Download as pdf
Download as pdf
You are on page 1of 1
RITES-NIPPON KOE]-AARVEE ry ah wat fy i coach Yoho) @ cecconnenmnaymc-cyane/ 512, bate: 3008 2024 te, Prot Marae, ‘eons nectar United Costing Yr doe Cc, Sandhogs 32007, atin {Wind Attention: Mr, Vivek Khana, Project Manager Project: “Construction of 8.124 km Elevated Viaducts and & Stations from Ch 17334.443m to 25467 443M I) 5.20 Km Elevated Viaduct and 3 Stations from GNLU to GIFT ity and il) (0815 Km Elevated Vioducts and Additional Platform at Koteswar Rosé Staton For ‘Ahmedabad Metro Ral Project Phase - 1 from Matera Stadlum to Mahatma Mandl and CGNLU to GFT Gy (Gx, EAM, Architectural Fishing and Rooting) Package C1" ‘Sub: Regarding Span Load tet for C1 Package Ret: 1) MRC meeting dated 15.03.2024. 2) GNC ral dated06.03 2024 3) GEC letter no-GEC-GMRCL-PH2/PKG-C1/2023/2999 dated 05.01 2026 4) AFCONS letter no, GMACL/AMO

You might also like