Batch Management

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

SAP S4 HANA FINANCE ****

**** atch anagement & atch etermination


Batch Management & Batch Determination
Batch management is generally used in FMCG and pharma companies. It is generally used for
tracking purpose. The definition of batch varies from industry to industry. In some industry,
batch number is assigned for the products produced under one shift. In some industry, batch
number is assigned based on products produced in a day.
Batch management is applicable in the below scenarios
 Receiving raw materials from vendor
 Production of a finished material having batch
 Issue raw material batches in the production
T Code- MSC1N/MSC2N/MSC3N
Batch can be defined at three levels.
Client- same batch number cannot be used again.

Material- Batch must be unique at material+ batch combination. It is preferred because when
we transfer batch from one plant to another plant then there is no need to create separate
batch and also no need to change the specifications of the batch in the destination plant.

Plant- Batch must be unique at material+ Plant+ batch combination. Here , we have to create a
new batch and new specifications in the destination plant.

Batch can be manually/automatically created at the production order creation or release.


Batch can also be assigned during GR activity.

Configurations
T CODE -OMCT
Batch Level

1
T CODE-OMCZ
Internal batch number assignment activation for batch

2
T CODE-OMAD
No range assignment for batch

T Code- OPKP

Automatic batch creation in production using production scheduling profile

3
Scenario- The business wants to create batch automatically at the production order creation by
the system and also perform the classification of the batch.
Settings in the production scheduling profile
Steps
1. Creation of the finished material and assignment of the production scheduling profile
with the above setting
2. Creation of the characteristics using CT04
3. Creation of the class using CL01
4. Assignment of the characteristics in the class
5. Assignment of the class in the classification view of the finished material
6. Creation of the BOM for the finished material
7. Creation of the routing for the finished material
8. Creation of the PV for the finished material
9. Create production order and see whether batch created or not and system prompts you
to enter the classification data or not

4
Finished goods creation and assignment of the class in the classification view

5
6
BOM

Routing

7
PV

Creation of the production order CO01

8
Batch Determination

9
10
Scenario- The system will display the list of available batches for the components in the
production order.

Steps

11
1. I have created three batches of 100,200 and 300 quantities for the raw material USING
MIGO
2. Create a production order for the finished material and see the results

12
Here, we can enter the batch manually by seeing the batch in the MMBE for the components.
There is one more way.
Click on batch determination icon

13
Click continue

Click without class selection

The system is showing available batches for the selection. Pick anyone batch and enter the
quantity and click on copy icon
System is assigning the quantity to the batch having highest quantity

14
Batch is assigned now

Scenario- There are three production lines in a company. One for manufacturing red paint, one
for manufacturing blue paint and one for manufacturing green paint.
Master Data
Characteristic creation

15
Class creation and assignment of characteristic

Assignment of class in the raw material’s classification view

Select all the color values from the dropdown.

16
Config Path-SPRO>Logistics General>Batch management> Batch determination and batch check
Condition table

Access Sequence

17
Selection class and assignment of characteristic

Sort Rule and assignment of characteristic

Creation of strategy type and assignment of access sequence, selection class and sort rule

18
Search procedure and assignment of strategy type

Assign search procedure to production order type and plant combination

19
Creation of condition record using COB1
Enter strategy, material ,plant and order type

20
Stock situation for the raw materials
Here, two are red batches, one green batch and one blue batch.

Creating a production order

21
Go to components tab and click on batch determination

Here, It is picking the red batches and also picking the batches in the ascending order.

22
If we want to automate this process then select the highlighted option in the MRP 2 view of the
raw material master.

Creating a production order

Releasing a production order


System assigns the batch during release of the production order.

23
24