Quantity Measurement Sheet

(Isolated Civil Foundation for GFT sites)


(Stage-2&3)
Indus Site ID :- IN-3247545 Reference NO. :- R/NN-798296
Site Name :Isadra Opco Site ID :-
Vendor Name :- Genuine Teleinfra Pvt Ltd. Tower Height &Wind Speed :- 40 Mtr-kmph-ECOElite-402
District & Circle Name :- Dhrangadhara, District Surendranagar-Gujarat Date of Audit :-
Site Address:- Open plot of Mrs Rajanben Mansukhbhai Koli, Plot no. 15, At Moje Isadra village, Taluka Dhrangadhara, District Surendranagar, State Gujarat, Pincode 363310, Police station Isadra

Sr. Audit Engg.


Item Code Particulars of Items STAGE Unit Nos Length Bredth Depth Quantity
No Verifed Qty.
1 24-600000-0-00-ZZ- Fixing & Levelling of Foundation Bolt & Tower Cast In Part
ZZ-F07 (CIP) Per site

Shifting & Setting of Templates & F/N Bolts 2 Per site 1 1.000

Total Quantity 1.000


2 2D-100000-0-02-ZZ- Reinforced Cement Concrete - M 20 grade (1:1.5:3)
ZZ-832 excluding reinforcement steel,(As per Indus Standards and Cum
Guidelines)
Tower Coloum 2 Cum 3 0.600 0.600 1.050 1.134

Total Quantity 1.134


3 2D-300000-C-00-ZZ- Shuttering for Eco/Eco lite Sites - MS Sheet / Plywood (As
ZZ-B37 per Indus Standards and Guidelines) Sqm

Tower Coloum 2 Sqm 3 2.400 1.050 7.560

Total Quantity 7.560

4 25-1B0000-0-00- P&L Earth filling taking from out side and free from vegitation mud
ZZ-ZZ-621 rocks etc, in layer 15-20cm and each layer consolidated /
Cum
compacted up to max level by dressing, watering and ramming.

Excavated Soil Back filling 2 Cum 1 7.400 2.900 2.500 53.650


Excavated Soil Back filling 2 Cum 1 3.897 2.900 2.500 28.253
Total Quantity 81.903
DIDUCTION IN PLOT FILLING 2
Tower Leg-1,2,3,4,-Footing- 2 Cum 3 2.51 2.51 0.050 0.941
Tower Footing-Step-1 2 Cum 3 2.5 2.5 0.200 3.765
Tower Footing-Step-2 2 Cum 3 1.4 1.4 0.200 1.181
Tower Column-1,2,3,4 2 Cum 3 0.600 0.600 2.050 2.214
Total Quantity(B) 8.101

Total Quantity(A-B) 73.802

5 2D-100000-0-00- Services for Civil Works, 2M Hight Plinth,(As per Indus Standards
ZZ-ZZ-K16 3 EACH 1 1.000
and Guidelines)

Total Quantity 1.000


6 24-900000-0-00-
Earthing activity_ 3
ZZ-ZZ-022
Boring Charges for Rocky Soil - Maintenance Free Earthing for
3 Per Pit 2 2.000
GBT/RTT (Per Pit)

Total Quantity 2.000

Audit Engineer Build Vendor Site Incharge


Name : Name :
Signature : Signature :

Date : Date :