PROPOSED CONSTRUCTION OF UNIVERSAL SCHOOL OF ADMINISTRATION

_____________________________________________________________________________________________

APPROVED MAKES OF MATERIALS

All bidders must bid on the manufacturers listed in the specifications. Failure to provide a bid that is based on the
manufacturers listed may result in deeming this proposal to be non-responsive.

Bidders are encouraged to bid alternative manufacturers by separately listing manufacturer. model and total cost
differential in the Bidders Alternates.

1. Cement ACC, Birla Super, Ultratech

2. Reinforcement Steel INDUS, BHUVALKA, CHAMUNDI

3. Solid Concrete Blocks Refer Specifications

4. Ceramic Tiles Kajaria, Johnson, Nitco

5. Vitrified Tiles Granamite, Nitco, RBK

7. Waterproofing Compound Fosroc, Roff

9. Aluminum sections Jindal, Indal

10. Glazing Saint Gobin, Modi Guard, Ashai

11. Block Board Greenply, Century, Shogun

13. Laminate Greenlam, Merino,

16. Floor spring Everite

17. Mild steel sections Brite, TATA

18. Mirror Saint Gobin, Modi Guard

19. Paint Asain, Berger

20. Grouting Materials Fosroc, Roffe

21. Locks D-LINK, Godrej

______________________________________________________________________________________________________
M/s SHASTRI ASSOCIATES 2 APPROVED MAKES
PROPOSED CONSTRUCTION OF UNIVERSAL SCHOOL OF ADMINISTRATION
_____________________________________________________________________________________________

22. Mortise Locks D-LINK, Kich

23. Expansion bolts Hilti, Fischer

24. Adhesives Fevicol, Vamicol

25. Powder Coated Hardware Ebco, Earl Bihari

26. GI Sheets Tata, Jindal, Essar

27. Patch fittings Dorma, Ozone

28 Sealant 3M

NOTE:

1. The Contractor shall produce samples before procurement of the material for approval of the Architect for all
materials required for Works. The material of the makes out of the above as approved by the Architect shall
be used on the work

2. In respect of materials for which approved makes are not specified as above, the same shall be decided by
the Architect and shall be as per sample got approved from the Architect before procurement.

3. The Contractor shall submit samples of all materials in advance for approval.

______________________________________________________________________________________________________
M/s SHASTRI ASSOCIATES 3 APPROVED MAKES