasuli, Tal KhedPune-410501
GST NO.:27AANCS0767N1ZM
PAN NO.: AANCS0767N

Features:

1. Adopt hot air diffuser to keep plastics dry and temperature stable, thus improves drying efficiency.

2. Hot air inlet curved design can prevent dust piling up at bottom of the pipe heaters so as to avoid burning.

3. Component inside the hopper and in the wall of it are made of stainless steel to protect materials from contamination.

4. Hopper separated from its base, ensuring convenient cleaning.

5. Max. drying temperature 160°C.

6. Proportional deviation display thermostat for accurate temperature control.

7. Overheat tripping can automatically cut off power when drying temperature exceeds set deviation value.

8. Adopts heat insulated blower to prolong blower lifespan.

9. All series models adopt PCB controller for convenient operation.

Specifications:

Heater (kW): 3.9

Blower(kW): 0.12

Loading Capacity (Kg): 50

Net Weight (Kg): 45

Power: 3 ᶲ , 230/400/460/575VAC, 50/60Hz

Tel:- +91 02135660 600 | E-mail:- sales@shiniindia.com | Website: www.shiniindia.com ERP 2019 - www.3iosales.com
SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.
Plot No. A-46, Chakan Indl Area, Phase-II Chakan MIDC.
Village Vasuli, Tal KhedPune-410501
GST NO.:27AANCS0767N1ZM
PAN NO.: AANCS0767N

E. & O.E
Prepared By,
Arun prasad
(7410021689)
(saleschennai@shiniindia.com)
For SHINI PLASTICS TECHNOLOGIES INDIA PVT. LTD.

Tel:- +91 02135660 600 | E-mail:- sales@shiniindia.com | Website: www.shiniindia.com ERP 2019 - www.3iosales.com

You might also like