No WBS & Task Description Unit Remaining Trip/day Duration Contingency Remarks Productivity/ Unit Productivities (Resource/day) Resources Name Resources Load (DT)
(Stage-1) Indus Site ID :- IN-3247545 Reference NO. :- R/NN-798296 Site Name :Isadra Opco Site ID :- Vendor Name :- Genuine Teleinfra Pvt Ltd. Tower Height &Wind Speed :- 40 Mtr-kmph-ECOElite-402 District & Circle Name :- Dhrangadhara, District Surendranagar-Gujarat Date of Audit :- Site Address:- Open plot of Mrs Rajanben Mansukhbhai Koli, Plot no. 15, At Moje Isadra village, Taluka Dhrangadhara, District Surendranagar, State Gujarat, Pincode 363310, Police station Isadra
Sr. Stage of Audit Engg.
Item Code Particulars of Items Unit Nos Length Bredth Depth Quantity No Audit Verifed Qty. 1 Excavation_Tower Foundation 1 Cum 25-100000-0-00-ZZ-ZZ- Excavation in all types of soils by Mechanized 1 Cum Methods, (As per Indus Standards and Guidelines) 1 AM9 25-100000-0-00-ZZ-ZZ- Excavation in all types of soils by Mechanized Methods, (As 1 Cum per Indus Standards and Guidelines) 1 AM9 25-100000-0-00-ZZ-ZZ- Excavation in Semi / Soft / Ordinary rock by Mechanized 1 Cum Methods,(As per Indus Standards and Guidelines) 1 AN0 25-100000-0-00-ZZ-ZZ- Excavation in Semi / Soft / Ordinary rock by Mechanized 1 Cum Methods,(As per Indus Standards and Guidelines) 1 AN0 25-100000-0-00-ZZ-ZZ- Excavation in Hard rock (blasting prohibited) by 1 Cum Mechanized Methods,(As per Indus Standards and Guidelines) 1 7.400 2.900 2.500 AN1 81.9 25-100000-0-00-ZZ-ZZ- Excavation in Hard rock (blasting prohibited) by 1 Cum Mechanized Methods,(As per Indus Standards and Guidelines) 1 3.897 2.900 2.500 AN1
Total Quantity 81.9
2 25-100000-0-00-ZZ-ZZ- PCC-M10 (1:3:6)_As per drg. 1 Cum 722 Tower Leg-1,2,3,4,-Footing- 1 Cum 3 2.51 2.51 0.050 0.941
Total Quantity 0.941
3 15-100000-0-00-ZZ-ZZ- Tor-Steel 1 Kg Dia Length Nos Total weight
Unit/kg 847 1 1 Kg 12 1.850 42 0.890 69.153
1A 1 Kg 12 2.600 66 0.890 152.724
2A 1 Kg 12 2.600 72 0.890 166.608
3A 1 Kg 12 0.900 27 0.890 21.627
4 1 Kg 20 3.700 12 2.470 109.668
4A 1 Kg 16 3.500 24 1.580 132.720
5 1 Kg 16 2.485 12 1.580 47.116
6 1 Kg 8 2.200 60 0.390 51.480
7 1 Kg 8 1.820 24 0.390 17.035
7A 1 Kg 8 1.580 84 0.390 51.761
5% Wastage as per drg. 1 Kg 52.500
Total Quantity 872.392
4 2D-100000-0-02-ZZ-ZZ- Reinforced Cement Concrete - M 20 grade (1:1.5:3) 1 Cum 832 excluding reinforcement steel,(As per Indus Standards and Guidelines) Tower Footing-Step-1 1 Cum 3 2.5 2.5 0.200 3.765
Tower Footing-Step-2 1 Cum 3 1.4 1.4 0.200 1.181
Tower Column-1,2,3,4 1 Cum 3 0.600 0.600 1.500 1.620
Total Quantity 6.566
5 2D-300000-C-00-ZZ-ZZ- Shuttering for Eco/Eco lite Sites - MS Sheet / B37 1 Sqm Plywood (As per Indus Standards and Guidelines)
No WBS & Task Description Unit Remaining Trip/day Duration Contingency Remarks Productivity/ Unit Productivities (Resource/day) Resources Name Resources Load (DT)