Professional Documents
Culture Documents
2 - (Day 3) PUB Tuas Nexus
2 - (Day 3) PUB Tuas Nexus
2 - (Day 3) PUB Tuas Nexus
Agenda
▪ Deep Tunnel Sewerage System (DTSS) Phase 2
▪ Tuas Water Reclamation Plant (TWRP)
▪ Tuas Nexus
2027
DTSS 2 tunnel (3.3m diameter, ~50m depth) Tuas Nexus Admin Building
2
2027
& IWMF
5
NEWater
▪ TWRP will treat 2 distinct used water streams, which are conveyed separately, as well as greasy waste delivered by tankers.
▪ TWRP’s initial treatment capacity: 176 MGD (800,000 m3/day) - largest Membrane Bioreactor (MBR) facility in the world
when completed, but with a 30% more compact footprint compared to conventional plants.
6
❷
3. Biosolids Treatment Facility
❺ 4. NEWater and Industrial Water
Storage and Pumping
5. Wet Weather Treatment
❹ 6. Admin/O&M Building
❸
❻
7
Tuas Nexus
• To leverage the water-energy-waste nexus
• First of its kind planned from the ground up (greenfield project)
• Energy-self-sufficient
9
Tuas Nexus
1 + 1 > 2?
Would a single integrated entity bring greater
benefits to Singapore than two stand-alone facilities?
Yes!
10
Energy
» Biogas from TWRP to IWMF
○ for higher overall plant thermal efficiency at IWMF
» Power supply from IWMF to TWRP
» Steam from IWMF to TWRP
○ for sludge thermal hydrolysis and greasy waste treatment
Water
» Water from TWRP to IWMF for process use
» Dryer condensate from IWMF to TWRP for treatment Leverage on the Water-Energy-Waste Nexus
(by-product of one facility as resource for another)
11
Synergies
12
Conclusion
▪ DTSS Phase 2, including TWRP, is a key long-term infrastructure to meet
Singapore’s water needs.
▪ Coupling of TWRP and IWMF to form the Tuas Nexus on this scale is unique and
showcases the value of a circular economy.
▪ The Tuas Nexus extracts the maximum value for the benefit of Singapore, bringing Tuas Nexus Video
further efficiencies in land, energy and resource recovery. (On Youtube)
13
THANK YOU