Ser.
Description Quantity Unit Rate Amount
No.
1 kitchen work
` old wall dismantling and malba cleaning
7000
b new kitchen slab Rcc and marble feting’s
80000
c new wood work complete kitchen
200000
old window replaced in Aluminum window and
d closed door with brick work and plaster 50000
e new kitchen exhaust feting’s 6000
f Tile walls work
40000
g old beam repairing and plaster work 10000
393000
2 living Area
a old wood Almarai and wall dismantling
10000
b new brick work columns and plaster 25000
B
new Guarder pop celling cladding and paint 40000
d celling work pop Guarder clad 20000
95000
3 Ground floor and 1st Floor door Repairing
a old door repairing and polish work 50000
b some door lock changed 5000
c 1 door frame changed 7000
d complete door wood border and polish 15000
77000
4 paint work internal and external Roof and
walls
a complete internal walls and roof paint Ash white
plastic emulsion 70000
b external Area Garage and front Area weather
sheet 90000
160000
5 Stair work Floor and stair reeling
a Marble work and complete feting’s 85000
b new reeling ss 60000
145000
6 pouder room door opening and new feting’s
a open door in brick work wall
5000
b feting’s new door fiber /pvc 15000
20000
7 Main Gate work
a MS sheet Gate 12' wide openable 90000
8 servant Quarter
a servant Quarter extend R.b slab 40000
b Repairing work walls plaster and paint 20000
c floor p.c.c work 20000
d new door feting pvc / fiber 25000
105000