Saturn 22 (EU) Installation Manual
Saturn 22 (EU) Installation Manual
Saturn 22kW
Installation Manual
Legal Notice
Company address: No. 39 Longhui Road, Wujin District, Changzhou, Jiangsu, China
This also applies to files that are copied, translated, and photographed, and files that are
NE
Any party who violates this regulation is obliged to compensate for the loss!
1
Contents 3.2 Equipment installation and connection........................................................13
3.2.1 Wall-mounted installation......................................................................13
3 Installation procedure......................................................................................12
3.1 Unpacking and unpacking inspection..........................................................12
3.1.1 Equipment unpacking list........................................................................12
3.1.2 Inspection of unpacking..........................................................................12
3.1.3 Notes of unpacking.................................................................................13
3.1.4 Check before installation......................................................................... 13
NE
NE
2 3
1 General 2 Preparation before installation
1.1 Document purposes 2.1 General construction tools
The purpose of this document is to guide the construction personnel to complete the on-site Table 2 General construction tools
installation of Saturn 22kW WallBox . No. Category Name Use Picture
Cable preparation Stripping of insulation
1.2 Scope of application 1 Electrician knife
tools sheath
• 1.21 Types of equipment applicable to this manual Stripping of insulation
2 Installation tools Wire stripping pliers
layer
European standard Saturn 22kW WallBox Installation personnel
3 Installation tools Wire pressing pliers Terminal bonding
• 1.22 Personnel applicable to this manual
"Garbage disposal" symbol indicates electrical and electronic 11 Installation tools Angle grinder Polishing of materials
waste
This symbol is located on the product, in the instruction manual, or on
the packaging, indicating that electrical and electronic equipment and Cross screwdriver Install and remove
4 its accessories should be separately disposed from ordinary household 12 Installation tools
(full set) screw
waste.
Materials can be reused according to this symbol. By reusing old
equipment, materials and other forms of reuse, you can make a Measuring Horizontal
NE
NE
13 Laser level meter
significant contribution to the environment. instrument measurement
4 5
Measuring Horizontal 7. Those who use mobile power tools must master their use skills and precautions. Wear
14 Horizontal rule
instrument measurement insulated shoes and insulated gloves as much as possible. Metal shell must have ground
12. Pay attention to the ground environmental conditions such as nails and steel bars, and
2.2 Construction materials prevent sticking, bumping, hanging, falling and other injuries.
• 2.2.1 Construction materials 13. The on-site construction protective facilities, safety signs, warning signs, etc. cannot be
9AWG wire corresponding terminals (22kW). removed without authorization.
• 2.2.2 Other materials 14. Strengthen on-site maintenance of construction equipment to maintain intact rate, and
prohibit operation with problems and overloading.
Heat shrinkable tube, electric tape and other accessories .
4. If the work site is dusty or has spray paint work, protective masks must be worn. The concrete foundation for column-mounted charger needs to be poured before the charger
is installed. The size of the concrete foundation is 500mmx350mmx600mm, the buried depth of
5. Do not enter dangerous areas such as the hoisting area and below the vertical operation to
the foundation is 400mm, and the height above the ground is 200mm. The top view is shown
prevent objects from striking.
in Figure 1. The dimension of concrete foundation can be adjusted according to customer’s
6. Keep as far away as possible from various mechanical equipment, electrical circuits, and
NE
NE
requirements and actual conditions on site.The concrete foundationi nspection requirements
prevent mechanical and electrical injuries.
are as follows:
6 7
1. Pay attention to the level correction when pouring the foundation. Figure 2 The three-view drawing of construction
2. The foundation installation is higher than the ground level, and necessary maintenance
walkway are reserved on site depending on the specific space.
3. The drainage outlet on the foundation surface is slightly inclined to avoid accumulation of
water.
5. Reserve an outlet hole on the foundation for cable, as shown in the Figure1.
7. According to the drawing positioning, 4 screws of M10 are embedded in the concrete
foundation in advance and expose 30-40mm on the upper surface of the concrete foundation.
