Minimum switchgear room height - H: 3≤H<3.5 m


© Copyright 2013 ABB. All rights reserved.

A A
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C
2200

D D

E 30 800 800 800 800 800 1000 E


Total Length: 12660

PANEL 1 A01 2 A02 3 A03 4 A04 5 A05 6 A06


Spare Outgoing Feeder Spare Outgoing Feeder
PANEL NAME Dummy Panel Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Generator Incoming Bay_2000A
Bay_1250A Bay_1250A
CB MECHANICAL CONTROL NO OFF OFF OFF OFF OFF
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F01
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Minimum switchgear room height - H: 3≤H<3.5 m
© Copyright 2013 ABB. All rights reserved.

A A
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

D D

E 800 800 800 1000 800 800 E


Total Length: 12660

PANEL 7 A07 8 A08 9 A09 10 A10 11 A11 12 A12


PANEL NAME Dummy Panel Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Generator Incoming Bay_2000A Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A
CB MECHANICAL CONTROL NO OFF OFF OFF OFF OFF
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F02
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Minimum switchgear room height - H: 3≤H<3.5 m
© Copyright 2013 ABB. All rights reserved.

A A

B B

C C

D D

12.1.2022.
E 800 800 1000 30 E
Total Length: 12660
manufacturing clearance is subject to
complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
PANEL 13 A13 14 A14 15 A15 follow
Aux. Transformer Feeder Bus Riser Bay with Busbar Bus Coupler Bay with Busbar
PANEL NAME
Bay_1250A Metering_4000A Earthing_4000A
CB MECHANICAL CONTROL OFF NO OFF
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F03
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Minimum switchgear room height - H: 3≤H<3.5 m
© Copyright 2013 ABB. All rights reserved.

A A
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

D D

E 30 1000 800 800 800 800 E


Total Length: 12660

PANEL 16 A16 17 A17 18 A18 19 A19 20 A20


Bus Riser Bay with Busbar Bus Riser Bay with Busbar Aux. Transformer Feeder
PANEL NAME Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A
Earthing_4000A Metering_4000A Bay_1250A
CB MECHANICAL CONTROL NO NO OFF OFF OFF
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F04
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Minimum switchgear room height - H: 3≤H<3.5 m
© Copyright 2013 ABB. All rights reserved.

A A
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

D D

E 1000 800 800 800 1000 E


Total Length: 12660

PANEL 21 A21 22 A22 23 A23 24 A24 25 A25


PANEL NAME Generator Incoming Bay_2000A Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Dummy Panel Generator Incoming Bay_2000A

CB MECHANICAL CONTROL OFF OFF OFF NO OFF


F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F05
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Minimum switchgear room height - H: 3≤H<3.5 m
© Copyright 2013 ABB. All rights reserved.

A A
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

2200
D D

E 800 800 800 800 800 30 E


Total Length: 12660

PANEL 26 A26 27 A27 28 A28 29 A29 30 A30


Spare Outgoing Feeder Spare Outgoing Feeder
PANEL NAME Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Dummy Panel
Bay_1250A Bay_1250A
CB MECHANICAL CONTROL OFF OFF OFF OFF NO
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name FRONT VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page F06
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Minimal distance between a wall and a panel must be for wall installation 100 mm lateral and on back side.
For non-wall standing solution must be 800 mm on back side and 100 mm lateral.
© Copyright 2013 ABB. All rights reserved.

A 12.1.2022. A

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

800 800 800 800 800 1000


D D

Total Length: 12600

E PANEL A01 A02 A03 A04 A05 A06 E


Spare Outgoing Feeder Spare Outgoing Feeder
PANEL NAME Dummy Panel Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Generator Incoming Bay_2000A
Bay_1250A Bay_1250A
INTERLOCKING BETWEEN CABLE
No - Segregation Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking
COMP. DOOR AND ES
INTERLOCKING BETWEEN CB
None Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
NO Key Key Key Key Key
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
NO Both Positions Key Both Positions Key Both Positions Key Both Positions Key Both Positions Key
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H01
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Minimal distance between a wall and a panel must be for wall installation 100 mm lateral and on back side.
For non-wall standing solution must be 800 mm on back side and 100 mm lateral.
© Copyright 2013 ABB. All rights reserved.

