DATE : 01 February, 2024 QUOTE No.

: YGL2024-0201-WD
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Concreting Works
Dimension : NIL
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,
We would like to submit our quotation amounting to TWENTY SEVEN THOUSAND FIVE HUNDRED
TWELVE KINA AND THIRTY TOEA (K27,512.30) GST Inclusive for following scope of works to be Supplied
and Installed:

TOTAL
SCOPE OF WORKS QTY UNIT
AMOUNT
Concreting Work
Floor Concreting (13200 mm x 8300 mm) 21,919.53
Formworks
50 mm x 50 mm DAR 27.45 ln mtr
18 mm Black Plywood 1.55 pc/s
Rebars
Visquen 126.95 sq mtr
Rebars y12 396.67 ln mtr
F82 110.39 sq mtr
Tie wire #16 3.53 kgs
Concreting
Ready Mix (25 mpa) 14.24 cu mtr

Gate Concreting (4850 mm x 2800 mm) 3,091.65


Formworks
50 mm x 50 mm DAR 9.72 ln mtr
18 mm Black Plywood 0.53 pc/s
Rebars
Visquen 15.62 sq mtr
Rebars y12 45.27 ln mtr
F82 13.58 sq mtr
Tie wire #16 0.40 kgs
Concreting
Ready Mix (25 mpa) 2.04 cu mtr

742264190.xlsx Page 1
TOTAL AMOUNT EXCLUDING GST 25,011.18
GST 10% 2,501.12

NET AMOUNT (GST INCLUSIVE) 27,512.30

TERMS & CONDITIONS:


a). FULL PAYMENT is required prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

_____________________________ _______________________________
MR. WARREN J. DIWA MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager

742264190.xlsx Page 2
DATE : 03 February, 2024 QUOTE No.: YGL2024-0203-WD-A
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Veranda Enclosure
Dimension : NIL
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,

We would like to submit our quotation amounting to TWENTY NINE THOUSAND SEVEN HUNDRED THIRTY-TWO KINA AND TEN TOEA (K29,732.10) GST Inclusive for
following scope of works to be Supplied and Installed:

DETAILED TOTAL
SCOPE OF WORKS QTY UNIT UNIT COST MC MU LC
COST AMOUNT
VERANDA ENCLOSURE 27,029.18
Framing 40.6 ln mtr 18.75 761.25 90% 685.12 1,446.37
Fixed Glass 6.40 sq mtr 410.00 2,624.00 90% 2,361.60 4,985.60
Sliding Window 15.36 sq mtr 410.00 6,297.60 90% 5,667.84 11,965.44
Metal Tracks (90 mm) 8.53 pc/s 40.00 341.33 90% 307.20 648.53
Metal Studs (90 mm) 17.07 pc/s 46.00 785.07 90% 706.56 1,491.63
50 mm Main metal studs 10.90 pc/s 22.50 245.33 90% 220.80 466.13
Harderware for Partition 34.13 pc/s 1.75 59.73 90% 53.76 113.49
Aluminum Film 1.2 x 40 mtrs 0.37 roll/s 225.00 84.00 90% 75.60 159.60
Cement Board (360 mm) 5.33 pc/s 26.50 141.33 90% 127.20 268.53
Hardiplank/Weatherboard (3 mtrs) 29.87 pc/s 21.00 627.20 90% 564.48 1,191.68
Weatherboard Clip 149.33 pc/s 1.00 149.33 90% 134.40 283.73
PVC Joiner 29.87 pc/s 1.33 39.65 90% 35.69 75.34
Aluminum Corner Joint 14.00 pc/s 7.50 105.00 90% 94.50 199.50
Screws 348.44 pc/s 0.06 20.91 90% 18.82 39.72
12 mm Plasterboard 0.89 pc/s 52.00 46.22 90% 41.60 87.82
9 mm Cement Board 5.33 pc/s 88.00 469.33 90% 422.40 891.73
Silicon Glue 2.07 tube/s 24.10 49.99 90% 44.99 94.98
Painting 1.00 lot 625.00 625.00 90% 562.50 1,187.50
Skirting (100 mm) 12.80 ln mtr 12.00 153.60 90% 138.24 291.84
Scaffolding 6.00 set 100.00 600.00 90% 540.00 1,140.00