500
200
200
0.00 0.00
500
400
400
100 300
350
Embedded PVC Φ100 tube
500 350
100
175
Wall Wall
800 800
800
The three-view drawing of construction is as follows: Wall-mounted
800 800
NE
NE
Column-mounted
8 9
2. Single or back-to-back parking spaces distance requirements. 2.9 Grounding / insulation resistance requirements
When the charger is installed in the parking space, it is recommended to leave a space of 1. Check the civil grounding resistance test report to ensure that the resistance of the grounding
1200mm between the wheel stop and the charger, as shown in Figure 4. grid produced on site must be ≤ 4Ω.
Figure 4 Parking space distance diagram 2. Check the civil insulation resistance test report to ensure that the insulation resistance of the
cable is ≥ 10MΩ.
1200mm NOTE
the above requirements are the minimum requirements of the equipment. The specific
standards shall be subject to local laws and regulations.
Altitude ≤ 2000m
2.8 Power supply requirements
humidity 5% ~ 95%RH, no condensation inside the product;
1. The power supply mode of the 22kW AC charger is AC three-phase power supply, and the
Degree of dust ≤ 1mg/m3
input electrical requirements are showed as follow:
Corrosive substance No pollutants, such as salt, acid, smoke, etc.
AC working voltage: AC 400V ±10%
Vibration ≤ 1.5mm/s
AC working frequency: 50Hz/60Hz
Insects, pests, vermin, termites No
2. It is recommended that customers install a miniature circuit breaker on the power supply
Mold No
circuit of the charging pile. The miniature circuit breaker needs to meet local regulations. The
recommended specifications of the circuit breaker are as follow: Damp Rainproof
Table 3 Power supply requirements No inflammable material at the top and bottom of the
Fireproof
cabinet
Tripping
Power Series Rated voltage Rated current Quantity
characteristics
NE
10 11
3 Installation procedure • 3.1.3 Notes for unpacking
(1) The installer shall unpack the container in the presence of the owner and fill in the unpacking
3.1 Unpacking and unpacking inspection
record in detail. See appendix 1 for the unpacking record.
• 3.1.1 Equipment unpacking list
(2) After unpacking, please ask the owner's representative to confirm and sign on the equipment
Table 5 Equipment unpacking list
unpacking record sheet.
Equipment
No. Quantity Comments (3) If any problem is found in the process of unpacking and acceptance of the equipment, it
component
1 AC charger 1 / shall not only record the accident, but also wait for the negotiation between the owner and
(2) The installation location should be convenient for charging. When laying the circuit, the wiring
Charging cable hook*2
Charging cable hook
4 1 M5 Cross Combination screw *4 length should be shortened to reduce consumption of resistance energy .
(For CaseC version)
M6 Expansion screw *4
(3) The installation position of the vertical charging pile should not be set at a place where the
5 RFID Card 2 /
terrain is low and water or dripping is easy. The installation should be vertical and the center
6 User manual 1 /
of gravity should not be too high to prevent tipping or tilting. It should not be placed in a place
Column*1
Cable guard*2 with severe vibration or high temperature.
7 Column(Optional) 1
M10 Expansion screw *4
(4) The wall-mounted charging pile must be connected to the wall which can withstand the
M4 Hex socket pan head screw*2
weight of the charging pile and its accessories . The wall-mounted charging pile should not
(5) Check the delivery inspection report and certificate. 3.2 Equipment installation and connection
(6) Check the appearance of the equipment is good, whether there is deformation, knock, stains • 3.2.1 Wall-mounted installation
and other conditions.
(1) Take the drill template from the carton packaging.
NE
NE
(2) Place the drill template at the desired location.
12 13
(3) Use a spirit level to verify that the template is levelled. (9) Install the charger from top to bottom, hang the charger on the two expansion screws above,
(4) Use the drill template to mark the drill holes, shown as Figure 5. and then fix the bottom of the charger on the wall mount with two M6 hexagonal head
192
(6) Push expansion tube into the four drill holes. (10) Use a φ6 drill to drill a hole at a suitable position under the charger, and fix the charging
(7) Attach the mounting block on the wall by expansion screw. cable hook on the wall with the expansion screws.
