W37 Sep 2023 W38 W39 W40 W41 Oct 2023 W42 W43 W44 W45 Nov
W46 2023 W47 W48 W49 W50 Dec 2023 W51 W52 W1 W2 Jan 2024
W3 W4 W5 W6 Feb
W7 2024 W8 W9 W10 W11 Mar 2024 W12 W13 W14 W15 Apr 2024W16 W17 W18 W19 May
W20 2024 W21 W22 W23 W24 Jun 2024 W25 W26 W27 W28 Jul 2024
W29 W30 W31 W32 W33 Aug 2024 W34 W35 W36 W37 Sep 2024 W38 W39 W40 W41
ACTIVITIES START WD DUE
2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 44 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11

0  Project Initiation 06/Oct 4d 11/Oct Project Initiation


1  De ne project objective… 09/Oct 2d 10/Oct De ne project objectives and scope
2  Establish project team 06/Oct 1d 06/Oct Establish project team
3  Identify project stakehol… 11/Oct 1d 11/Oct Identify project stakeholders
4  Requirements Gathering 04/Oct 17d 26/Oct Requirements Gathering
5  Identify the speci c req… 09/Oct 10d 20/Oct Identify the speci c requirements of the rotary parking system
6  Analyze existing parkin… 12/Oct 7d 20/Oct Analyze existing parking systems and their limitations
7  Conduct interviews with… 23/Oct 4d 26/Oct Conduct interviews with parking system users and experts
8  Document the function… 21/Oct 3d 25/Oct Document the functional and technical requirements
9  Design and engineering of t… 07/Dec 98d 22/Apr Design and engineering of the rotary parking systems mechanical components.
10  Rotary platform design … 07/Dec 17d 29/Dec Rotary platform design and fabrication
11  Parking slots fabrication 15/Dec 11d 29/Dec Parking slots fabrication
12  Supports fabrication 15/Dec 15d 04/Jan Supports fabrication
13  Assembly of the mecha… 16/Apr 5d 22/Apr Assembly of the mechanical components.
14  Integration of the PLC s… 05/Jan 16d 26/Jan Integration of the PLC system with the mechanical components
15  PLC Programming and Con… 04/Oct 86d 31/Jan PLC Programming and Con guration
16  Research and select ap… 04/Oct 13d 20/Oct Research and select appropriate PLC hardware and software
17  Con gure the PLC mod… 23/Oct 55d 05/Jan Con gure the PLC modules and I/O devices
18  Test and debug the PLC… 29/Nov 46d 31/Jan Test and debug the PLC program
19  Data Collection Setup 30/Oct 55d 12/Jan Data Collection Setup
20  Determine the data coll… 10/Nov 16d 01/Dec Determine the data collection methods and sensors
21  Install and calibrate the … 22/Dec 16d 12/Jan Install and calibrate the necessary sensors for data collection
22  Set up the data collectio… 02/Nov 1d 02/Nov Set up the data collection infrastructure
23  Data Collection 20/Oct 86d 16/Feb Data Collection
24  Collect data on parking … 20/Oct 56d 05/Jan Collect data on parking space availability, usage patterns, system performance, etc.
25  Ensure the accuracy an… 26/Jan 16d 16/Feb Ensure the accuracy and reliability of the collected data
26  Monitor the data collect… 24/Nov 33d 09/Jan Monitor the data collection process and make adjustments if necessary
27  Data Analysis 27/Oct 61d 19/Jan Data Analysis
28  Perform statistical anal… 27/Dec 13d 12/Jan Perform statistical analysis on the collected data
29  Apply data mining tech… 27/Oct 56d 12/Jan Apply data mining techniques to identify patterns and trends
30  Visualize the data using… 04/Jan 12d 19/Jan Visualize the data using appropriate tools and techniques
31  System Optimization and Te… 08/Jan 186d 23/Sep System Optimization and Testing
32  Analyze the data analys… 08/Jan 20d 02/Feb Analyze the data analysis results and identify areas for system optimization
33  Implement improveme… 11/Jan 27d 16/Feb Implement improvements based on the ndings
34  Test the revised system… 12/Aug 31d 23/Sep Test the revised system for performance and functionality
35  Documentation and Reporti… 27/Oct 136d 03/May Documentation and Reporting
36  Prepare a comprehensi… 27/Oct 116d 05/Apr Prepare a comprehensive report on the design and implementation of the rotary parking system
37  Document the ndings f… 29/Mar 20d 25/Apr Document the ndings from the data analysis and optimization process
38  Summarize the project … 25/Apr 7d 03/May Summarize the project outcomes and lessons learned
39  Project Review and Present… 01/Mar 76d 14/Jun Project Review and Presentation
40  Conduct a project revie… 01/Mar 41d 26/Apr Conduct a project review with the stakeholders
41  Prepare a presentation … 04/Jun 9d 14/Jun Prepare a presentation summarizing the projects objectives, methodologies, ndings, and recommendations
This is a section 1d