TOTAL AMOUNT EXCLUDING GST 14,225.88 12,803.30 27,029.18 27,029.18


GST 10% 1,422.59 1,280.33 2,702.92 2,702.92

NET AMOUNT (GST INCLUSIVE) 15,648.47 14,083.62 29,732.10 29,732.10

742264190.xlsx Page 3
TERMS & CONDITIONS:
a). FULL PAYMENT is required prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

_____________________________ _______________________________
MR. WARREN J. DIWA MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager

742264190.xlsx Page 4
DATE : 03 February, 2024 QUOTE No.: YGL2024-0203-WD-C
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Roofing Fence and Entrance
Dimension : NIL
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,

We would like to submit our quotation amounting to FOUR THOUSAND SEVEN HUNDRED FOURTEEN
KINA AND ONE TOEA (K4,714.01) GST Inclusive for following scope of works to be Supplied and Installed:

TOTAL
SCOPE OF WORKS QTY UNIT
AMOUNT
A. Roofing Fence 3,770.02
Roofing Iron 76.50 lnm
Roofing Screws 381.74 pcs
B. Provision of Grill Entrance On Main gate (H1900mm x W900mm w/ frame) 991.61
25mm x 25mm SHS 5.77 lnm
25mm x 50mm RHS 12.34 lnm
Hinges 4.00 pcs
Deadbolt Lock 1.00 pcs
Welding Rod 1.00 box
Painting 1.00 lot

TOTAL AMOUNT EXCLUDING GST 4,761.63


GST 10% 476.16

NET AMOUNT (GST INCLUSIVE) 5,237.79

Less 10% discount 523.78

TOTAL DISCOUNTED AMOUNT 4,714.01

TERMS & CONDITIONS:


a). FULL PAYMENT is required prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

742264190.xlsx Page 5
_____________________________ _______________________________
MR. WARREN J. DIWA MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager

742264190.xlsx Page 6
DATE : 05 February, 2024 QUOTE No.: YGL2024-0205-WD-BD
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Various Works
Dimension : NIL
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,

We would like to submit our quotation amounting to SIXTY THOUSAND EIGHT HUNDRED FIFTY-TWO KINA KINA AND SEVENTY
following scope of works to be Supplied and Installed:

SCOPE OF WORKS QTY UNIT UNIT COST MC

VERANDA ENCLOSURE HOLLOW BOARD


SHS Square tube for Framing 109.00 lm 23.70 2,583.30
Hollow Board 37.12 sqm 56.25 2,088.00
Screw and Nuts 350.00 pcs 0.25 87.50
Painting 1.00 lot 350.00 350.00
Scaffolding 4.00 lot 100.00 400.00
VERANDA U-TYPE CANOPY W/ CURVE ROOF
SHS Square tube for Trusses 179.00 lm 23.70 4,242.30
Curve Roof iron 27.04 lnm 45.00 1,216.90
Roof Screw 550.00 pcs 0.25 137.50
Painting 1.00 lot 350.00 350.00
Scaffolding 8.00 lot 100.00 800.00
VERANDA FLOOR AND LANDING
1/2 Flywood 5.24 pcs 135.00 707.81
Hard Vinyl 15.10 sqm 160.00 2,416.00
Screw and Nuts 150.00 pcs 0.25 37.50
Tile Glue 5.00 pcs 24.00 120.00
FOUNDATION WORKS & CONCRETING
Excavation (W300 mm x D500 mm) 7.5 cu mtr 75.00 564.30
Strip Footing (300 mm x 500 mm x 41.8 mtrs)
Formworks
50 x 50 DAR 250.8 ln mtr 7.50 1,881.00
18 mm Black Plywood 8.7 pc/s 135.00 1,175.63
Nails (Assorted) 4.4 kg/s 8.80 38.32
Rebars
Y16 Main Rebars 280.9 ln mtr 4.05 1,137.63
Y12 Stirrups 334.4 ln mtr 2.62 876.13
Tie Wire 12.5 kg/s 8.00 100.32
Concrete works
Ready Mix (30 mpa) 6.3 cu mtr 740.00 4,639.80
Slab on Fill (100 mm Thickness)
Formworks
50 mm x 50 mm DAR 41.8 ln mtr 7.50 313.50
18 mm Black Plywood 1.5 pc/s 135.00 195.94
Rebars

