Attention : Mr. Ubaithullah FIRST ARAB Company, Dammam, KSA
Project at : Workshop, Dammam
Scope of work: Sand Blasting and Eppoxy Coating WORK Dear Sir, With reference to your RFQ on 04-Aprl-2024 regarding to above subject. We are pleased to submit our lowest price for your consideration and approval. الرقم الصف الكمية سعر اجمال المبلغ ي No Description Qty UNIT Unit Price Total Amount 1 SAND BLASTING OF RCC FLOOR: SPERRY MEGA LAB AND WALK WAY 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 340 M2 9 3,060.00 2) Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 14,960.00 2 SAND BLASTING OF RCC FLOOR: I CRUISE WORKSHOP AND FCM 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 898 M2 9 8,082.00 2)Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 39,512.00 3 SAND BLASTING OF RCC FLOOR: MWD WORKSHOP 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 864 M2 9 7,776.00 2)Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 38,016.00 4 SAND BLASTING OF RCC FLOOR:MWD TRAIGE 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 558 M2 9 5,022.00 2)Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 24,552.00 5 SAND BALSTING OF RCC FLOOR:RESISTIVITY WORKSHOP 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 296 M2 9 2,664.00 2)Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 13,024.00 SAND BLASTING OF RCC FLOOR:DIRECTIONAL DRILLING MUD MOTOR 6 SHOP 1) Secure work area with covered Canopy 6Mtr x 6Mtr. 400 M2 9 3,600.00 2)Sandblasting of the RCC floor for removal of epoxy coating 3) Supply and Apply Eppoxy Coating M2 44 17,600.00 جمال ي المبلغ اال 177,868 TOTAL AMOUNT(SR) Discount خصم 1,100 15% ضيبةر 26,515 VAT 15% اجمال المبلغ المدفوع ي 203,283 NET AMOUNT (SR) In Words: SAUDI RIYAL Two hundred three thousand and two hundred eight three only Note: Client should provide permit, safety aand quality coverage if required. Munifa will provide mapower, materials and machineries. Terms of Payment: 01) 50% Advance payment shall be cleared after signing the Agreement. 02) 30% Payment on progress. 03) 10% balance payment shall be cleared on completion. Thanks & Best Regards
Mahbubul Hoque Project Manager Mobile # 0509929160