The third Saudi expansion project for the Grand Mosque and its related elements
Security and Safety Department

March 2018 General risk assessment

the page Title How the number

3
to assess risks Excavation
4 1
works Demolition

6 2
works and concrete cutting Work at
8 3
heights Use of stairs Hot
9 4
works Temporary
11 5
electrical connections

12 6
Manual and electrical tools Manual lifting

13 7
works Concrete casting works

14 8
Closed spaces Road works
15 Use of vehicles and equipment 9

17 Scaffolding 10

18 11

20 12

22 13

24 14
Lifting works,
26 15
temporary service buildings,
28 16
equipment for tunnel works,

29 iron erection, 17

31 18
construction works and bridge equipment,

32 vehicle maintenance, 19

33 20
fire prevention, working

36 21
in different weather conditions, incorrect

37 behaviour, temporary 22

38 warehouses, 23

39 chemical materials 24