(8) After tightening the above two expansion screws, screw out 7mm, shown as Figure 6.
Figure 8 Fix the charging cable hook
Figure 6 Marking the drill holes
Wall mout
NE
NE
14 15
• 3.2.2 Column-mounted installation (2) Fasten the column to the concrete foundation with 4M10*120 screws, shown as Figure 11.
(1) Place the column horizontally, and insert the cable into the bottom hole and exit from the
(4) Fasten the wall mount to the column with two M6 Phillips hexagon screws, shown as Figure
13.
NE
NE
16 17
Figure 13 Fixed wall mount (6) After completing wiring, hang the cable guard on the column, and fasten it with two M4 hex
socket pan-head screws to complete the installation , shown as Figure 15. If you need to hang
chargers on both sides, please remove the cover plate on the back of the column.
Cable guard
(5) Install the charger from top to bottom, hang the charger on the two welding screws above
the column, and then fix the bottom of the charger to the wall mount with two M6 hexagon
M4 hex socket pan head screw
socket screws, shown as Figure 14.
(7) Fix the Charging cable hook on the cable guard with M5 screws, shown as Figure 16.
NE
18 19
• 3.2.3 Wire connection Figure 19 Incoming wire connections
(4) If Ethernet communication is required, it should be connected with a network cable. Take out
the rubber plug and waterproof rubber ring, put the waterproof rubber ring on the network
(2) Insert the SIM card supported by the local operator into the slot as Figure 18.
cable, then pass the network cable through the gland and connect to the internal network
Figure 18 SIM card slot
cable interface, shown as Figure 20.
(3) The incoming power cable passes through the waterproof joint at the bottom of the charger. Rubber stopper Waterproof rubber ring
Wiring according to lettering mark (L3/L2/L1/N/PE), then use the cable hoop to fix the
NE
NE
incoming wire, shown as Figure 19.
20 21
4 Post-installation inspection Appendix 1
1. Dispose of all shipping and packaging materials in accordance with local regulations.
Name of Unpacking
2. Clean the charger and surrounding debris, such as small cables, straps, screws/mothers, etc. dealership date
Do not leave the installation tools on site or in the pile (record the type and quantity of tools to
prevent omission). Name of The actual Qualified Equipment
No. Quantity Note
commodity commodity number situation
3. Wipe the insulation with an antistatic cloth. Do not use any corrosive solvents.
4.2 Inspection
2. Check that the internal components of the device are securely fastened.
3. Check that the electrical connections and wiring are correct and complete, that the
connections are secure, and that the grounding is reliable.
4. Check that the degree of protection of the equipment meets the requirements, especially at
the cable entry at the bottom of the pile.
5 Completion information
2 Pre-installation checklist 1 √
Unpacking Installation
Owner unit
conclusion unit
Signature
NE
NE
block
22 23
Appendix 2
Pre-installation checklist
Project name:
Acceptance Treatment
Sub-project No. Main acceptance items
record measures
1 5*AWG9 (coopper)
Cable type
Network cable cat6a (if Ethernet
2
communication is required)
In conclusion:
Note:
(1) In the acceptance record, fill in " √ " or "×" according to the on-site situation;
(2) At the conclusion, fill in "qualified" or "need to rectify" according to the on-site situation
NE
NE
Signature of person in charge of inspection:__________________
24 25
ABOUT US
Headquarter: No.39 Longhui Road, Wujin High-tech
Zone, Changzhou, Jiangsu, China
China Office: Building 5, Innovation and Research
Port, Changzhou, Jiangsu, China
Europe Office: Rugbyring 12, 65428 Rüsselsheim, Germany
APAC Office: 2 Kung Chong Road, #05-01 AA Centre, Singapore 159140