This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 2:
• Installation of pressure absorption beams
and hydraulic cylinders
Page 2
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 3:
• Installation of floating roll unit
and backward travel cylinders
Page 3
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 4:
• Installation of fixed roller unit
Page 4
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 5:
• Installation of upper frame beams
and crossbeams
Page 5
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 6:
• Adjustment and installation of the
locking keys
• Installation of accumulators
• Installation of hydraulics, oil supply and
central greasing system
Page 6
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 7:
• Installation of gear boxes, cardan
shafts, motors, torque stay arm and
auxiliary drive
Page 7
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 8:
• Installation of feed material guide
and adjustable feed shaft
Page 8
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 9:
• Installation of hopper
Page 9
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions
Step 10:
• Installation of cardan shaft cover, service
platform and service access door
• Installation of weighing cells for feed
hopper and level control
• Finishing works
• Electrical installation
Page 10
This document contains a general and rough description of erection activity (in particular for the use of contractors who are
inexperienced on the cement plant construction sector).
The document does not reflect the details/circumstances of specific projects. ThyssenKrupp Industrial Solutions