742264190.xlsx Page 7
Visquen 118.7 sq mtr 1.76 208.88
Rebars y12 344.0 ln mtr 4.05 1,393.79
F82 103.2 sq mtr 29.02 2,994.64
Tie wire #16 10.3 kgs 7.40 76.37
Concreting
Ready Mix (25 mpa) 10.3 cu mtr 740.00 7,636.80
Gate Concreting (4850 mm x 2800 mm)
Formworks
50 mm x 50 mm DAR 9.72 ln mtr 7.50 72.90
18 mm Black Plywood 0.53 pc/s 135.00 71.55
Rebars
Visquen 15.62 sq mtr 1.76 27.49
Rebars y12 45.27 ln mtr 4.05 183.42
F82 13.58 sq mtr 29.02 394.06
Tie wire #16 0.40 kgs 7.40 2.96
Concreting
Ready Mix (25 mpa) 2.04 cu mtr 740.00 1,509.60

TOTAL AMOUNT EXCLUDING GST 41,031.84


GST 10% 4,103.18

NET AMOUNT (GST INCLUSIVE) 45,135.02

Less 10% discount

TOTAL DISCOUNTED AMOUNT

TERMS & CONDITIONS:


a). FULL PAYMENT is required prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

_____________________________ _______________________________
MR. WARREN J. DIWA MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager

742264190.xlsx Page 8
EIGHT HUNDRED FIFTY-TWO KINA KINA AND SEVENTY TOEA ( K60,852.33) GST Inclusive for

DETAILED TOTAL
MU LC
COST AMOUNT
9,005.77
65% 1,679.15 4,262.45
65% 1,357.20 3,445.20
55% 48.13 135.63
55% 192.50 542.50
55% 220.00 620.00

65% 2,757.50 6,999.80 11,003.31


65% 790.99 2,007.89
55% 75.63 213.13
55% 192.50 542.50
55% 440.00 1,240.00
5,414.17
65% 460.08 1,167.89
65% 1,570.40 3,986.40
65% 24.38 61.88
65% 78.00 198.00

100% 564.30 1,128.60 1,128.60


14,105.72

55% 1,034.55 2,915.55


55% 646.59 1,822.22
55% 21.07 59.39

55% 625.70 1,763.32


55% 481.87 1,358.00
55% 55.18 155.50

30% 1,391.94 6,031.74


17,717.79

50% 156.75 470.25


50% 97.97 293.91

742264190.xlsx Page 9
50% 104.44 313.32
50% 696.90 2,090.69
50% 1,497.32 4,491.96
70% 53.46 129.83

30% 2,291.04 9,927.84


3,091.65

50% 36.45 109.35


50% 35.78 107.32

50% 13.75 41.24


50% 91.71 275.13
50% 197.03 591.09
70% 2.07 5.03

30% 452.88 1,962.48

20,435.17 61,467.00 61,467.00


2,043.52 6,146.70 6,146.70
22,478.68 67,613.70 67,613.70

6,761.37

60,852.33

ard to meet your requrements.