A 12.1.2022. A

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

800 800 800 1000 800 800


D D

Total Length: 12600

E PANEL A07 A08 A09 A10 A11 A12 E


PANEL NAME Dummy Panel Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Generator Incoming Bay_2000A Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A
INTERLOCKING BETWEEN CABLE
No - Segregation Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking
COMP. DOOR AND ES
INTERLOCKING BETWEEN CB
None Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
NO Key Key Key Key Key
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
NO Both Positions Key Both Positions Key Both Positions Key Both Positions Key Both Positions Key
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H02
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Minimal distance between a wall and a panel must be for wall installation 100 mm lateral and on back side.
For non-wall standing solution must be 800 mm on back side and 100 mm lateral.
© Copyright 2013 ABB. All rights reserved.

A A

B B

C C

800 800 1000


D D

Total Length: 12600

12.1.2022.

PANEL manufacturing clearance is subject to


E A13 A14 A15 E
Aux. Transformer Feeder Bus Riser Bay with Busbar Bus Coupler Bay with Busbar complying with all requirements of approved
PANEL NAME
Bay_1250A Metering_4000A Earthing_4000A MAR, Project Specs and local &
INTERLOCKING BETWEEN CABLE international standards/regulations to be
COMP. DOOR AND ES
Mechanical interlocking No - Segregation Mechanical interlocking follow
INTERLOCKING BETWEEN CB
Mechanical interlocking None Mechanical interlocking
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
Key NO Key
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
Both Positions Key NO Both Positions Key
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H03
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Minimal distance between a wall and a panel must be for wall installation 100 mm lateral and on back side.
For non-wall standing solution must be 800 mm on back side and 100 mm lateral.
© Copyright 2013 ABB. All rights reserved.

12.1.2022.
A A

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

1000 800 800 800 800


D D

Total Length: 12600

E PANEL A16 A17 A18 A19 A20 E


Bus Riser Bay with Busbar Bus Riser Bay with Busbar Aux. Transformer Feeder
PANEL NAME Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A
Earthing_4000A Metering_4000A Bay_1250A
INTERLOCKING BETWEEN CABLE
Mechanical interlocking No - Segregation Mechanical interlocking Mechanical interlocking Mechanical interlocking
COMP. DOOR AND ES
INTERLOCKING BETWEEN CB
Mechanical interlocking None Mechanical interlocking Mechanical interlocking Mechanical interlocking
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
NO Key Key Key Key
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
NO Both Positions Key Both Positions Key Both Positions Key Both Positions Key
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H04
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

A 12.1.2022. A

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

1000 800 800 800 1000


D D

Total Length: 12600

E PANEL A21 A22 A23 A24 A25 E


PANEL NAME Generator Incoming Bay_2000A Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Dummy Panel Generator Incoming Bay_2000A
INTERLOCKING BETWEEN CABLE
Mechanical interlocking Mechanical interlocking Mechanical interlocking No - Segregation Mechanical interlocking
COMP. DOOR AND ES
INTERLOCKING BETWEEN CB
Mechanical interlocking Mechanical interlocking Mechanical interlocking None Mechanical interlocking
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
Key Key Key NO Key
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
Both Positions Key Both Positions Key Both Positions Key NO Both Positions Key
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H05
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Minimal distance between a wall and a panel must be for wall installation 100 mm lateral and on back side.
For non-wall standing solution must be 800 mm on back side and 100 mm lateral.
© Copyright 2013 ABB. All rights reserved.

A 12.1.2022. A

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

B B

C C

800 800 800 800 800


D D

Total Length: 12600

E PANEL A26 A27 A28 A29 A30 E


Spare Outgoing Feeder Spare Outgoing Feeder
PANEL NAME Outgoing Feeder Bay_1250A Outgoing Feeder Bay_1250A Dummy Panel
Bay_1250A Bay_1250A
INTERLOCKING BETWEEN CABLE
Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking No - Segregation
COMP. DOOR AND ES
INTERLOCKING BETWEEN CB
Mechanical interlocking Mechanical interlocking Mechanical interlocking Mechanical interlocking None
DOOR AND WITHDRAW. PART
LOCK ON COVER FOR THE
Key Key Key Key NO
CB-RACK.-CRANK-INSERT. HOLE
LOCK ON COVER FOR THE
Both Positions Key Both Positions Key Both Positions Key Both Positions Key NO
F ES-OPER.-LEVER-INSERT. HOLE F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page H06
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Tolerances for laying the floor frame are:


© Copyright 2013 ABB. All rights reserved.
Evenness tolerance: ± 1 mm within a measuring length of 1 m
Straightness tolerance: 1 mm per 1 m, but not more than 3 mm over entire length of frame.

