POLYCOM in 10 steps

KIH 620, 04.03.2011

ThyssenKrupp Industrial Solutions


Titel des Vortrags Änderungen und Richtlinien
Datum 24.11.2010
Anlass, Referent Vorstellung des neuen Layout
1 Polysius
Step 1:
• Installation of base frame and
dismantling device, alignment and
grouting
• Preparation of measuring protocol

Page 1
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 2:
• Installation of pressure absorption beams
and hydraulic cylinders

Page 2
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 3:
• Installation of floating roll unit
and backward travel cylinders

Page 3
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 4:
• Installation of fixed roller unit

Page 4
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 5:
• Installation of upper frame beams
and crossbeams

Page 5
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 6:
• Adjustment and installation of the
locking keys
• Installation of accumulators
• Installation of hydraulics, oil supply and
central greasing system

Page 6
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 7:
• Installation of gear boxes, cardan
shafts, motors, torque stay arm and
auxiliary drive

Page 7
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 8:
• Installation of feed material guide
and adjustable feed shaft

Page 8
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 9:
• Installation of hopper

Page 9
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 10:
• Installation of cardan shaft cover, service
platform and service access door
• Installation of weighing cells for feed
hopper and level control
• Finishing works
• Electrical installation

Page 10
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions

You might also like