742264190.xlsx Page 10
DATE : 12 March, 2024 QUOTE No.: YGL2024-312-D
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Supply and Construction of Store
Dimension : L 7000mm x W3800mm
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,
We would like to submit our quotation amounting to EIGHTY SIX THOUSAND TWO HUNDRED THIRTY
THREE KINA AND EIGHTY ONE TOEA (K86,233.81) GST Inclusive for following scope of works to be
Supplied and Installed:

SCOPE OF WORKS QTY UNIT TOTAL AMOUNT

REMOVAL OF EXIST. SPIKE FENCE AND ROOFING IRON 1.0 lot 550.00

FOUNDATION WORKS , CONCRETING AND BRICKS


Excavation 1.7 cu mtr 569.53
Pad Footing (5 pcs x 600 mm x 600 mm x D600mm ) 3,523.71
Formworks
50 x 50 DAR 32.9 ln mtr
18 mm Black Plywood 3.6 pc/s
Nails (Assorted) 4.4 kg/s
Visquen Plastic 15.8 kg/s
Rebars
Y16 Main Rebars 96.0 ln mtr
Tie Wire 2.4 kg/s
Concrete works
Ready Mix (30 mpa) 1.1 cu mtr
Front Store Flooring-External (100 mm Thickness x 4500mm x 2500mm) 2,255.78
Formworks
50 mm x 50 mm DAR 8.9 ln mtr
18 mm Black Plywood 0.5 pc/s
Rebars
Visquen 12.9 sq mtr
Rebars y12 45.0 ln mtr
F82 11.3 sq mtr
Tie wire #16 0.4 kgs
Concreting
Ready Mix (25 mpa) 1.2 cu mtr
Store Flooring- Internal (130 mm Thickness) 5,749.14
Formworks
50 mm x 50 mm DAR 13.7 ln mtr
18 mm Black Plywood 0.8 pc/s
Rebars
Visquen 30.6 sq mtr
Rebars y12 106.4 ln mtr

742264190.xlsx Page 11
F82 26.6 sq mtr
Tie wire #16 1.0 kgs
Concreting
Ready Mix (25 mpa) 3.5 cu mtr

STRUCTURAL STEEL ,TRUSSES & WELDING WORKS 11,017.13


Embedded Parts 20.00 pcs
Base Plate 5.00 pcs
100mm x 100mm SHS Column 18.00 ln mtrs
Roof Beams 100mm x 100mm SHS 14.00 ln mtrs
100mm X 50mm RHS for Roof Frame 58.63 ln mtrs
50mm x 25mm RHS for Roof Frame 28.00 ln mtrs
Angle Plate 40 mm 3.0 pc/s
Welding Rods 30.00 packet
Epoxy Primer Gray Paint 37.3 sq mtr

ROOFING 8,019.29
Chicken Wire 33.1 sq mtr
Sisalation 33.1 sq mtr
Roofing Iron Curve Roof 47.7 ln mtr
Flashing 16.5 ln mtr
Roofing Screws 238.3 ln mtr

CARPENTRY WORKS 20,766.03


PERIMETER AND PARTITION WALL
Metal Tracks (90 mm) 25.0 pc/s
Metal Studs (90 mm) 78.1 pc/s
50 mm Main metal studs 39.1 pc/s
Aluminum Film 1.2 x 40 mtrs 1.0 roll/s
Screws 966.0 pc/s
9 mm Cement Board External and Internal 43.0 pc/s
Silicon Glue 9.2 tube/s
Skirting (100 mm) 50.0 ln mtr
CEILING INTERNAL ONLY
Buckle Metal Studs for Ceiling 22.9 pc/s
Steel Edge Slot for Ceiling 7.5 pc/s
Vice Metal Studs for Ceiling 22.2 pc/s
50 mm Metal Studs Joint 22.2 pc/s
Suspension Rod for Ceiling 3.7 ln mtr
Checking Manhole 2.0 sets
8 mm Screw Nut 74.0 pc/s
PVC Slot Edge 5.5 pc/s
PVC Ceiling Board 88.7 ln mtr
Self Drilling Screws 393.7 pc/s

FLOOR FINISHES 3,180.63


600 mm x 600 mm Floor Tiles 26.6 sq mtr
Tile Glue 5.3 bag/s
Tile Spacer 0.6 pkt/s
Tile Grout 5.3 kg/s