A A

B B

105 790 105

35
105 590 105
35

131
C 81 C

255
205

843

843
670

670
1285
1390
1235
1340

100 800 100


D 100 600 100 D
65
65
225

225
360

360
311

311
80

80
70

70
E 800 1000 E

12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
PANELS: PANELS: MAR, Project Specs and local &
A02, A03, A04, A05, A06, A08, A09, A11, A06, A10, A21, A25 international standards/regulations to be
follow
A12, A13, A18, A19, A20, A22, A23, A26,
F A27, A28, A29 F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DETAILS DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page J01
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

Tolerances for laying the floor frame are:


© Copyright 2013 ABB. All rights reserved.
Evenness tolerance: ± 1 mm within a measuring length of 1 m
Straightness tolerance: 1 mm per 1 m, but not more than 3 mm over entire length of frame.

A A

B B

105 790 105

85
105 590 105

81
100

C 81 C

1153
843

1700
1545
1405
1235

D D

65
65
225

311

225

40 311
80

70
70

80
12.1.2022.

70
E 800 manufacturing clearance is subject to E
complying with all requirements of approved 1000
MAR, Project Specs and local &
international standards/regulations to be
follow
PANELS: PANELS:
A01, A07, A14, A17, A24, A30 A15, A16

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name SWGR. FOOTPRINT DETAILS DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page J02
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

A A
Front
L1 L2 L3
225 275 275 225
C

40
40 112 30
10
4
Ø1

494
106

219

594
559
2

381

154
GAS DUCT 6
B B
1
LOW VOLTAGE COMPARTMENT
3

705

705
BUSBAR COMPARMENT

REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
5 2 GAS DUCT
TPU 2
2200

310
4
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
C C

2100
4 CIRCUIT BREAKER
5 CURRENT TRANSFORMER
1495
6 IP41 PROTECTION

1495
5
TPU 1 7 BOTTOM PLATE
8
8 EARTHING SWITCH

990
9 HEATER
CABLE COMPARTMENT 9 10 GROUND BUS BAR
11 SURGE ARRESTER
7
D D
C 1000 10
1000 85 1545 70

1153 311
40

E E

1000
790

860
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
105

MAR, Project Specs and local &

70
65

1545
225 80
70
international standards/regulations to be
1650 follow

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K01
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.
L1 L2 L3

A GAS DUCT 106


A

594
559
2

154
6

1
LOW VOLTAGE COMPARTMENT
3
705

705
BUSBAR COMPARMENT

B B
REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
5
2 GAS DUCT
4
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
2100

4 VT TRUCK
5 INSULATORS
C C
5 6 IP41 PROTECTION
1495

1495
7 BOTTOM PLATE
1300

5 8
8 EARTHING SWITCH
9 HEATER
CABLE COMPARTMENT 9 10 GROUND BUS BAR

7
D D
800 10
35 1235 70

Front 81 843 311

E 12.1.2022. E
590

800

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
105

international standards/regulations to be
65

225 80 follow
35 1235 70

1340

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K02
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1 L2 L3
© Copyright 2013 ABB. All rights reserved.

A A
GAS DUCT 106

594
559
2

154
6

1
LOW VOLTAGE COMPARTMENT
705 3

705
BUSBAR COMPARMENT

B B
REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
2 GAS DUCT
4
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
2100

4 CIRCUIT BREAKER
C 6 IP41 PROTECTION C
7 BOTTOM PLATE
1495

1495
9 HEATER
1300

10 GROUND BUS BAR

7
D D
800 10
35 1235 70

Front 81 843 311

12.1.2022.
E E
590

800

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
105
65

follow
225 80

35 1235 70

1340
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K03
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

A A

Front
L1 L2 L3
225 275 275 225
C

40
40 112 30
10
4
Ø1

494
106
219

594
559
2

381

154
GAS DUCT 6
B B
1
LOW VOLTAGE COMPARTMENT
3

705

705
BUSBAR COMPARMENT

REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
5 2 GAS DUCT
C TPU 2 C
2200

310
4
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
2100
4 CIRCUIT BREAKER
5 CURRENT TRANSFORMER
6 IP41 PROTECTION
1495

1495
5
TPU 1 7 BOTTOM PLATE
8
8 EARTHING SWITCH

990
9 HEATER
CABLE COMPARTMENT 9 10 GROUND BUS BAR
D D
7
C 1000 10
1000 85 1545 70

1153 311
40

E 12.1.2022. E

1000
790

860
manufacturing clearance is subject to
complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
105

70
65

1545
225 80
70
follow
1650

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K04
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

L1 L2 L3
© Copyright 2013 ABB. All rights reserved.

