{Wind Attention: Mr, Vivek Khana, Project Manager
Project: “Construction of 8.124 km Elevated Viaducts and & Stations from Ch 17334.443m to
25467 443M I) 5.20 Km Elevated Viaduct and 3 Stations from GNLU to GIFT ity and il)
(0815 Km Elevated Vioducts and Additional Platform at Koteswar Rosé Staton For
‘Ahmedabad Metro Ral Project Phase - 1 from Matera Stadlum to Mahatma Mandl and
CGNLU to GFT Gy (Gx, EAM, Architectural Fishing and Rooting) Package C1"
‘Sub: Regarding Span Load tet for C1 Package
Ret: 1) MRC meeting dated 15.03.2024.
2) GNC ral dated06.03 2024
3) GEC letter no-GEC-GMRCL-PH2/PKG-C1/2023/2999 dated 05.01 2026