DOORS, WINDOWS & GRILLS 9,673.85


Stainless Steel Door 2.0 pc/s
Window Frame 14.4 ln mtr

742264190.xlsx Page 12
Sliding Window 4.3 sq mtr
Grill Window 2.9 sq mtr
Store Front Grills 25mm x 25mm SHS 1.2 ln mtr
Amplimesh Grill (Aluminum) W 1000 x H 1200 1.2 sq mtr

ELECTRICAL WORKS 6,991.72


4mm² Flat TPS 2C + E 9.1 ln mtr
2.5mm² Flat TPS 2C + E 51.9 ln mtr
1.5mm² Flat TPS 2C + E 51.9 ln mtr
1.5mm² Twin Active 38.9 ln mtr
Conduit Pipe 20 mm 34.6 ln mtr
Conduit Pipe Fittings 11.5 pc/s
Lights 3.0 set/s
Switch & Concealed Box 3.0 set/s
GPO & Concealed Box 6.0 set/s
Ceiling Fan 2.0 set/s
Main Distribution Board (MDB) 1.0 set/s
Consumables (Ground Rod, Earth Wire, Electrical Tape) 1.0 lot/s

PAINTING WORKS 149.64 sq mtr 6,097.57


Estopping Materials 19.95 ltr/s
Corner Angle 16.63 pc/s
Gap Sealer 7.48 tube/s
Sandpaper # 80 50.27 pc/s
Undercoat/Primecoat 14.96 ltr/s
Sandpaper # 120 45.24 pc/s
First Coat (Oil/Acrylic Paint) 13.47 ltr/s
Sandpaper # 180 & 240 40.72 pc/s
Final Coat (Oil/Acrylic Paint) 12.12 ltr/s

TOTAL AMOUNT EXCLUDING GST 78,394.37


GST 10% 7,839.44

NET AMOUNT (GST INCLUSIVE) 86,233.81

TERMS & CONDITIONS:


a). FULL PAYMENT is required or to be discussed prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

_____________________________ _______________________________
MR. ARNEL TORRES (727-09373) MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager

742264190.xlsx Page 13
DATE : 03 April, 2024 QUOTE No.: YGL2024-0403-W
Attention : MR. TIMOTHY TIKIPIYE
Subject : QUOTATION for Supply and Construction of Store
Dimension : L 7000mm x W3800mm
Location : Sec 147 lot 108 , Grand Eden (7 Mile), Bomana, City of POM

Dear Sir,
We would like to submit our quotation amounting to SEVENTY THREE THOUSAND SEVEN HUNDRED
NINETY-ONE KINA AND TWENTY-TWO TOEA (K73,791.22) GST Inclusive for following scope of works to
be Supplied and Installed:

SCOPE OF WORKS QTY UNIT TOTAL AMOUNT

REMOVAL OF EXIST. SPIKE FENCE AND ROOFING IRON 1.0 lot 550.00

FOUNDATION WORKS , CONCRETING AND BRICKS


Store Flooring- Internal (100 mm Thickness) 4,981.47
Formworks
50 mm x 50 mm DAR 13.7 ln mtr
18 mm Black Plywood 0.8 pc/s
Rebars
Visquen 30.6 sq mtr
Rebars y12 106.4 ln mtr
F82 26.6 sq mtr
Tie wire #16 1.0 kgs
Concreting
Ready Mix (25 mpa) 2.7 cu mtr

STRUCTURAL STEEL ,TRUSSES & WELDING WORKS 6,822.38


100mm X 50mm RHS for Roof Frame 58.63 ln mtrs
50mm x 25mm RHS for Roof Frame 28.00 ln mtrs
Angle Plate 40 mm 3.0 pc/s
Welding Rods 30.00 packet
Epoxy Primer Gray Paint 37.3 sq mtr

ROOFING 8,019.29
Chicken Wire 33.1 sq mtr
Sisalation 33.1 sq mtr

742264190.xlsx Page 14
Roofing Iron Curve Roof 47.7 ln mtr
Flashing 16.5 ln mtr
Roofing Screws 238.3 ln mtr