A A
GAS DUCT 106

594
559
2

154
6

1
LOW VOLTAGE COMPARTMENT
705
3

705
BUSBAR COMPARMENT
B B
REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
2 GAS DUCT

2200
3 TEE-OFF's (BRANCH CONDUCTOR)
2100

C C
1495

1495
1300

D D
800

35 1235 70

Front 81 843 311

12.1.2022.

E E
manufacturing clearance is subject to
590

800

complying with all requirements of approved


MAR, Project Specs and local &
international standards/regulations to be
follow
105
65

225 80

35 1235 70

1340

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K05
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.
GEN Model
L1 L2 L3

A GAS DUCT A

494
106

594
559
2

154
6

1
LOW VOLTAGE COMPARTMENT
3

705

705
BUSBAR COMPARMENT

B B
REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
2 GAS DUCT
4

310
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
2100
4 CIRCUIT BREAKER
5 CURRENT TRANSFORMER
C 5 6 IP41 PROTECTION C
1495

1495
8 7 BOTTOM PLATE
8 EARTHING SWITCH
25
990

9 HEATER
9 10 GROUND BUS BAR
12 11
11 VT TRUCK
415

CABLE COMPARTMENT
7 12 SURGE ARRESTER
D 1000 10 D
35 1235 70

(81) 843 311

Front 100 100


670

205
360
275

12.1.2022.
E E
1000
800

790

manufacturing clearance is subject to


275

complying with all requirements of approved


MAR, Project Specs and local &
international standards/regulations to be
follow
105
100

225 80
65

35 1235 70

1340
F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K06
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.
L1 L2 L3

A GAS DUCT 106 A

594
559
2

154
6

1
LOW VOLTAGE COMPARTMENT
3
705

705
BUSBAR COMPARMENT

B B
REAR COVER
Item Description
1 LOW VOLTAGE COMPARTMENT
CIRCUIT BREAKER COMPARTMENT
2 GAS DUCT
4
310
9 3 TEE-OFF's (BRANCH CONDUCTOR)

2200
2100

4 CIRCUIT BREAKER
5 CURRENT TRANSFORMER
C C
5 6 IP41 PROTECTION
1495

1495
8 7 BOTTOM PLATE
8 EARTHING SWITCH
990

9 HEATER
CABLE COMPARTMENT 9 10 GROUND BUS BAR
460

7
D D
800 10
35 1235 70

Front (81)
393
843
180 180
311
190

12.1.2022.
210

E E
600

590

800

manufacturing clearance is subject to


210

360 complying with all requirements of approved


MAR, Project Specs and local &
international standards/regulations to be
105
100

65

205 670 225 80


follow
35 1235 70

1340

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name PANEL SECTION VIEW DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page K07
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

1- BUS DUCT - INSERTION PART


2- BUS DUCT - BASE PART
3- FRONT PART
A 4- REAR PART A
5- TOP PART
6- BUS DUCT - Corner duct module

B B

C C

D D

A15 X=2550mm A16


E E
12.1.2022.

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name BUSDUCT DETAILS DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page L01
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

A A

B B

C C

D D

12.1.2022.

manufacturing clearance is subject to


E complying with all requirements of approved E
MAR, Project Specs and local &
international standards/regulations to be
follow

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name BUSDUCT DETAILS DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page L02
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2013 ABB. All rights reserved.

A A

B B

C C

D D

12.1.2022.
E E

manufacturing clearance is subject to


complying with all requirements of approved
MAR, Project Specs and local &
international standards/regulations to be
follow

F F
Based on Prepared TRBUDAL Date 27.12.2021 Title Order No. = K00
Customer Checked TRALUYS Approved TRALUYS COMMON DRAWINGS E21100112 + GA
ABB QATAR Project name BUSDUCT DETAILS DCC Code &ELH Lang. English
Contract No. DUKHAN POWER PLANT 11kV SWITCHGEAR Doc. No. Page L03
Rev. Code Date Name TENDER No. MV SWITCHGEAR ABB Elektrik San. A.Ş. 1YTU210100E0102 Pages 24