LIST OF TESTING CONCRETE COMPRESSIVE STRENGTH

Project: QUANG TRACH I THERMAL POWER PLANT PROJECT


EPC CONTRACTOR: CONSTRUCTION CORPORATION NO.1 - JSC
SUPPLIER MEKONG BATCHING PLANT Date casting of R3: 1/Apr/2024
DATE TESTING: 4/Apr/2024 Date casting of R7: 28/Mar/2024 Date casting of R28: 7/Mar/2024

Average
Date of Concrete Quantity of Age of
No. Item Description Sub-con Loading 1 Loading 2 Loading 3 compressive Remark
Casting Class (Mpa) samples Samples
strength

1 1-Apr-2024 C40 Type II (16±2) 1.0 Trestle Pier PSC Beam 02 (No.61) Phu Xuan R3

2 28-Mar-2024 C40 Type II (16±2) 1.0 Trestle Pier PSC Beam 02 (No.58) Phu Xuan R7

3 7-Mar-2024 C40 Type II (16±2) 1.0 Trestle Pier PSC Beam 02 (No.44) Phu Xuan R28

4 7-Mar-2024 C35 Type II (18±2) 1.0 Trestle Pier Bored pile no: P82, P83, P84 Phu Xuan R28

Supplier Laboratory staff EPC Contractor Consultant


LIST OF TESTING CONCRETE COMPRESSIVE STRENGTH
Project: QUANG TRACH I THERMAL POWER PLANT PROJECT
EPC CONTRACTOR: CONSTRUCTION CORPORATION NO.1 - JSC
SUPPLIER: MEKONG BATCHING PLANT Date casting of R7: 28/Mar/2024 Date casting of R28: 7/Mar/2024
DATE TESTING: 04/04/2024 Quantity sample 10 6

Average
Date of Concrete Quantity of Age of
No. Item Description Sub-con Loading 1 Loading 2 Loading 3 compressive Remark
Casting Class (Mpa) samples Samples
strength
Concrete work for Electrical Duct Bank & Manhole
Electrical Duct Bank &
1 28-Mar-2024 C21 Type II (12+/-2) 1,0 - Walls EL:+2.450 - EL:+5.000m of Manhole R0-MH007 Khang Duc R7
Manhole
- Walls EL:+2.450 - EL:+5.000m of Manhole R0-MH008
Lean concrete - U Ditch Structure - Type 1 - 30m, Axis(D/3-4) (Southside - part 3) - Coal
2 28-Mar-2024 C13 Type II (12+/-2) 1,0 Coal Stockpile Yard TTNS R7
Stockpile Yard
Concrete work - C2 (4nos) of F2 FDN Axis (2-4/M-N) up to EL+15.400 (phase 2 - part 1) -
3 28-Mar-2024 C24 Type II (12+/-2) 1,0 Dry Coal Shed TTNS R7
Dry Coal Shed

500KV EHV Line Gantry "Pile head treatment - 500KV EHV Line Gantry Tower & Electrical Miscellaneous
4 28-Mar-2024 C30 Type II (12+/-2) 1,0 Tower & Electrical Foundation #2: Tri Nhan R7
Miscellaneous Foundation #2 + F2c, F2d"

concrete work ESP/FGD Control & Ash Pump Control Building :


ESP/FGD Control & Ash
5 28-Mar-2024 C30 Type II (12+/-2) 1,0 - Control Building slab ,Gs2 axis (A)/ (2-3),EL +5.050m ~ +5.250m. Khang Duc R7
Pump Control Building
- Control Building slab Cs1 axis (3)/ ( +3.000m+A)-(D), EL +5.250m ~ +5.00m.
Structual concrete - U Ditch Structure - Type 1 - 30m, Axis(D/1-2) (Northside-part 1) - Coal
6 28-Mar-2024 C30 Type II (12+/-2) 1,0 Coal Stockpile Yard TTNS R7
Stockpile Yard
7 28-Mar-2024 C13 Type II (12+/-2) 1,0 Coal Stockpile Yard Lean concrete - U Ditch Structure - Type 1 - 30m, Axis(A/2-3) (part 2) - Coal Stockpile Yard TTNS R7

"Wall - CW Intake Pump Structure


8 28-Mar-2024 C30 Type II (12+/-2) 2,0 CW Intake Pump Structure Tri Nhan-Pump R7
+ W-4, W-12.1, W-13.1: EL. -5.63m ~ -1.40m"
Concrete work - C2 (4nos) of F2 FDN Axis (2-4/Q-R) up to EL+15.400 (phase 2 - part 1) -
9 28-Mar-2024 C24 Type II (12+/-2) 1,0 Dry Coal Shed TTNS R7
Dry Coal Shed
Concrete work - C2 (4nos) of F2 FDN Axis (2-4/I-L) up to EL+21.450 (phase 3 - part 1) -
10 28-Mar-2024 C24 Type II (12+/-2) 1,0 Dry Coal Shed TTNS R7
Dry Coal Shed
Turbine house #2:
11 7-Mar-2024 C30 Type II (12+/-2) 1,0 Turbine house #2 Tri Nhan R28
+ Equipment foundation: 6A, 6B, 15, 27
12 7-Mar-2024 C30 Type II (12+/-2) 1,0 Dry Coal Shed Pile head treatment - F1 FDN Axis (5/I-L) - Dry Coal Shed TTNS R28
Electrical Duct Bank & Concrete work for Electrical Duct Bank & Manhole:
13 7-Mar-2024 C21 Type II (12+/-2) 1,0 Khang Duc R28
Manhole - Top Slab EL:+5.000m - EL:+5.250m of Manhole R0-MH001
Electrical Duct Bank & Concrete work for Electrical Duct Bank & Manhole:
14 7-Mar-2024 C21 Type II (12+/-2) 1,0 Khang Duc R28
Manhole - Top Slab EL:+5.000m - EL:+5.250m of Manhole R0-MH002
15 7-Mar-2024 C24 Type II (12+/-2) 1,0 Dry Coal Shed Concrete work- C2 Pedestal of F2 FDN Axis (2/A-H) - Dry Coal Shed (phase 2 - part 1) TTNS R28

16 7-Mar-2024 C13 Type II (12+/-2) 1,0 Dry Coal Shed Lean concrete - F1 FDN Axis (5/Q-T) - Dry Coal Shed TTNS R28

Supplier Laboratory staff EPC Contractor Consultant