CARPENTRY WORKS 20,766.03


PERIMETER AND PARTITION WALL
Metal Tracks (90 mm) 25.0 pc/s
Metal Studs (90 mm) 78.1 pc/s
50 mm Main metal studs 39.1 pc/s
Aluminum Film 1.2 x 40 mtrs 1.0 roll/s
Screws 966.0 pc/s
9 mm Cement Board External and Internal 43.0 pc/s
Silicon Glue 9.2 tube/s
Skirting (100 mm) 50.0 ln mtr
CEILING INTERNAL ONLY
Buckle Metal Studs for Ceiling 22.9 pc/s
Steel Edge Slot for Ceiling 7.5 pc/s
Vice Metal Studs for Ceiling 22.2 pc/s
50 mm Metal Studs Joint 22.2 pc/s
Suspension Rod for Ceiling 3.7 ln mtr
Checking Manhole 2.0 sets
8 mm Screw Nut 74.0 pc/s
PVC Slot Edge 5.5 pc/s
PVC Ceiling Board 88.7 ln mtr
Self Drilling Screws 393.7 pc/s

FLOOR FINISHES 3,180.63


600 mm x 600 mm Floor Tiles 26.6 sq mtr
Tile Glue 5.3 bag/s
Tile Spacer 0.6 pkt/s
Tile Grout 5.3 kg/s

DOORS, WINDOWS & GRILLS 9,673.85


Stainless Steel Door 2.0 pc/s
Window Frame 14.4 ln mtr
Sliding Window 4.3 sq mtr
Grill Window 2.9 sq mtr
Store Front Grills 25mm x 25mm SHS 1.2 ln mtr
Amplimesh Grill (Aluminum) W 1000 x H 1200 1.2 sq mtr

ELECTRICAL WORKS 6,991.72


4mm² Flat TPS 2C + E 9.1 ln mtr
2.5mm² Flat TPS 2C + E 51.9 ln mtr
1.5mm² Flat TPS 2C + E 51.9 ln mtr
1.5mm² Twin Active 38.9 ln mtr
Conduit Pipe 20 mm 34.6 ln mtr

742264190.xlsx Page 15
Conduit Pipe Fittings 11.5 pc/s
Lights 3.0 set/s
Switch & Concealed Box 3.0 set/s
GPO & Concealed Box 6.0 set/s
Ceiling Fan 2.0 set/s
Main Distribution Board (MDB) 1.0 set/s
Consumables (Ground Rod, Earth Wire, Electrical Tape) 1.0 lot/s

PAINTING WORKS 149.64 sq mtr 6,097.57


Estopping Materials 19.95 ltr/s
Corner Angle 16.63 pc/s
Gap Sealer 7.48 tube/s
Sandpaper # 80 50.27 pc/s
Undercoat/Primecoat 14.96 ltr/s
Sandpaper # 120 45.24 pc/s
First Coat (Oil/Acrylic Paint) 13.47 ltr/s
Sandpaper # 180 & 240 40.72 pc/s
Final Coat (Oil/Acrylic Paint) 12.12 ltr/s

TOTAL AMOUNT EXCLUDING GST 67,082.93


GST 10% 6,708.29

NET AMOUNT (GST INCLUSIVE) 73,791.22

TERMS & CONDITIONS:


a). FULL PAYMENT is required or to be discussed prior to commence.
b). Works that are ONLY LISTED in this quote will be executed.
c). VALIDITY of this quote is 30 days.

for payment procedures:


ONLINE TRANSFER to YFIG Group Limited-BSP Waigani
BSP Financial/7011135998/BSP Financial/BSB 088-968/Swift Code BOSPPGPM
Kina Bank Limited/6019-6902/BSB 028-111/Swift Code KINIPGPG
WESTPAC Bank Limited/600-8143747/BSB 037-007/Swift Code WPACPGM
CASH or EFTPOS, go to YFIG Office at Kennedy Estate

Thank you for giving us the opportunity to quote and we are looking forward to meet your requrements.

Prepared by: Approved by:

_____________________________ _______________________________
MR. WARREN J. DIWA MR. SUNSON CHEN
YFIG-Quantity Surveyor YFIG-Deputy Manager